Metro Reports: Hotel Chamberlain, OHSU Elks Children’s Eye Clinic, Koz on Killingsworth, and more

Hotel Chamberlain
The Hotel Chamberlain is a restoration of a building that was originally built as a hotel, and whose ground floor was occupied by Shleifer Furniture’s for 80 years. The new hotel will include 57 guest rooms at the upper floors, as well as a restaurant and cafe at the ground floor.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers January 20th to January 27th, 2019. 

Design Advice has been requested by Leeb Architects for a project at 1500 SW Taylor St:

Proposal for 100 residential apartments on 7 floors. This building would be a sister to the existing project at 930 SW 15th. Ground floor to include the lobby, housing units, commercial spaces, a mechanical and trash area and parking for 30 cars. Total gross square footage is 74,780. Will connect to existing water and storm water pipes on SW Taylor St

Design Advice has been requested by SERA Architects for an addition to the Galleria at 600 SW 10th Ave:

Renovation of the Galleria Building, which is listed on the National Historic Register. Work anticipated includes a new office penthouse and roof terraces.

Design Advice has been requested by Clark/Kjos Architects for a project at 1500 SE 96th Ave:

Develop the site for Adventist Medical Center with a four story medical office building and adjacent surface parking.

Early Assistance has been requested by Fosler Portland Architecture for a project at 2326 N Vancouver Ave:

New 19-Unit Apartment building on vacant 50×100 lot (approx. 12 to 14,000 sq ft gross building area). Stormwanter disposal via on-site infiltration drywell (pending soils report). Recreational common area in dedicated interior spaces; Bike parking room provided

Early Assistance has been requested by WDC Properties for a project at 5275 N Bowdoin St:

Provide affordable housing. 20 units in single building with affordable housing

Early Assistance has been requested by EM Architecture for a project at 11035 NE Sandy Blvd:

New 4,000 sf institutional building with associated landscaping and parking, utilizing existing on-site stormwater swales.

Early Assistance has been requested by Scotia Western States Housing for a project at 1325 SW Gibbs St:

The proposed project is a 30-unit multifamily project across approximately 24,000 sf of living space and 4 stories of living space above one level of parking garage on the R-1 portion of the site. Amenity bonuses will be utilized to obtain the full allowable 30 units. The entire multifamily and parking development will be limited to the existing parking lot area on the R-1 zoned parcel.

A Pre-Application Conference has been scheduled by Emerick Architects to discuss a project at 2124 NW Flanders St:

Proposal is for four stories of market-rate apartments over a walk-out basement level with 19 residential units and typical utilities. Floors 1-4 are proposed to have outdoor balcony space. The roof is anticipated to incorporate a roof deck, partial green roof and solar panels. Site is non-contributing in Alphabet Historic District.

A Pre-Application Conference has been scheduled by GBD Architects to discuss the Riverplace Redevelopment at 0150 SW Montgomery St:

Master plan development of approximately 8 acres.

The Koz on Killingsworth apartments at 105 N Killingsworth St have been submitted for building permit review:

New 4 story mixed use apartment building, 88 unit with ground floor commercial and associated sitework **mechanical work to be deferred**

A project at 408 SE 105th Ave has been submitted for building permit review:

Building 1 of 3 new apartment building. Two stories with two units. See comments regard commercial folder type.

Building 2 of 3 new apartment building. Three stories with six units.

Building 3 of 3 new apartment building. Three stories with five units and community room.

A building permit was issued to Works Progress Architecture for the Hotel Chamberlain at 509 SE Grand Ave:

Change of occupancy from M to A-2 on ground floor. Seismic retrofit. Major remodel to entire building, new storefront, entries, canopies, elevator, egress stairs, roof, stormwater facilities, demising walls.

A building permit was issued to NBBJ for the OHSU Elks Children’s Eye Clinic:

New OHSU Elk’s Children’s Eye Clinic at the OHSU Casey Eye Institute. 62,000 sq ft, 5 stories + mechanical penthouse. Also has a MT permit.

A building permit was issued for a project at 6011 SE 90th Ave (previously 8928 SE Woodstock Blvd):

Construct new 3 story (12) unit apartment building with associated site work

Metro Reports: Pioneer Lavada Jones, Pepsi Redevelopment, Madison High School, and more

Pioneer Lavada Jones

Guerrilla Development’s Pioneer Lavada Jones project will include removing the roof on the existing NE Sandy Blvd building to create a new outdoor courtyard.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers May 28th to June 3rd, 2018. 

Design Advice has been requested by Mithun for the Pepsi Redevelopment at 2505 NE Pacific St:

Planned development for redeveloping the existing Pepsi Bottling Plant on Sandy Boulevard into market-rate and affordable housing, offices, retail/restaurant spaces, publicly-accessible open space, and associated underground parking.

A Pre-Application Conference to discuss the first phase of the project has also been scheduled:

Phase 1 of the Planned Development for redeveloping the existing Pepsi Bottling Plant on Sandy Blvd. Includes the renovation of the existing mid-century Pepsi warehouse, two new apartment buildings, below-grade parking and a new publicly-accessible Plaza.

Design Advice has been requested by Ankrom Moisan Architects for a project at 1515 SW Morrison St:

Proposed design replaces existing structure on the south half of the block with a mixed use, 20-story high-rise apartment tower. Ground floor features retail, lobby and amentiy spaces. Parking provided below grade.

Early Assistance has been requested by CityCraft Development for a project at 5020 NE Martin Luther King Jr Blvd:

New 7-story mixed use building with underground parking. They will need to go through a design review.

Early Assistance has been requested by Tahran Architecture & Planning for a project at 1603 N Willis Blvd:

Proposal for a four story with basement structure to house 49 affordable housing units using community design standards for a contributing site in Kenton Conservation District. Proposed storm drainage is a rain garden.

Early Assistance has been requested by Benner Stange Associates Architects Inc for a project at 1555 N Tomahawk Island Dr:

Proposal for a new single story three tenant building with two restaurant tenants and one hair salon.

Early Assistance has been requested by V3 Studio for a project at 4624 SW Dickinson St:

Proposal to add 58-89 new multi-family units to existing property that has currently 32 existing multi-family units.

Early Assistance has been requested for a project at 2124 NW Flanders St:

Request for early assistance meeting, zoning only for a site in Alphabet Historic District for a development including a new 3-4 story with daylight basement 14-19 units in a multi-dwelling building. The units will be a mix of 1 and 2 bedrooms. There are setback modifications to setbacks on east and west side lot lines and front lot line to exceed RH max building height of 25 feet. No on-site parking; short and long term bike parking to be included. Applicants know they will need a Pre-Application Conference but request this meeting with a planner only now.

A Pre-Application Conference has been scheduled by Doug Circosta Architect to discuss a project at 208 SE 148th Ave:

Proposal is for 160 new affordable rental living units with amenities and 63 parking spaces in RH zone, East Corridor Plan District.

A Pre-Application Conference has been scheduled to discuss the Madison High School Modernization at 2735 NE 82nd Ave:

Modernization project for Madison High School.

A project at 6015 SE 51st Ave has been submitted for building permit review by Studio 3 Architecture.

New construction 3 story 4 unit apartment building

A building permit was issued to Brett Schulz Architect for the Pioneer Lavada Jones building at 2636 NE Sandy Blvd:

Renovate existing 2-story build; shell only, no occupancy; demo interior partition walls and stairs; build new demising walls to create 10 future tenant spaces, new stairs, (5) new mezzanines, new deck, interior trash room and egress courtyard.

A building permit was issued for a project at 8410 SE 17th Ave (previously 8334 SE 17th Ave):

New construction of three story, 12 unit apartment complex with attached covered trash room and associated site work***w/17-281716-mt***

A building permit was issued to Urban Development Group for a project at 2580 SE Ankeny St (previously 2548 SE Ankeny St):

New 5-story, 96 unit apartment building; first floor includes loading/trash room, lobby, bike storage, electrical equipment room, and studios. Studios on remaining floors. W/17-214647-mt