Metro Reports: 5 MLK, 120 SE Clay, SW Park and Columbia, and more

5 MLK, as presented to the Design Commission at its third Design Advice hearing

Early Assistance has been requested by Polyphon Architecture & Design for a project at 3441 SE Gladstone St:

Demo East Apartment building and develop 2, 7 unit apartments and 6 townhomes . 10 parking spaces provided.

Early Assistance has been requested for a project at 6025 SE Powell Blvd:

Proposal is for new construction of a three story self storage building that will have 900 units, parking, utilities and landscaping.

A Pre-Application Conference has been scheduled by SERA Architects to discuss a project at 2620 SW 1st Ave:

New 6-story market-rate apartment building with 120 units, ground floor retail, and basement parking.

A Pre-Application Conference has been scheduled by TVA Architects to discuss a project at 1327 NW 19th Ave:

Proposal is for a new 6-story, multi-family residential development with studio and one-bedroom apartments (82 units total) w/ground floor retail. Possible adjustment needed for loading standards.

A project at 33 N Fargo St has been submitted for Type II Design Review:

New 5-story apartment building, with ground floor retail and underground parking

A project at 25 NE 122nd Ave has been submitted for Type II Design Review by Ankrom Moisan Architects:

Proposal is for a mixed use project including a commercial clinic and 176 residential apartments. The apartments will consist of a mix of transitional housing studios and single room occupancy units and will provide housing opportunities for medically fragile clients. Parking will be below grade for approx. 75 spaces. Ground floor and level two to contain the clinic program.

A project at 1638 W Burnside St has been submitted for Type III Design Review by Ankrom Moisan Architects:

Proposal is for a new 8-story, mixed-use building with 134-units of residential apartments and commecial development. (See PC 16-231735 and DA 16-258120.)

A project at SW Park and Columbia has been submitted for Type III Design Review by GBD Architects:

Proposal is for a 7 story apartment building.

5 MLK has been submitted for Type III Design Review by Gerding Edlen Development:

Mixed use building with 15,000 sf of ground floor retail; 112,000 sf of office space on floors 2-6; 220 apartment units on floors 7-17; 160 below-grade parking stalls, and associated amenity and support areas.

A project at NW 15th and Overton has been submitted for Type III Design Review by Vallaster Corl Architects:

New 7-story mixed use building. 55,000 square feet of floor area, 68 residential uits and 28 structured parking spaces are proposed. The entrance to the parking is on NW 15th. There are three office spaces on the ground floor facing NW Overton. There is a Lot Confirmation completed to reestablish the line between lots 6 & 7 and lots 2 & 3 to create the 10,000 square foot site (16-186955PR). 5 modifications.

A project at 5505 SE 17th Ave has been submitted for building permit review:

New 3-story, 6 unit apartment building on lot with existing apartment building to include site utilities and landscaping, detached retaining wall

A project at 602 NE Prescott St has been submitted for building permit review by SERA Architects:

New construction of one story 1465 sf building for rehearsal studio at east elevation; and 4 foot retaining wall

A project at 240 NE Columbia Blvd has been submitted for building permit review:

Construct new Carl’s Jr. building with detached trash enclosure under separte permit (16-286322-co).

A building permit was issued to Myhre Group Architects for a project at 2405 N Vancouver Ave:

New multi family 5 level, 54 unit apartment building over a below grade parking garage

A building permit was issued for a project at 2309 SE 11th Ave (formerly 2311 SE 11th Ave):

New 6 unit apartment complex with eco roof and attached trash enclosure

A building permit was issued for a project at 686 SE Spokane St (formerly 634 SE Spokane St):

Construct new 3 story (12) unit apartment building with site work

A building permit was issued for a project at 120 SE Clay St:

Construct new 3 story office building with basement level parking, rooftop deck and green roof, associated site work included

Metro Reports: Multnomah County Health Dept HQ, 5 SE MLK, Grant Park Village Phase II and more

Multnomah County Health Department Headquarters

The Multnomah County Health Department Headquarters, as presented to the Design Commission in April

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Design Advice has been requested by Gerding Edlen for a project at 5 SE Martin Luther King Jr Blvd:

New mixed-use building containing ground floor retail, office and apartments with height of 200 ft and FAR of approx 370,000 sq ft.

Early Assistance has been requested by em architecture for a project at 1934 NE 45th Ave:

New 25-unit, 5-story, full sprinklered, wood-framed apartment building with flow-through planter at east side of property. No parking included. Will use Community Design Standards.

Early Assistance has been requested for a project at 4949 SW Macadam Ave:

New development – 5 story 117 unit apartment building with 59 parking spaces. Looking to meet Community Design Standards

Early Assistance has been requested for a project at 240 NE Columbia Blvd:

Proposal is for re-development of an existing restuarant building and construction of a new drive-thru Carl’s Jr restaurant.

Early Assistance has been requested by Stewart Gordon Straus Architect for a project at 3225 SW Barbur Blvd:

30 unit 2 Buildings, Apartments (Demo Existing Structure); using density bonuses. On-site Stormwater, on site Stormwater. Questions regarding existing overlapping easements.

Early Assistance has been requested by Main Street Development for a project at 304 NE 99th Ave:

6-story, 58 residential unit building. Ground floor parking is proposed. A 7.5 foot pedestrian path is proposed along the north property line.

Early Assistance has been requested by Waechter Architecture for a project at 4806 N Maryland Ave:

Proposal is for a new development of a five level 8 unit residential structure. Four units and common uses on ground level. Four full floor flats above. No on-site parking. Applicant is planning on following community design standards.

Early Assistance has been requested by TVA Architects for a project at 5009 N Interstate Ave:

Proposed project is a 5-story apartment building with 88+ residential apartments. Ground level surface parking will be provided, as well as secure bike room. Will go through design review instead of meeting community design standards.

The Multnomah County Health Department Headquarters has been submitted for Design Review by ZGF Architects:

9-story headquarters building for the Multnomah County Health Department. The building will house public health clinics & administrative offices, and some retail space. See DA 16-116592

Koz Development have submitted 216X SW Yamhill St for building permit review:

Construct new 3 story with basment 30 unit apartment building; bike storage on basement mezannine level; associated site work

A project at 434 NE Stafford St has been submitted for building permit review by Mentrum Architecture:

Construct new, 3 story, 10 unit apartment building, no parking, with trash enclosure less than 120 sf in area, includes associated site work

Grant Park Village Phase II has been submitted for building permit review:

5 story new wood frame construction over one level of sub-grade parking

The first building permits are under review for the Multnomah County Central Courthouse:

DSN 01 – 50% DD’s for new court house