Metro Reports: Toyoko Inn, Wild Ginger Apartments, 7438 N Oswego, and more

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers June 3rd to June 9th, 2019.

Design Advice has been requested for the Toyoko Inn at SW 3rd & Oak:

Development of Toyoko Inn economy hotel with approximately 600 rooms.

Early Assistance has been requested by Benner Stange Associates Architects for a project at 7438 N Oswego Ave:

New 18-unit, 2-story apartment building (to meet community design standards). Two drywells for storm water. They will be using amenity bonuses per 33.120.265.

A project at 1408 N Kilpatrick St has been submitted for a Pre-Permit Zoning Plan Check by R & B Design Studio:

Building 2 of 2, to be built on east 8,343 SF portion of site. Three story, 18 affordable housing units. Associated with entire site utility/grading permit 18-280322-UTL-01-CO and to be reviewed concurrently with Building 2 MT permit. For stormwater disposal methods, please see stormwater management plan attached.

A building permit was issued to Doug Circosta Architect for the Wild Ginger Apartments at 220-250 SE 143rd Ave:

New 60 unit 100% affordable housing apartment complex in 5 buildings. Building 100 12 new apartment units, short term bicycle parking and covered porch, includ

New 60 unit 100% affordable housing apartment complex in 5 buildings. Building 200 12 new apartment units

New 60 unit 100% affordable housing apartment complex in 5 buildings. Building 300 18 new apartment units and short term bicycle parking

New 60 unit 100% affordable housing apartment complex in 5 buildings. Building 400 12 new apartment units

New 60 unit 100% affordable housing apartment complex in 5 buildings. Building 500 6 new apartment units, trash enclosure and laundry, and long-term bike parking.

A building permit was issued for a project at 475 NE 74th Ave:

Construct new 3 story (12) unit apartment building with associated site work

Metro Reports: Modern Times Brewing, 3000 SE Powell, 4708 NE Sandy, and more

A project by Koz Development at 4708 NE Sandy Blvd has been submitted for building permit review. The development is located on a site currently home to a single story bank building. The new building will incorporate new space for Umpqua Bank, including a drive through facility.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers October 22nd to October 28th, 2018. 

Early Assistance has been requested for a project at 2781 NW Sussex Ave:

Develop property with a 6-plex.

Early Assistance has been requested by Alamo Manhattan for a project on South Waterfront Blocks 41, 42, 44 and 45:

Project including four separate mid-rise structures with a mixed-use program comprised of multi-family housing (approximately 1,026 units total), commercial and parking uses. Parking for approximately 625 cars will be provided overall. The project will also include greenway improvements and infrastructure.

A Pre-Application Conference has been scheduled by ZGF Architects to discuss a project at 1202 NW Irving St:

Approximately 10-story/170,000 gsf hotel including a ground floor lobby, one floor of below grade parking and a rooftop amenity

A Pre-Application Conference has been scheduled by Holst Architecture to discuss a project at 830 SE 102nd Ave:

Construction of up to 80,000 SF rehabilitation center to include residential and outpatient chemical dependency treatment facilities for adults and youth

A Pre-Application Conference has been scheduled by Holst Architecture to discuss a project at 3000 SE Powell Blvd:

This is a Portland Housing Bond project. New affordable housing structure(s) of approximately 120-200 units.

A project at 2514 NE Flanders St has been submitted for building permit review:

New (3) story, (6) unit apartment building, located mid block, includes associated sitework

A project at 4708 NE Sandy Blvd has been submitted for building permit review:

New 6 story mixed use building with 112 living units above tenant space, bike parking, parking, mechanical rooms, and trash room on first level, includes associated site work *** mechanical permit to be separate ***

A project at 212 SE 143rd Ave has been submitted for building permit review by Doug Circosta Architect:

New 60 unit apartment complex in 5 buildings. Building 100 apartment units, short term bicycle parking and covered porch

New 60 unit apartment complex in 5 buildings. Building 200 12 new apartment units

New 60 unit apartment complex in 5 buildings. Building 300 18 new apartment units and short term bicycle parking

New 60 unit apartment complex in 5 buildings. Building 400 12 new apartment units

New 60 unit apartment complex in 5 buildings. Building 500 6 new apartment units, trash enclosure and laundry

A building permit was issued to Woodblock Architecture for Modern Times Brewing at 600 SE Belmont St:

TI and addition for new tenant and partial change of occupancy from F to A, S, and B; new mezzanine over trash and office, new walk in cooler, bar, canning, tasting room on main floor; new rooftop patio, (2) egress stairs, (2) bathrooms and elevator ***ossc seismic upgrade***

Building permits were issued for three buildings at 6400 SW Canyon Ct:

Building 1 – 76 units, 4 stories of living over 2 stories of below grade parking and site utilities

Building 3 – 59 units, 3 stories over 1 story of structured parking

Building 4 – 60 units, 3 stories of living over 1 floor of structural parking

A building permit was issued for a project at 2108 NE Everett St and 2155 NE Davis St:

New construction of 3 story 6unit bldg with detached 102sf trash enclosure bldg A fronts NE Everett st, work to include site utilites and improvements

New construction of 3 story 6unit bldg with detached 102sf trash enclosure bldg B fronts NE Davis working to include site utilites and improvements

 

Metro Reports: Towne Storage, 177 SE 146th, 1206 SW 19th, and more

Towne Storage / Blake McFall Company Building

A building permit has been issued for the renovation of the Towne Storage / Blake McFall Company Building

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Design Advice has been requested by BKL/A Architecture for a project at 2104 NE 13th Ave:

New 3 story apartment complex – approximately 11 units.

Early Assistance has been requested by Urban Development Group for a project at 1637 SE Nehalem St:

Proposal is for a new apartment building with 61 units and 17 parking spaces.

Early Assistance has been requested for a project at 7925 N Jersey St:

Proposal is for maximum density six unit condo project with amenity bonus option to get the six units.

Early Assistance has been requested by Urban Development Group for a project at 1335 SE Hawthorne Blvd: 

Proposal is for a new apartment building 39 units & 7 parking spaces.

Early Assistance has been requested by Doug Circosta Architect for a project at 14708 NE Glisan St:

New 46 unit apartment complex.

Early Assistance has been requested by Doug Circosta Architect for a project at 222 SE 143rd Ave:

Development of a new 56 unit apartment complex –

A Pre-Application Conference has been scheduled by GBD Architects to discuss a project at 1715 NW Couch St:

New residential development project with approx. 200 units in six stories with one level of below grade parking accommodating approx 103 stalls commercial and residential.

A Pre-Application Conference has been scheduled by C2K Architecture to discuss a project at 1206 SW 19th Ave:

Construction of a new 15 story mixed use apartment building. 268 apt units with some ground floor commercial. Below grade parking approximately 150 spaces.

A Pre-Application Conference has been scheduled by Magellan Architects to discuss a project at 14601 SE Division St:

Proposal is for a new self-storage building that is multilevel and approximately 85,000 sf.

A Pre-Application Conference has been scheduled by TVA Architects to discuss a project at 1650 NW Naito Parkway:

New 17 story mixed use apartment building, 292 living units, first floor retail and parking, underground parking approximately 189 spaces. . Property to be divided prior to development.

A Pre-Application Conference has been scheduled to discuss a project at 2014 SE 11th Ave:

New 4 story 34 unit apartment building with 2000 SF of ground floor retail.

A project at 7180 N Leavitt Ave (previously 8432 N Syracuse St) has been submitted for building permit review by Studio 3 Architecture:

Construction of new 3 story multifamily apartment structure, surface parking, detached trash enclosure less than 120 sf, includes associated site work

An excavation and shoring permit has been submitted for the Modera Davis at 205 NW 10th Ave:

partial – excavation, shoring, concreate structure and structural embeds from two levels below grade to L13 (roof) also includes all utility connections and routing of utilities below the P2 slab (basement). and all plumbing installation to L13. includes grease interceptor

A building permit was issued to LRS Architects for the renovation of the Towne Storage Building at 17 SE 3rd Ave:

Renovation of existing historic Town Storage building with a new roof top 6th floor addition

Building permits were issued to Doug Circosta Architect for a project at 177 SE 146th Ave (previously 201 SE 146th Ave):

Construct new 3 story (24 unit) apartment building with associated site work; new play area, sports field area, and parking lot building 1 of 6, building 100

Construct new 2 story (2 unit) apartment building with common area on main floor and laundry roombuilding 2 of 6, building 200

Construct new 3 story (11 unit) apartment building with trash room on main floor3 of 6 building, building 300

Construct new 3 story (24 unit) apartment building; 4 of 6 building, building 400

Construct new 3 story (12 unit) apartment building 5 of 6 building, building 500

Construct new 3 story (19 unit) apartment building with storage area on main floor6 of 6 building, building 600

A building permit was issued to Hacker architects for 9101 Foster:

4 story mixed use development with ground floor retail and 3 floors of apartments