Metro Reports: Division 33, Convention Center Hotel, New Omni, and more

The Theory 33 Flats will include 30 residential units over ground floor retail.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. (Note: this post covers August 7th to 13th, 2017; last week’s intakes will be covered in a subsequent post.)

Early Assistance has been requested for a project at 1602 SE Tacoma St:

Proposal is to construct a twelve unit apartment building with one and two bedroom units alongside a pedestrian passageway and a central stair to the upper units. Concept development from building at 686 SE Spokane St. The existing structure will be deconstructed by a certified deconstruction contractor. The applicant wishes to use Community Design Standards and wishes to confirm that a Type II Design Review will not be required. Applicant will use current zoning code for review.

Early Assistance has been requested by DiLoreto Architecture for a project at 6615 SE 52nd Ave:

Current code. 32 unit housing constructed within an existing office building. no additional square footage proposed. Existing parking and site to remain.

Early Assistance has been requested by MWA Architects for a project at 9747 NE Glisan St:

Project is intended as affordable workforce multi-family residential development. This project includes 3,500 square feet of resident service/community space and 164 apartment units.

Early Assistance has been requested by Winn Architecture for a project at 3336 SW 11th Ave:

Proposal is for a 18 unit, three story with basement apartment building with ground floor commercial space.

A Pre-Application Conference has been scheduled by Ankrom Moisan Architects to the discuss the New Omni at 416 NW 5th Ave:

Current code. Request for a Pre-App for a Type IV and Type III land use review for one contributing structure (416 NW 5th) and non-contributing structure (430 NW 5th Ave) for a proposal of a new 14 story, 150,000 GSF mixed use residential development with parking. Stormwater disposal via landscaped planter.

The PCC Child Development Center at 11900 SW 49th Ave has been submitted for building permit review by GBD Architects:

Addition of new 2-story building for classroom and office space; mixed occupancy B and E; new covered walkway to connect 2 existing buildings with new; TI in ground floor of existing buildings change of occupancy from B to E, replace exterior windows and new walls to reconfigure classrooms; and all associated site work

A fourth building at the Sunshine Portland development, located at 3610 SE 29th Ave, has been submitted for building permit review by Siteworks Design Build:

New 15 unit four story apartment building. ( building 4 of complex) with associated site work

525 SE MLK Blvd has been submitted for building permit review by Hacker Architects:

New construction of six story (above ground) building consisting of 90,400 SF with one level of underground parking consisting of 15,490 SF; five levels of office over ground floor retail

A building permit was issued to Hacker Architects for the Theory 33 Flats at 3325 SE Division St:

Construct new 4 story, 30 unit apartment building, trash area at main floor of building, includes associated site work

A building permit was issued to Carleton Hart Architecture for New Meadows at 4353 N Hunt St (previously 8710 N Dana Ave):

New 15 unit 2 story housing facility for youth transitioning out of foster care

A building permit was issued to Deca, Inc for a project at 1728 NE 45th Ave:

New 3 story w/ basement, 12 unit apartment building , includes associated sitework – prelim mtg 16-289387 BD ***separate mechanical permit required***

A building permit was issued for a project at 85 N Going St (previously 25 N Going St):

New 3 story 6 plex and associated site work; approx 75 sq ft trash enclosure

The first building permit was issued for the Convention Center Hotel at 375 NE Holladay St:

Excavation and shoring, underground utilities, stuctural foundations, vertical structure only, vertical fire protection standpipe at stairs

Metro Reports: Stark St Apartments, Tru by Hilton, Derby NW, and more

Ankrom Moisan’s Stark Street Apartments at 12613 SE Stark St will include 153 units of affordable housing

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Design Advice has been requested by FFA Architecture and Interiors for alterations to the 10th & Yamhill Smart Park Garage:

Alterations to smart park garage that include replacing existing stairways/elevators, new signage and awnings, reconstructed enterances and row encroachments. Green roofs are under consideration for new areas.

Design Advice has been requested by MCA Architects for a project at NW 13th & Savier:

Design Advice Request for 5-story self storage facility with ground floor retail

Early Assistance has been requested by LRS Architects for a project at 5734 E Burnside St:

4-story apartment building with ground floor retail and at grade parking. 3 stories of studio and 1-2 bedroom units.

Early Assistance has been requested by EPR Design for a project at 3244 SE 120th Ave:

New 16 unit building with pervious pavement and drywells for storm water runoff, 9 parking spaces in a garage and 7 spaces on private street. Seeking to meet Community Design Standards.

Early Assistance has been requested by DMS Architects for a project at 718 NE Dekum St:

Keep existing home on property and develop a new 3 story 6 unit apartment building with ground floor retail might want to divide the property located in the Woodlawn Conservation District

A Pre-Permit Zoning Check has been requested by Ankrom Moisan Architects for the Stark Street Apartments at 12613 SE Stark St:

Proposal for 153 units of affordable housing supported by home funds issued by PHB. The project is made up of two four story buildings with on-site parking to residents.

The Tru by Hilton at 7101 NE 82nd Ave has been submitted for Type III Conditional Use Review by JRA Architecture & Planning:

Proposal is to construct 98 guest room four story wood frame on-site parking suites hotel with pre-prepared breakfast (ho restaurant) on existing red lion hotel site. Remove existing 68 room red lion hotel annex in proposed construction area.

Interior alterations to the Meier & Frank Building have been submitted for permit review by Bora Architects:

Interior alteration -demolition of interior partitions, finishes, and associated materials. Demolish dedicated MEP systems serving current Macy’s tenant space. All work will be coordinated to ensure cotinuous operation of hotel floors above

A project at 5515 NE 17th Ave has been submitted for building permit review by CIDA Architects:

Construct new 3 story, 15 unit, apartment building with attached trash enclosure and associated site work

The Derby NW apartments at 1015 NW 16th Ave have been submitted for building permit review by Koz Development:

Construct 6-story mixed use 128 unit apartment building, on ground floor retail tenant space, bike storage, garbage room, electrical room and residential units and associated site work

A project at 1724 NE 45th Ave has been submitted for building permit review by Deca Architecture:

New 3 story w/ basement, 12 unit apartment building , includes associated sitework – prelim mtg 16-289387 bd –

A project at 9109 NE Cascades Parkway has been submitted for building permit review:

New three story office building with onsite parking, 204 S.F. Detached trash enclosure, includes associated sitework *** w/ MT permit and trash enclosure permit (17-117593-CO) ***

A building permit was issued to Koz Development for the 2165 SW Yamhill St apartments:

Construct new 4 story 30 unit apartment building; bike storage on lower floor mezannine level; associated site work