Metro Reports: 10th & Yamhill Smart Park, 203 NE Grand, Providence Park, and more

10th & Yamhill Smart Park

Building permits are under review for the renovation of the 10th & Yamhill Smart Park Garage

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers November 20th to November 27th, 2017.

Early Assistance has been requested by Carleton Hart Architecture for a project at 320 NW Hoyt St:

Renovation of existing (vacant) 3-story warehouse to be used as a shelter

Early Assistance has been requested by BAMA Architecture & Design for a project at 1537 SE Morrison St:

Future code – Evaluation of options for development of property.

A Pre-Application Conference has been scheduled to discuss a project at 12400 SE Schiller St:

Future code – Two planned multi-dwelling unit buildings with associated utilities, parking, and walkways on two existing legal lots of record.

A Pre-Application Conference has been scheduled by Ankrom Moisan Architects to discuss a project at 203 NE Grand Ave:

Current code: New eight story mixed use project with apartments on levels 2-8. Ground floor retail. Amenities include a lounge, fitness, leasing, bike storage and bike lounge, pet area and pet wash area.

A Pre-Application Conference has been scheduled by GBD Architects to discuss a project at 236 SE Grand Ave:

Current code – Proposal to build seven story B occupancy office building on the 1.2 block between SE Pine and SE Ash on SE Grand Ave. The structure will be approximately 100 feet tall with a gross area of approximately 107,000 square feet.

The renovation of 10th & Yamhill Smartpark Garage has been submitted for building permit review by FFA Architecture & Interiors:

Addition to parking garage. Replace northeast and southwest stair and elevator towers with new (demo’d under permit 17-273719-co). Demolish northwest and southeast stair and elevator towers. Reconfigured first floor layout including partitions for shell tenant spaces and addition to first floor shell tenant spaces at northeast and southwest corners. Repair and maintenance throughout parking levels. Accessibility upgrades. ***mechanical permit separate***

Alteration to parking garage. Selective demolition of the northeast and southwest corner stair and elevator towers, and demolition of interior partitions on the first floor tenant spaces. Related selective demolition of mechanical, electrical and plumbing systems.

A structural permit was issued to Allied Works Architecture for the Providence Park Expansion:

STR 02: All micropiles shown on sheets S200C, 2001A, and 2002A; Shotecrete slabs on the hillside shown on S2001A at the north and south ends. This includes pile cap tie reinforcement that would be located within the shotcrete slabs.

Leave a Reply