Metro Reports: Westwind Apartments, Las Adelitas, Holden of Pearl, and more

Central City Concern’s redevelopment of the Westwind Apartments in Old Town / Chinatown will result in 100 new units of deeply affordable housing.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers November 4th to November 10th, 2019.

Early Assistance has been requested by Salazar Architect for Las Adelitas at 6723 N Killingsworth St:

141-unit affordable housing building. Ground floor uses include offices, community room, head start classroom, event space courtyard, and plaza. Drywells are proposed for on-site stormwater disposal.

Early Assistance has been requested by Ankrom Moisan Architects for Large Division at 11518 SE Division St:

Large Division will consist of 138 units of affordable housing, serving households at 30% and 60% Area Median Income (“AMI”). Seven (7) units will be set aside for Permanent Supportive Housing (“PSH”) intended to serve homeless households, or at risk of homelessness. The project will consist of studios, one-, two-, and three-bedroom units ranging in size from 416 sf to 1,028 sf.

Early Assistance has been requested by Reilly Signature Homes for a project at SW 18th & Mill St Terrace:

Development of new 4 story condo building with 10 condos, with parking on main level

A Pre-Application Conference has been scheduled by Works Progress Architecture to discuss the redevelopment of the Westwind Apartments at 327 NW 6th Ave:

Construction of a new, 7 story, mixed-use building on a quarter block site. Project includes 70 transient housing units (SROs) with PHB funding, 30 studio apartments and Central City Concern offices and community spaces.

A Pre-Permit Zoning Plan Check has been requested for a project at 6814 N Greenwich Ave:

Two new 3 story multi-family buildings using Community Design Standards. Buildings include basements and L03 mezzanine. Building occupancy is R-2. No off street parking. Stormwater method utilizes on-site drywell.

Conway Block 291E, at the southwest corner of NW Raleigh & 20th, has been submitted for a Type III Design Review by SERA Architects:

Block 219 East will be 6 story market rate apartment building with 200 residential units and basement parking in the Con-Way Master Plan area in the Northwest Plan District.

A project at 3106 SW 12th Ave has been submitted for building permit review by Stewart Gordon Straus Architect:

New 4-story 34 unit apartment building with associated site work; onsite parking ***mechanical permit to be separate***

A building permit is under review for Kilpatrick II at 1408 N Kilpatrick St:

New construction of 18 housing units in a 3-story building on East portion of site. This is buildng 2 of 2. Building 1 was under 18-280322-CO. Utility and grading for entire site was under 18-280322-UTL-01-CO

A building permit is under review for the Holden of Pearl:

review w/ 19-212350-MT New 16 story tower with 3 story podium, courtyard, and 1 below grade level for parking. Building will be a senior living community with 110 units of R-2 occupancy independent senior living, 131 parking stalls in below-grade parking with total GSF of 296,500 with 42,000 of that amount being below-grade parking. Active uses will be provided along 13th Avenue (per 33.510.225).

An excavation and shoring permit was issued to Ankrom Moisan Architects for the Grand Avenue Mixed Use at 465 NE Davis St:

EXC 01 – Excavation and shoring permit

A building permit was issued for a project at 20 NE 60th Ave:

Construct new 4 story 14 unit apartment building with parking on main fl and associated site work

Metro Reports: Unicorn Bed Apartments, Kōz on Killingsworth, Garfield Veterans Apartments, and more

The Unicorn Bed Apartments, as shown to the Historic Landmarks Commission in September. The project will include two 3-story buildings, with thirteen units and an on-site day care center.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers October 21st to October 27th, 2019.

Early Assistance has been requested for a project at 7530 N Interstate Ave:

New Construction, Community Design Standards. 140 R-1 and R-2 Multi-family use. 3-story above grade with third floor mezzanine and basement. 18 dwelling units and 13 sleeping units. No off-street vehicular parking. Project to utilize private drywell.

A project at 5632 N Montana Ave has been submitted for a Type II Design Review by Works Progress Architecture:

The proposed development is for 5-story building occupying a quarter city block at N Montana Ave and N Jessup St. The site is currently occupied by (2) lots, with (2) residential structures. The proposed building use includes at-grade lobby, bike storage, and 11 residential units, two of which are at-grade. The main entrance will be located at N Montana Ave., with private residential entrances off the perimeter garden (gate accessed on N Montana). The main entrance is covered with canopy protection. Drywells and a minimum 5′-0″ landscaping buffer are located along the South and East parameters of the site along with patios for at-grade units.

1634 SW Alder St has been submitted for a Type III Design Review by SERA Architects:

7 story apartment building with 215 units.

The Morningstar at Laurelhurst has been submitted for a Type III Design Review by Ankrom Moisan Architects:

New 5-story group living development which includes 114 units with a mix of 2-bed, 1-bed and studio units. Floors 3-5 will be assisted living and floor 2 will house memory care residents. The ground floor will capture the active use amenity spaces and there will also be rooftop amenities and below-grade parking for residents and staff. Three modifications are being requested: maximum building length (33.130.222.B), Sandy Boulevard Plan District height limits in transition zones (33.575.100.C), and setback landscaping (33.130.215.B.2).

A project at 2124 NW Flanders St has been submitted for a Type III Historic Resource Review by Emerick Architects:

Proposal is for four stories of market-rate apartments over a walk-out basement level with 19 residential units and typical utilities. Floors 1-4 are proposed to have outdoor balcony space. The roof is anticipated to incorporate an ecoroof and solar panels. The project has no parking. The site is non-contributing in Alphabet Historic District.

The Multnomah County Courthouse Reuse project has been submitted for a Type III Historic Resource Review by GBD Architects:

Renovation and seismic upgrade of the historic Multnomah County Courthouse. Modification to the ground floor windows. Adjustment to vehicular access.

The Unicorn Bed Apartments at 2171 NW Glisan St have been submitted for a Type III Historic Resource Review by DAO Architecture:

Two proposed 3-story affordble multi-family buildings (each with a basement), focused on providing compact apartment residences for single mothers with children. Project includes (13) 2-BR units, including (1) ADA-accessible unit and a 600 sf day care on basement level. Non contributing resource.

An excavation and shoring permit for the Grand Avenue Mixed Use at 465 NE Davis St has been submitted by Ankrom Moisan Architects:

EXC 01 – Excavation and shoring permit

A building permit was issued for Kōz on Sandy at 2180 NE 47th Ave:

New 6 story type III code guide mixed use building with 112 living units above tenant space, bike parking, parking, mechanical rooms, and trash room on first level, includes associated site work *** mechanical permit to be separate ***

A building permit was issued for Kōz on Killingsworth at 151 N Killingsworth St:

New 4 story mixed use apartment building, 88 units with ground floor commercial and associated sitework ***mechanical permit to be separate***

A building permit was issued to SERA Architects for the 1715 SW Salmon Mixed Use:

Review w/ 19-106756-MT New 172,020 sq. ft., 8-story mixed use apartment building. 182 units are proposed with future retail space on the ground floor

A building permit was issued to Ink:Built Architecture for the Garfield Veterans Apartments at 6700 NE Garfield Ave:

New 3-story with basement, 28-unit ***state approved modular apartment building with leasing office, laundry room, and mech/elec room*** detached 119 sq ft trash enclosure and associated site work.

Grand Avenue Mixed Use Approved by Design Commission (images)

The Design Commission has approved the Grand Avenue Mixed Use Apartments, an 8-story development designed by Ankrom Moisan Architecture for developer Fairfield Residential. The 92′-5″ tall project will include 170 residential units over ground floor retail. 52 vehicular parking spaces and 136 long-term bike parking will be provided.

The building will be subject to the city’s inclusionary housing rules, which require the provision of affordable housing or the payment of a fee-in-lieu.

203 NE Grand
Read More

Weekly Roundup: Albina Vision, Lloyd Center Bowlero, Oregon Harbor of Hope, and more

The Albina Vision would include a new waterfront public space, at the concourse level of Veterans Memorial Coliseum. The park would span over N Interstate Avenue and the freight rail line.

The Daily Journal of Commerce wrote about the Albina Vision, an effort by civic leaders to heal the district with intentional development that reverses displacement, with new public spaces, mixed income housing and cultural buildings.

Proposed legislation could eliminate a potential funding source for the Portland Diamond Project, writes the Willamette Week.

A Bowlero-branded bowling alley is proposed for the Lloyd Center, according to the Oregonian.

The Hyatt Regency at the Oregon Convention Center is already attracting attention in Portland — and beyond, according to the Business Tribune.

The Design Commission has approved the Grand Avenue Mixed Use, a 170-unit building in the Central Eastside, writes the Oregonian.

Portland Architecture had a conversation with Holst Architecture principal Dave Otte about the firm’s transition to new leadership.

The Hyatt Place in the Pearl would likely be the city’s tallest building to have no on-site parking, according to Portlanders for Parking Reform.

The Oregonian reports that ground has been broken on the Fourth and Montgomery Building, the downtown classroom, clinic and office building that will house programs of three higher education institutions and Portland’s city government.

The Oregon Harbor of Hope could be open by this summer. Originally planned as private endeavor, the shelter and navigation center will receive $1 million in funding from the Joint Office of Homeless Services, reports the Oregonian.

*This article will be unlocked for the rest of this week. After this week it will only be viewable by DJC subscribers.

Weekly Roundup: Hyatt Place, Grand Avenue Mixed Use, Nature Conservancy, and more

Hyatt Place

The proposed Hyatt Place at NW 12th and Flanders would rise to a height of 250′, with 10 floors of hotel rooms and 12 floors of residential units.

The 23-story Hyatt Place proposed in the Pearl went in front of the Design Commission last week—where it drew strong opposition from neighbors,* according to the Daily Journal of Commerce. At the same hearing the Commission also approved the Grand Avenue Mixed Use apartments.

Tope, the new rooftop taco bar from the folks behind Ava Gene’s, is now open in the Hoxton Hotel, reports Eater Portland.

The Willamette Week reported that Oregon could become the first state in the nation to institute statewide rent control.

Las Vegas high-end chocolate shop Jinju Chocolates is opening a store in The Silica on N Williams, writes Eater Portland.

The Business Tribune wrote about the major renovation underway at the headquarters of the Nature Conservancy at SE 14th & Belmont.

*This article will be unlocked for the rest of this week. After this week it will only be viewable by DJC subscribers.

Grand Avenue Mixed Use Apartments go in front of Design Commission (images)

A proposed development in the Central Eastside has gone in front of the Design Commission for three Design Advice Request (DAR) meetings. The 8-story Grand Avenue Mixed Use Apartments are being designed by Ankrom Moisan Architecture for developer Fairfield Residential. As presented at its most recent DAR, the project would include 170 residential units, over approximately 5,000 sq ft of retail space. 51 vehicular parking spaces would be provided in a garage, located partially below grade. The building will be subject to the city’s inclusionary housing rules, which require the provision of affordable housing or the payment of a fee-in-lieu.

203 NE Grand

Read More

Metro Reports: Adidas Campus Expansion, Tree Farm, 555 SE MLK, and more

Image of one of the three new buildings by Lever Architecture’s proposed at the Adidas Campus, as seen from the corner of N Sumner and Delaware.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers June 18th to June 24th, 2018. 

Design Advice has been requested by Holst Architecture for a project at 2310 N Hunt St:

DESIGN HEARING – Design Advice Request for 42 dwelling units in four building with surface parking and associated site landscape elements. Stormwater will be managed on site.

Early Assistance has been requested for a project at 2628 SE Belmont St:

Demolish existing building and construct a new 4-story, 44-unit, apartment building with retail on the first floor.

A Pre-Application Conference has been scheduled by BBL Architects to a discuss a project at 725 NE 100th Ave:

Pre-application conference for a proposed elementary school in David Douglas school district.

A Pre-Application Conference has been scheduled by Works Progress Architecture to a discuss a project at 1431 N Church St:

Proposed new mixed use apartment complex approx 90,000 GSF with six levels of apartments above one level of retail and building amenity space.

The Adidas Campus Expansion was submitted for Type II Design Review by Lever Architecture:

Proposal is for three new buildings, site work, right of way work, renovation to existing plaza, new landscaping and relocation of the Adidas Village arrival drive to create a cohesive intersection at N. Greeley Ave.

A project at 203 NE Grand Ave was submitted for Type III Design Review by Ankrom Moisan Architects:

New construction of an eight story mixed use building with one level of underground parking. Approximately 170 apartments on levels 2-8, 5,500 SF of retail on ground floor. Amenities include a lounge, fitness, leasing, bike storage, pet area and wash.

A project at 6123 N Lombard St was submitted for building permit review by FFA Architecture & Interiors:

New 4 story mixed use apartment building with 46 living units and retail space and garage parking

A building permit was issued for a project at 1415 SE Pardee St (formerly 4540 SE Milwaukie Ave):

Construction of new 4 story apartment building (44 units); garage on first floor;

Building permits were issued for a project at 3445 SE Gladstone St:

Bldg A – 1 of 3 new buildings w/ (E) building to remain, all on same lot – 2 story- with basement – 7 unit apartment building w/ onsite parking, includes associated sitework *** w/ detached trash enclosure 17-248414-CO & 17-248408-MT***

Bldg B – 2 of 3 new buildings w/ (E) building to remain, all on same lot – 2 story with basement , 8 unit apartment building *** w/ 17-248411-MT ***

A building permit was issued to Hacker Architects for a project at 555 SE Martin Luther King Jr Blvd:

New construction of six(story (above ground) building consisting of 90,400 SF with one level of underground parking consisting of 15,490 SF; five levels of office over ground floor retail , CLT floor system.

A building permit was issued for Tree Farm at 826 SE 3rd Ave:

New 6-story commercial building; 1st floor future retail tenant, lobby and trash room; floors 2-6 F2 occupancy; and associated site work, no occupancy this permit *** mechanical permit 17-196436 MT***

Metro Reports: Redfox Commons, Dundon-Berchtold Hall, Abernethy Flats, and more

A building permit was issued for the University of Portland Dundon-Berchtold Hall, designed by Robert A.M. Stern Architects and Soderstrom Architects

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers February 5th to February 11th, 2018.

Design Advice has been requested by Ankrom Moisan Architects for a project at 203 NE Grand Ave:

New 15-story mixed use building. Apartments on levels 2-15. Ground floor retail. Amenities include a lounge, fitness, leasing, bike storage and bike lounge, pet area and wash. Ground floor will be retail and active use. Proposed stormwater disposal will connect to public sewer. See PC 17-274410.

Early Assistance has been requested by Works Progress Architecture for a project at 1431 N Church St:

Current code: Construction of two residential buildings catering to motorcycle enthusiasts, one on each of two adjacent lots. Lots may be merged or remain separate. The primary option includes construction of one 19-unit residential building on each lot with accessory retail on R226170 along Interstate Ave and motorcycle garage parking along the north face of R226172. Alternative options include maximizing FAR on lot R226170 (32,000 SF and 40 units) and a 15 bed Group Living facility on R226172.

Early Assistance has been requested by Icon Architecture/Planning for a project at 2839 NW St Helens Rd:

Current code: Remodel and expansion of existing nightclub. Addition of 4 stories to include: performance rooms, a bar, offices, a dressing room, central staircase and an elevator.The parking lot will be partially reconfigured. There will be a new occupied roof deck over the existing building and a roof terrace on the addition. The top of the addition includes a mechanical loft. The existing deck will be covered by fabric awnings. Stormwater will discharge into nearby City storm system.

A project at 5120 N Lombard St has been submitted for building permit review by Studio 3 Architecture:

New 3 story 18 unit apartment building

A project at 432 NE Simpson St has been submitted for building permit review:

Construct new 3 story (12) unit apartment building with associated site work

A building permit was issued for the Redfox Commons at 2638 NW Wilson St

Addition & change of occupancy from S to B; connect two buildings with breezeway. Replace mezzanines in both with new second floors. ***OSSC seismic upgrade***

A selective demolition permit was issued for the PSU Neuberger Hall Renovation:

Partial Demo – removal of numerous partition walls, extensive demolition to mechanical, plumbing, electrical, telecom equipment and systems as indicated. Portions of the structural slab will be removed. Exterior work includes removal of portions of the façade and several trees. Information on Hazardous Materials and Abatement included.

A building permit was issued to BAMA Architecture & Design for a project at 8130 SE 6th Ave (previously 8128 SE 6th Ave):

New 4 story multi family with basement, 29 unit apartment building, includes associated sitework. ***separate mechanical permit required***

A building permit was issued for the Abernethy Flats at 2020 SE 11th Ave:

New 4 story, 34 unit apartment building with (2) tenant spaces on first floor (no occupancy this permit); includes associated sitework *** w/ 17-185728-mt permit ***

A building permit was issued for the University of Portland Dundon-Berchtold Hall at 5000 N Willamette Blvd:

New constuction of a 65,000 SF classroom and office building with basement and two levels above!grade; W/ 17!224831!MT

Metro Reports: 10th & Yamhill Smart Park, 203 NE Grand, Providence Park, and more

10th & Yamhill Smart Park

Building permits are under review for the renovation of the 10th & Yamhill Smart Park Garage

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers November 20th to November 27th, 2017.

Early Assistance has been requested by Carleton Hart Architecture for a project at 320 NW Hoyt St:

Renovation of existing (vacant) 3-story warehouse to be used as a shelter

Early Assistance has been requested by BAMA Architecture & Design for a project at 1537 SE Morrison St:

Future code – Evaluation of options for development of property.

A Pre-Application Conference has been scheduled to discuss a project at 12400 SE Schiller St:

Future code – Two planned multi-dwelling unit buildings with associated utilities, parking, and walkways on two existing legal lots of record.

A Pre-Application Conference has been scheduled by Ankrom Moisan Architects to discuss a project at 203 NE Grand Ave:

Current code: New eight story mixed use project with apartments on levels 2-8. Ground floor retail. Amenities include a lounge, fitness, leasing, bike storage and bike lounge, pet area and pet wash area.

A Pre-Application Conference has been scheduled by GBD Architects to discuss a project at 236 SE Grand Ave:

Current code – Proposal to build seven story B occupancy office building on the 1.2 block between SE Pine and SE Ash on SE Grand Ave. The structure will be approximately 100 feet tall with a gross area of approximately 107,000 square feet.

The renovation of 10th & Yamhill Smartpark Garage has been submitted for building permit review by FFA Architecture & Interiors:

Addition to parking garage. Replace northeast and southwest stair and elevator towers with new (demo’d under permit 17-273719-co). Demolish northwest and southeast stair and elevator towers. Reconfigured first floor layout including partitions for shell tenant spaces and addition to first floor shell tenant spaces at northeast and southwest corners. Repair and maintenance throughout parking levels. Accessibility upgrades. ***mechanical permit separate***

Alteration to parking garage. Selective demolition of the northeast and southwest corner stair and elevator towers, and demolition of interior partitions on the first floor tenant spaces. Related selective demolition of mechanical, electrical and plumbing systems.

A structural permit was issued to Allied Works Architecture for the Providence Park Expansion:

STR 02: All micropiles shown on sheets S200C, 2001A, and 2002A; Shotecrete slabs on the hillside shown on S2001A at the north and south ends. This includes pile cap tie reinforcement that would be located within the shotcrete slabs.