306 SE 8th Ave
A proposal for an apartment building at 306 SE 8th Ave, designed by SERA Architects, was approved by the Design Commission in 2017, but never submitted for building permit review. A new Pre-Application Conference for a proposal on the site has been scheduled by the same architecture firm.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers February 24th, 2020 to March 1st, 2020.

Design Advice has been requested by Hennebery Eddy Architects for a project at 539 NW 10th Ave

Project consisting of a new +/-11-story hotel with partial basement on a quarter-block site. The new structure will replace an existing 1-story commercial building. The hotel will contain 150-160 guest rooms with 85,000-90,000 square feet. Loading access is planned along NW Hoyt Street, with a single interior loading bay. No off-street parking is proposed. Ground floor program includes hotel lobby, restaurant, lounge, kitchen, offices, restrooms, mechanical rooms and bike storage. Floors 2-11 will be primarily guest rooms with limited amenity spaces such as fitness room, board room and a roof terrace with bar. Stormwater treatment and detention will be accomplished by way of a vegetated roof.

Design Advice has been requested by SERA Architects for a project at 2250 NW Flanders St

6-story apartment building with approximately186 units in the Northwest Plan District and Alphabet Historic District. Stormwater disposal method TBD.

Design Advice has been requested by SERA Architects for Conway Block 291 East at the SW corner of NW 20th & Raleigh:

7 story market rate apartment building with 180 residential units and basement parking. Stormwater disposal will occur through drywells in the pedestrian way.

A Pre-Application Conference has been scheduled by SERA Architects to discuss a project at 306 SE 8th Ave

New 7 story market-rate apartment building with 113 units and ground floor retail.

Cathedral Village at 8614 N Crawford Street has been submitted for a Pre-Permit Plan Check by MWA Architects:

4-story apartment building with 110 affordable family apartments. The unit mix will be (11) 3-bedrooms, (45) 2-bedrooms, (37) 1-bedrooms, and (17) studios. There will be resident services on the ground floor and 37 parking spaces. There is a basement level at the NW corner of the building that will house bike parking and storage.

A project at 4039, 4047 and 4051 N Williams Ave has been submitted for Type II Design Review by William Kaven Architecture:

Construction of two new 4-story buildings organized around a shared courtyard.

Two new four-story buildings located on N Williams Ave, mid-block between N Mason St and N Shaver St.

New four-story commercial (office) comprised of three stories of office over ground floor retail, office, lobby and tuck-under parking.

A project at 1137 NW 23rd Ave has been submitted for Type III Design Review by GBD Architects:

New mixed use building with ground level retail, 4 levels of apartments above, and 1 level of below grade parking. 74 units.

The new building adjacent to the Troy Laundry at 1010 SE Ash St has been submitted for a Type III Historic Resource Review by Hartshorne Plunkard Architecture:

New 6-story multi-family residential project with two below-grade parking levels.

A project at 236 SE Grand Ave has been submitted for Type III Historic Resource Review by TVA Architects:

New 8-story, 130,000 sq ft office building. One adjustment requested to the loading stall.

The Benson Polytechnic High School Modernization has been submitted for Type III Historic Resource Review by Architectural Resources Group:

Modernization of the existing Benson Polytechnic High School (BPHS) building.

A project at 11 NE 55th Ave has been submitted for building permit review by Fosler Portland Architecture:

Construct new 3 story 16 unit apartment building with associated site work

A project at 5905 N Interstate Ave has been submitted for building permit review by Studio 3 Architecture:

New 3 story, 19 units apartment building with partial retail on ground floor and associated siteworks. Trash enclosure inside.

A project at 8157 N Lombard St has been submitted for building permit review by Mackenzie:

Construction of a 3-story, 8,375 sf multi-family building with eleven (11) units. Ten (10) of these units will be 550 sf and one (1) will be 813 sf.

A project at 6307 N Montana Ave has been submitted for building permit review by Fosler Portland Architecture:

Construct new 3 story 19 unit apartment building with associated site work

A project at 503 SE 29th Ave has been submitted for building permit review:

New 4 story 30 unit apartment building

A project at 6962 N Maryland Ave has been submitted for building permit review:

New 4-story 12-unit apartment with associated site work; w/20-124476-MT

A project at 2148 NE Martin Luther King Jr Blvd has been submitted for building permit review by Ankrom Moisan Architects:

New two-story, 27,595 square foot brick office building with an adjacent surface parking area for ten vehicles

Metro Reports: PAE Living Building, Lloyd East Anchor, Dekum Apartments East and West, and more

Lloyd Center owner Cypress Equities is now proposing a revised concept for the east end theater addition to the mall. Instead of incorporating the Sears building into the new cinema, as originally proposed, a taller cinema will be built to the south of the Sears anchor building. The Sears building will be retained and renovated into an office building.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers February 18th to February 24th, 2019. 

Early Assistance has been requested by Allusa Architecture for a project at 1535 NE 41st Ave:

16 unit apartment building in the Hollywood Pedestrian District, CM3d zone. Lobby with mail area on the first floor with interior long term bike parking in the back of the structure.

Early Assistance has been requested to discuss alterations to the previously approved project at 1339 NW 19th Ave:

Add 19 units to the project resulting in a total of 126 units. Exterior design modifications to the building’s exterior. See LU 17-111569 DZM

A Pre-Application Conference has been scheduled to discuss a revised concept for the Lloyd East Anchor:

The redevelopment of the East end of the Lloyd Center will be composed of two major projects. 1. Renovate and expansion of the existing 145,000 sf anchor building (former Sears). 2. Construction of a 70,000 sf theater building containing 13 theaters.

A project at 2148 NE Martin Luther King Jr Blvd has been submitted for a Type II Historic Resource Review by Ankrom Moisan Architects:

29,000SF 2-story brick office building to be the headquarters for Harder Mechanical Contrators. Building is on the Southeast corner of MLK and Thompson. Private surface parking to the east/behind the building with enterance off of Thompson. Site is non-contributing to the Eliot Conservation District.

The PAE Living Building has been submitted for a Type III Historic Resource Review by ZGF Architects:

The project consist of a 54,000 gsf, 5-story core and shell office building in the historical district, at SW 1st Ave and SW Pine St. The building house PAE’s Portland office and other tenants. It includes retail spaces ata the ground floor.

A project at 6306 N Maryland Ave has been submitted for building permit review:

Build 3 story 18 units apartment building. Mechanical separate.

A building permit was issued to Architecture Building Culture for the Dekum Apartments East at 577 NE Dekum St (previously 533 NE Dekum St):

New 4 story, 22 unit apartment building, includes associated sitework

A building permit was issued to Architecture Building Culture for the project at Dekum Apartments West at 505 NE Dekum St (previously 6800 NE Grand Ave):

New 4 story, 22 unit apartment building, includes associated sitework

A building permit was issued to EPR Design for a project at 1270 N Wygant St (previously 4735 N Minnesota Ave):

New 3-story 9 unit apartment building with trash room and bike room;with associated site work.

Metro Reports: Nomad, 1921 SE 3rd, 1710 NE Multnomah, and more

Nomad 1431 N Church St

The Nomad development, as presented to the Design Commission at a Design Request Advice meeting on September 20th. The 130-unit development is being designed by Works Progress Architecture.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers September 10th to September 16th, 2018. 

Early Assistance has been requested by Scott Edwards Architecture to for a garage at 1988 SE 3rd Ave, intended to serve the office development at 1921 SE 3rd Ave: 

Proposed 4-story parking garage with approximately 120 parking spaces that will serve the proposed industrial office building across the street at 1921 SE 3rd Ave. This parking structure will be open with natural ventilation of most likely concrete construction. A new driveway is proposed near the northwest corner of the lot onto SE 3rd Ave for access. There should be enough landscape area remaining to take care of stormwater plus any additional drywells under the parking are if required. See EA 17-165761 for information on the office building development.

Early Assistance has been requested by Concord Hospitality Enterprises for a project at 1710 NE Multnomah St:

Demo aging existing 180+ room extended stay hotel and replace with approximately three hotel brands equaling 450 rooms.

Early Assistance has been requested by Ankrom Moisan Architects for a project at 2148 NE Martin Luther King Jr Blvd:

Construction of a new 3-story office building (approximately 30,000 SF). Two retail locations within the building along MLK on north and south corners. Public parking proposed on R101769. Private parking below level 2. All parking is surface parking. Proposed disposal of stormwater to be infiltration on site.

Early Assistance has been requested by Edge Development to discuss a project at 5665 NE Glisan St:

Demolish two existing single story garages and construct three, 3-story multi-family residential (30 units total).

Early Assistance has been requested by Fosler Portland Architecture for a project at 9501 N Ivanhoe St:

This is a zoning inquiry prior to proposing a project. Option 1 is to renovate the existing non-confirming use (grocery store to remain) plus a new 2nd floor ddition for one apartment. Option 2 is to replace the building with a new building to contain ground floor commercial and 2nd floor residential. No development is being proposed at this time.

A project at 5321 NE 13th Ave has been submitted for Type II Conditional Use Review:

Demolish existing structure and construct a new 5-unit multi-family building. Property was originally part of a Conditional Use Review (07-108596).

Nomad at 1431 N Church St has been submitted for Type II Design Review by Works Progress Architecture:

Proposed development is for a seven story building occupying a half city block at N Interstate Ave btwn N Church and N Maryland Ave. The site currently has four structures that will be removed. The proposed building use includes at-grade surface parking, with retail lobby, residential amenities and a residential unit at grade. The next floors with consist of six levels of residential units above.There will be a large shared kitchen,gathering room and covered outdoor space on the 6th floor. Parking and loading access to the site will be from N Maryland Ave along the east edge.

A building permit was issued for a project at 1213 N Alberta St:

Construct new (3) story 14 unit apartment building with bike storage and trash area on level 1; associated site work