Weekly Roundup: Weatherly Building, The Redd, Residential Infill, and more

Weatherly Building
A new 12-story office building designed by Perkins+Will is proposed adjacent to the Weatherly Building, as part of a project that will also include the seismic retrofit of the 1927 landmark stucture.

A 12-story mixed-use office and retail building at 510 SE Morrison St, adjacent to the Weatherly Building, has been proposed by developer Unico. At an initial Design Advice meeting the Landmarks Commission “recommended changes to the building’s massing, materials and height“*, writes the Daily Journal of Commerce.

The Oregonian reported that Portland is drafting new historic preservation rules intended “to wrest back local control“.

The second phase of the The Redd will completely open on March 2, according to a story in the Business Tribune.

NBP Capital has acquired the former Sunshine Dairy site at 801 NE 21st Ave, writes the Portland Business Journal (subscription required). An Early Assistance application was submitted in January for a 7-story building with 300-350 residential units.

Neighborhood activists thought the Residential Infill Project would protect neighborhoods from McMansions, but “did not see the fourplexes on the horizon“, writes the Portland Tribune. The project, which will go in front of City Council this summer, is seeing the strongest opposition in neighborhoods that “tend to be more affluent and the least affected.”

*This article will be unlocked for the rest of this week. After this week it will only be viewable by DJC subscribers.

Metro Reports: Meyer Memorial Trust HQ, Moxy Hotel, 4804 SE Woodstock, and more

Moxy Hotel
A building permit has been issued for the 197 room Moxy Hotel, which will be built at SW 10th and Alder.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers February 4th to February 10th, 2019. 

Early Assistance has been requested by Leeb Architects for a project at 4804 SE Woodstock Blvd:

Proposed full block building at SE Woodstock and 48th Avenue consists of 178 apartments on five floors. The building also includes a full basement with parking for 130 automobiles spaces. There is also a 5,000 SF commercial retail space on the Ground Floor. The structure of the building will be comprised of a concrete basement level (parking garage) with five floors of wood frame residential construction above

A project at 7433 N Chicago Ave has been submitted for building permit review:

New three story 11 unit apartment building with shared cortyard (see 19115675 CO)

New 12 unit three story apartment building with shared cortyard (see 19-115695 CO)

The Meyer Memorial Trust Headquarters at 2045 N Vancouver Ave has been submitted for building permit review:

New construction of 3 story office building and associated sitework

A building permit was issued to Opsis Architecture for the Oregon Harbor of Hope at 1111 NW Naito Parkway:

New navigation center to provide short-term shelter and navigation toward social service programs

A building permit was issued for the Moxy Hotel at 585 SW 10th Ave:

New 12 story, 197 unit hotel w/ associated sitework (no onsite parking); ecoroof *** mechanical permit to be separate ***

PAE Living Building Receives Design Advice (images)

A proposal to build a mixed-use retail and office building, designed to meet the Living Building Challenge, has gone in front of the Historic Landmarks Commission to receive design advice. The PAE Living building is being designed by ZGF Architects, with developer Gerding Edlen acting as the owner’s representative. PAE Engineers would be one of the occupants. The 5-story building would include nearly 5,000 sq ft of ground level retail space, with four floors of office above it. No vehicular parking is proposed.

PAE Living Building
Read More

Weekly Roundup: Hallock-McMillan Building, Beatrice Morrow, the Hoxton, and more

Hallock-McMillan Building
Work has started on the restoration of the Hallock-McMillan Building. Design work for the restoration is being led by Emerick Architects, for building owner Russell Fellows Properties.

The Daily Journal of Commerce wrote about the rehabilitation of the Hallock-McMillan Building. The city’s oldest commercial building is “receiving a major renovation intended to restore the look and feel of the original brick masonry and cast iron.”

The Willamette Week reported that months after completion the Beatrice Morrow, an affordable housing development on NE MLK, was mostly empty despite applications from more than 1,500 people.

Portland Architecture spoke to Surround Architecture’s Mark VanderZanden and Ennismore’s Chris Stringfellow about how the old Grove Hotel became The Hoxton.

A groundbreaking ceremony was held for the Oregon Harbor of Hope homeless shelter and navigation center, reports the Portland Tribune.

Metro Reports: L&L PDX Hostel, De Paul Treatment Center, Argyle Apartments, and more

REACH CDC’s Argyle Apartments will add 189 units of affordable housing on surplus property formerly owned by TriMet.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers January 28th to February 3rd, 2019. 

Design Advice has been requested by Holst Architecture for the De Paul Treatment Center at 830 SE 102nd Ave:

55,000 square foot drug and alcohol treatment center for adults, possibly could expand to 65,000 square feet and include services for youth. The current proposal includes 70 beds in sleeping units for short term treatment and 24 beds for detox treatment. The proposed structure would also include dining and amenity spaces for residents as well as administrative spaces

Early Assistance has been requested by Dao Architecture for a project at 5403 SE 122nd Ave:

Work Proposed: Proposed building is a single 4-story, wood-framed structure, providing 65 units of affordable housing and approximately 18 covered, but not enclosed parking spaces. R-2 occupancy, Type V-A, NFPA 13R sprinklered. Building is U-shaped, ground floor common room and support spaces, surrounding an interior court/garden.

Early Assistance has been requested by Holst Architecture for a project at 2510 NE Sandy Blvd:

Renovation of existing warehouse building with work that will include demolition of existing offfice, portion of building, reconstruction of exterior wall to enclose warehouse building, seismic upgrade, energy code upgrades, new utilities, new roof, site upgrades and ROW upgrades. The project will include an occupancy change to OCCUPANCY B

Early Assistance has been requested by Brett Schulz Architect for a project also located at 2510 NE Sandy Blvd:

Demolish northern portion of existing 1-story industrial building. Construct new 49-unit multifamily building with affordable housing and ground floor retail. Community design standards are being used.

A project at 5136 N Lombard St has been submitted for building permit review by Studio 3 Architecture:

New 4 story, 36 unit apartment building with (2) tenant spaces on ground floor, includes associated sitework *** mechanical permit to be separate ***

The renovation of the Medallion Apartments at 1969 NW Johnson St has been submitted for building permit review by Holst Architecture:

F37/ medallion apartments all flrs TI; exterior – replace reroof, windows, doors, curtain walls, parking lot, plaza areas, stormwater planters, walkways, install new entrance canopy & covered trash enclosure; interior – 1st flr demo walls, new walls to create laundry rm, community rm, bathrms, offices, maintenance rm; all flrs remodel units, ceiling, flooring, finishes, plumb and elec

A building permit was issued to MWA Architects for the Argyle Apartments at 2133 N Argyle St:

New construction of 151,555 sq ft, 4-story apartment bldg – 189 affordable housing units, 2 community rms and site work

A building permit was issued to Woodblock Architecture for the L&L PDX Hostel at 1616 E Burnside St:

New 5 story, 88 unit hostel with restaurant and coffee shop for hostel on first floor, includes associated sitework *** mt permit to be submitted separately ***

Hyatt Place Receives Design Advice (images)

A proposed 23 story tower in the Pearl District has gone in front of the Design Commission to receive Design Advice. The project is being developed by Vibrant Cities in partnership with the Sunray Group, with design by Otak. The lower 11 floors of the 250′ tall building would be occupied by a Hyatt Place branded hotel. The upper 12 floors would be residential, with 120 apartment units. No vehicular parking is proposed.

Hyatt Place
Read More

Weekly Roundup: OHSU Schnitzer Campus Block 6, PAE Living Building, Holden of Pearl, and more

Block 6 will be the next part of the OHSU Schnitzer Campus to be built out. The building will front onto SW Bond Ave, which is currently under construction.

The Portland Business Journal reported on the OHSU Schnitzer Campus Block 6, which form the next phase of the hospital’s South Waterfront development (subscription required). The hospital intends to build a $75 million parking structure with 1,200 spaces. The Portland Housing Bureau and a developer will fund the construction of a $40 million 121-unit affordable housing component.

The PAE Living Building proposal for Old Town drew praise* from the Historic Landmarks Commission, writes the Daily Journal of Commerce.

The Oregonian wrote about the Holden of Pearl, the senior living tower proposed in the Pearl District.

Craig Cheek of the Portland Diamond Project spoke to the Oregonian about the baseball stadium, ticket prices and state bonds.

*This article will be unlocked for the rest of this week. After this week it will only be viewable by DJC subscribers.