Metro Reports: Jupiter Hotel, 1201 NW Naito, Kellogg Middle School and more

Jupiter Hotel

A building permit was issued for the Jupiter Hotel expansion

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Early Assistance has been requested by Fosler Portland Architecture for a project at SW 36th Ave & Troy St:

New Mixed Use Building on vacant sloping lot. First 2 stories office and retail top 2 stories will have 4-8 apartments.

Early Assistance has been requested by Michael Green Architecture for a project at 1053-1201 NW Naito Parkway:

New 7-18 story Apartment Building – Timber (CLT) Construction – 2 levels for parking. 3 Development plans, some affordable housing proposed.

Early Assistance has been requested for a project at 1945 NW Raleigh St:

New 4 story 18 unit apartment building.

Early Assistance has been requested by Encore Architects for a project at 1337 E Burnside St:

The project consists of a six-story approximately 200 unit apartment building with below-grade parking for approx. 118 vehicles.

Early Assistance has been requested by TVA Architects for a project at 2880 SE Division St:

4-story mixed-use multi-family apartment project with ground floor leasable space, lobby, MEP/Utility/Service space, and three elevated apartment floor levels (combo of studio and one-bedroom units for a total of 67 units). Onsite surface parking will be provided. They may need an adjustment to parking stall width.

Early Assistance has been requested by Oh Planning + Design for a project at Kellogg Middle School

Redevelopment of middle school (Kellogg Middle School), either by new addition and renovations – or replacement of 100,000+ sq ft school.

A Pre-Application Conference has been scheduled by Köz Development for a project at 1111 NW 16th Ave:

New 95 studio unit apartment building, no parking proposed. A eco roof for stormwater management with flow through planters in the courtyard to manage impervious areas outside of the roof.

A Pre-Application Conference has been scheduled for a project at 1500 NE Irving St: 

Proposal is new construction of a four story apartment building with 60 units with tuck under grade level parkiing. Existing parking lot to be re-striped to provide parking lots for both existing office and new apartment building.

A Pre-Application Conference has been scheduled by Work Progress Architecture for a project at 330 SW 10th Ave:

New 23 Story Mixed Use Building – Existing Historic Federal Exchange Building to remain on site.

A Pre-Application Conference has been scheduled by TVA Architects for a project at 820 SE Alder St:

New multi-family residential development with ground floor retail and underground parking garage. 6 stories (67′ tall) with a combo of studio, 1 and 2 bedroom living units.

A project at 1650 NW Naito Parkway has been submitted for Type III Design Review by TVA Architects:

new 17 story apartment building. 258 residential units are proposed. The first floor will have both residential and parking. There are 192 underground parking spaces. The access for the parking would be from NW Naito. Two loading spaces are proposed. The property will be divided to create a 79,700 square foot site for this development.

A project at 306 SE 8th Ave has been submitted for Type III Design Review by SERA Architects:

Demo existing building, new development of 7 story 120 unit residential apartment building with ground floor retail and underground parking. 2 modifications , bike parking width &size of parking stalls.

A foundation permit was issued for 1133 SW Market St:

STR – to include Structure, Shoring, Ground Improvements and MEP underground

A building permit was issued to Studio3 Architecture for a project at 4030 N Vancouver Ave:

New mixed use building, 5 stories with ground floor commercial use and 49 apartment units above

A building permit was issued to Works Progress Architecture for the Jupiter Hotel Expansion:

Construct new 6 story mixed use building, includes event space and restaurant, floors 3-6 are hotel rooms, no parking. Site work and stormwater management included.

Weekly Roundup: Overlook Pointe fire, 10th & Yamhill Smart Park, Field Office, and more

10th & Yamhill Smart Park

Conceptual image of a renovated 10th & Yamhill Smart Park garage (image by FFA Architecture & Interiors)

The Portland Development Commission received three offers for Centennial Mills, according to The Oregonian. All three offers, valued at $1,000, $100,000 and $3.45 million, were rejected. The redevelopment agency will now consider “how/whether to reengage the market”.

The DJC reported that the under construction Overlook Pointe condominium development at 5425 N Minnesota Ave was burned down in a fire* early Wednesday morning.

The PDC voted to sell property at 1053–1201 NW Naito Parkway to The Wolff Company for $9 million. The Oregonian reported that the developer plans to build 340 apartments on the site, 68 of which would be affordable for at least 10 years.

KGW covered the 1,200 apartments coming to the area in and around the Con-way Masterplan area in NW Portland. Construction is underway on Blocks 294E and 295E and the Leland James Buildingwhich are following on from the LL Hawkins and Slabtown MarketplaceImmediately outside of the masterplan area is Q21, which is nearing completion.

The Portland Tribune wrote about the “new mood in Chinatown“, which after decades of divestment might be seeing a change in its fortunes. The Society Hotel opened last year, and will soon be joined by the newly renovated Mason Erhman Building Annex, Overland Warehouse Company Building and Grove Hotel.

The Portland Mercury profiled Swift Real Estate Partners, the San Francisco Investment Firm that is “Snatching Up Old Town Real Estate“. The company’s acquisitions include the New Market Theatera historic building adjacent to the Skidmore Fountain that could receive a significant addition.

Project^’s Field Office will create a “300,000-square-foot urban campus“, according to the Portland Business Journal. Construction recently started on the Hacker-designed buildings at NW Front and 17th.

More than 1,000 people applied for the 65 housing units available to people displaced from North and Northeast Portland, according to The Oregonian.

The City is planning a $25 million renovation of the 10th & Yamhill Smart Park, according to the Portland Business Journal. The scope of the project will include addressing seismic and ADA deficiencies in the existing structure.

Three new surf shops are set to open in the next year, reports The Oregonian. These include Cosube, which will open in Slate at the Burnside Bridgehead, and Leeward Northwest Surf & Sea, which will open in New New Crusher Court at 2450 NE Sandy Blvd.

According to the Portland Business Journal, furniture retailer Room & Board will open next year in the Pearl District’s newly renovated Fisk Tire Company Building.

The Business Tribune wrote about a day in the life of the team at OHSU working on the Knight Cancer Research Building.

*This article will be unlocked for the rest of this week. After this week it will only be viewable by DJC subscribers.