Metro Reports: Nomad, 1921 SE 3rd, 1710 NE Multnomah, and more

Nomad 1431 N Church St

The Nomad development, as presented to the Design Commission at a Design Request Advice meeting on September 20th. The 130-unit development is being designed by Works Progress Architecture.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers September 10th to September 16th, 2018. 

Early Assistance has been requested by Scott Edwards Architecture to for a garage at 1988 SE 3rd Ave, intended to serve the office development at 1921 SE 3rd Ave: 

Proposed 4-story parking garage with approximately 120 parking spaces that will serve the proposed industrial office building across the street at 1921 SE 3rd Ave. This parking structure will be open with natural ventilation of most likely concrete construction. A new driveway is proposed near the northwest corner of the lot onto SE 3rd Ave for access. There should be enough landscape area remaining to take care of stormwater plus any additional drywells under the parking are if required. See EA 17-165761 for information on the office building development.

Early Assistance has been requested by Concord Hospitality Enterprises for a project at 1710 NE Multnomah St:

Demo aging existing 180+ room extended stay hotel and replace with approximately three hotel brands equaling 450 rooms.

Early Assistance has been requested by Ankrom Moisan Architects for a project at 2148 NE Martin Luther King Jr Blvd:

Construction of a new 3-story office building (approximately 30,000 SF). Two retail locations within the building along MLK on north and south corners. Public parking proposed on R101769. Private parking below level 2. All parking is surface parking. Proposed disposal of stormwater to be infiltration on site.

Early Assistance has been requested by Edge Development to discuss a project at 5665 NE Glisan St:

Demolish two existing single story garages and construct three, 3-story multi-family residential (30 units total).

Early Assistance has been requested by Fosler Portland Architecture for a project at 9501 N Ivanhoe St:

This is a zoning inquiry prior to proposing a project. Option 1 is to renovate the existing non-confirming use (grocery store to remain) plus a new 2nd floor ddition for one apartment. Option 2 is to replace the building with a new building to contain ground floor commercial and 2nd floor residential. No development is being proposed at this time.

A project at 5321 NE 13th Ave has been submitted for Type II Conditional Use Review:

Demolish existing structure and construct a new 5-unit multi-family building. Property was originally part of a Conditional Use Review (07-108596).

Nomad at 1431 N Church St has been submitted for Type II Design Review by Works Progress Architecture:

Proposed development is for a seven story building occupying a half city block at N Interstate Ave btwn N Church and N Maryland Ave. The site currently has four structures that will be removed. The proposed building use includes at-grade surface parking, with retail lobby, residential amenities and a residential unit at grade. The next floors with consist of six levels of residential units above.There will be a large shared kitchen,gathering room and covered outdoor space on the 6th floor. Parking and loading access to the site will be from N Maryland Ave along the east edge.

A building permit was issued for a project at 1213 N Alberta St:

Construct new (3) story 14 unit apartment building with bike storage and trash area on level 1; associated site work

Metro Reports: NE 106th & Halsey, 140 SW Columbia, Moxy Hotel, and more

NE 106th & Halsey will include a mix of affordable and market rate housing, adjacent to the new Gateway Discovery Park. Image taken from the presentation to the Design Commission in February 2018.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers May 7th to May 13th, 2018. 

Early Assistance has been requested by Portland Development Group for a project at 2824 NW Upshur St:

Demolish existing house and build a new 5-unit multi-dwelling building.

Early Assistance has been requested for a project at 1809 NW Davis St:

Redevelopment of the 20,000 sf surface lot across the street and east of the main Trinity Cathedral campus, with the potential of including the 10,000 sf parcel in the SE corner of the same block. The primary purpose is to expand parking capacity for the Trinity Cathedral on Sundays through a shared parking arrangment with a new commerical and/or mixed use development on the site. Both sites have requested a zone change to CM3 through the Map Refinement Project.

Early Assistance has been requested by Ink Built Architecture for a project at 6716 NE Garfield Ave:

Future code: New apartment building. 3 stories with partial basement, 28 units all affordable housing, modular construction. Meeting community design standards. No design district. D-overlay

The redevelopment of Kellogg Middle School at 6909 SE Powell Blvd has been submitted for a Type III Conditional Use Review:

Redevelop the entire Kellogg Middle School site. Demo existing structures and remove the debris. Development of vacant field since the property will then be graded and reseeded in anticipation of the redevelopment of the site in spring 2019. The cleaned site will house a new 105,000 sf school structure, off street parking area and bus loop, recreation field, and a limited service access road. The off-street parking area will contain 34 parking spaces, 2 of which will be handicapped and 2 carpool parking spaces. A free-standing obelisk sign will be located at the corner of SE Powell Blvd and 69th Ave.

A project at NE 106th & Halsey has been submitted for Type III Design Review by Holst Architecture:

Mixed use development fronting SE Halsey and Gateway Discovery Park and includes 40 units of affordable housing and 35 units of market rate housinig. Retail spaces and residential amenity spaces on the ground floor, office space and residential units on the second floor and dwelling units on floors 3-6.

A project at 105 N Killingsworth St has been submitted for Type III Design Review by Kōz Development:

New mixed-use 4-story building with 87 dwelling units, 2400 sq ft of commercial space, associated bike parking and back of house service areas.

A project at 6144 SE Foster Rd has been submitted for building permit review by Merryman Barnes Architects:

Change of occupancy from M and B to R-2 and A-2, S-1 for new tenant to include sleeping beds, commons, kitchen bathrooms, showers, storage; seismic upgrades and exterior site improvements

140 SW Columbia has been submitted for building permit review by GBD Architects:

New 20 story, mixed use residential tower. Tower will span over existing parking entrance. Project will include 348 residential dwelling units, 244 parking spaces and approx 15,000 sf shell commercial space

A project with two buildings at 4242 SE Milwaukie Ave has been submitted for building permit review:

Construct new 3 story (12) unit apartment building with below grade parking and trash area; associated site work

Construct new 1 story building for new community center and fitness center

A project at NE Alberta and 26th has been submitted for building permit review by Steelhead Architecture:

New 3 story, 11 unit apartment building with retail on main floor, includes associated sitework *** w/ 18-168776-MT ***

A project at 2005 N Rosa Parks Way has been submitted for building permit review by William Wilson Architects:

Construct new 4 story (66) unit apartment building with lower level courtyard, bike storage, and utility; associated site work

A project at 1215 N Alberta St has been submitted for building permit review:

Construct new (3) story 14 unit apartment building with bike storage and trash area on level 1; associated site work

The Moxy Hotel at 539 SW 10th Ave been submitted for building permit review:

New 12 story, 197 unit hotel w/ associated sitework (no onsite parking) *** mechanical permit to be separate ***

A building permit was issued to CIDA Architects for a project at 4975 NE 14th Pl:

New 3 story, 15 unit apartment building, includes associated sitework

A structural permit was issued to SERA Architects for the hotel at 619 SW 11th Ave:

STR – New, 15 story hotel – STRUCTURAL AND BELOW GRADE WORK ONLY, Below grade electrical and plumbing work, mat slab foundation system, concrete shear walls and columns and PT concrete decks.

A buiding permit was issued to Skylab Architecture for Block 76 West (previously known as Sideyard) 365 NE Couch St:

New 23,569 sf 5 story mixed use bldg. Primary bldg. Occupancy is mercantile (M) with storage (S) and business (B). Bldg. Will be fully sprinkled and iii-a type of construction. Core and shell construction.