Metro Reports: Redfox Commons, Dundon-Berchtold Hall, Abernethy Flats, and more

A building permit was issued for the University of Portland Dundon-Berchtold Hall, designed by Robert A.M. Stern Architects and Soderstrom Architects

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers February 5th to February 11th, 2018.

Design Advice has been requested by Ankrom Moisan Architects for a project at 203 NE Grand Ave:

New 15-story mixed use building. Apartments on levels 2-15. Ground floor retail. Amenities include a lounge, fitness, leasing, bike storage and bike lounge, pet area and wash. Ground floor will be retail and active use. Proposed stormwater disposal will connect to public sewer. See PC 17-274410.

Early Assistance has been requested by Works Progress Architecture for a project at 1431 N Church St:

Current code: Construction of two residential buildings catering to motorcycle enthusiasts, one on each of two adjacent lots. Lots may be merged or remain separate. The primary option includes construction of one 19-unit residential building on each lot with accessory retail on R226170 along Interstate Ave and motorcycle garage parking along the north face of R226172. Alternative options include maximizing FAR on lot R226170 (32,000 SF and 40 units) and a 15 bed Group Living facility on R226172.

Early Assistance has been requested by Icon Architecture/Planning for a project at 2839 NW St Helens Rd:

Current code: Remodel and expansion of existing nightclub. Addition of 4 stories to include: performance rooms, a bar, offices, a dressing room, central staircase and an elevator.The parking lot will be partially reconfigured. There will be a new occupied roof deck over the existing building and a roof terrace on the addition. The top of the addition includes a mechanical loft. The existing deck will be covered by fabric awnings. Stormwater will discharge into nearby City storm system.

A project at 5120 N Lombard St has been submitted for building permit review by Studio 3 Architecture:

New 3 story 18 unit apartment building

A project at 432 NE Simpson St has been submitted for building permit review:

Construct new 3 story (12) unit apartment building with associated site work

A building permit was issued for the Redfox Commons at 2638 NW Wilson St

Addition & change of occupancy from S to B; connect two buildings with breezeway. Replace mezzanines in both with new second floors. ***OSSC seismic upgrade***

A selective demolition permit was issued for the PSU Neuberger Hall Renovation:

Partial Demo – removal of numerous partition walls, extensive demolition to mechanical, plumbing, electrical, telecom equipment and systems as indicated. Portions of the structural slab will be removed. Exterior work includes removal of portions of the façade and several trees. Information on Hazardous Materials and Abatement included.

A building permit was issued to BAMA Architecture & Design for a project at 8130 SE 6th Ave (previously 8128 SE 6th Ave):

New 4 story multi family with basement, 29 unit apartment building, includes associated sitework. ***separate mechanical permit required***

A building permit was issued for the Abernethy Flats at 2020 SE 11th Ave:

New 4 story, 34 unit apartment building with (2) tenant spaces on first floor (no occupancy this permit); includes associated sitework *** w/ 17-185728-mt permit ***

A building permit was issued for the University of Portland Dundon-Berchtold Hall at 5000 N Willamette Blvd:

New constuction of a 65,000 SF classroom and office building with basement and two levels above!grade; W/ 17!224831!MT

Metro Reports: Clay + Tiffany Apartments, Tree Farm, Modish Building, and more

Tree Farm at SE 3rd & Morrison is being developed by Guerrilla Development

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Early Assistance has been requested by Sinan Gumusoglu Architecture for a project at 5340 SE Milwaukie Ave:

Current code: Build a new 19 unit 5 story residential building with 17 surface parking stalls. L shaped building will replace existing 8 unit apartment building. Drywell, located in parking lot, will be used to treat storm water. Community design standards will be used.

Early Assistance has been requested by Sinan Gumusoglu Architecture for a project at  432 NE Simpson St:

New 12 unit 3 story apartment building, 6 one bedroom and 6 2 bedroom units. No parking provided. Looking to meet Community Design Standards.

A project at 1604 E Burnside St has been submitted for Type II Adjustment Review by Woodblock Architecture:

Construction of a new five story, 90 room hostel withh ground floor restaurant, coffee and bar, and public rooftop patio. Adjustment 1. 33.130.210 Max Height, Adjustment 2. 33.266.310 Loading space, Adjustment 3. 33.130.215 setbacks

The Clay + Tiffany Apartments at 1110 SW Clay St have been submitted for Type III Design Review by SERA Architects:

New mixed use building for student housing. Commercial space is proposed on the ground floor. The sixteen story building would have 260 units. There would
be a mix of studios, and one and two bedroom units. No on-site parking is proposed. A loading space is proposed with access from SW Clay. One modification requested to bike rack requirement (33.266.220.C3).

The renovation of the Modish Building at 333 SW Park Ave has been submitted for permit review by Beebe Skidmore Architects

Shell and core only seismic upgrade; storefront redevelopment; addition of new 5th floor and roof deck; new roof; accessibility improvements

A four-building development at 1944 SE Tacoma St has been submitted for building permit review by Works Progress Architecture:

New three-story, three unit mult-family structure (1 of 4, with 17-194721,-24,-27 CO)

New three-story, three unit mult-family structure (2 of 4, with 17-194710,-24,-27 CO)

New three-story, three unit mult-family structure with trash enclosure. (3 of 4, with 17-194710,-721,-727 CO)

New three-story, three unit mult-family structure (4 of 4, with 17-194710,-721,-724 CO)

Hoodworks at 5615 SW Hood Ave has been submitted for building permit review:

New 4 story office building with below ground parking, includes associated sitework *** w/ 17-193220-mt ***

Tree Farm at SE 3rd & Morrison has been submitted for building permit review:

New 6-story commercial building; 1st floor future retail tenant, lobby and trash room; floors 2-6 f2 occupancy; and associated site work *** mechanical permit 17-196436mt ***

A project at 2922 SE 82nd Ave has been submitted for building permit review by Mackenzie:

Construct new 3-story self storage building; 1st floor. 3 separate future tenant spaces and storage; 2nd & 3rd floor storage only; and associated site work *** mechanical permit 17-196247mt ***

The first building permit for the Grant High School Modernization project was issued to Mahlum Architects:

Abate and demo 1959 library, lower level cafeteria addition, below grade fan room. Abate and selective demo original 1923 admin building, 1925 north wing, 1927 south wing, 1927 auditorium, and 1952 west addition to north wing. Shoring and tiebacks with associated waterproofing at west facade of 1923 admin bldg. Associated civil work (excaation of courtyards), construction staging pad, fill at 1956 gym, erosion control and tree removal

Building permits were issued to Green Hammer for Tillamook Row:

Construct new 3 story (5) unit apartment building; associated sitework and detached trash enclosure under 120sq ft

Construct 2 story (3) unit apartment building with attached bike storage area

Construct 3 Story (5) Unit Apartment Building

Construct 3 story (3) unit apartment building

A building permit was issued to SERA Architects for the Modera Davis:

Partial – excavation, shoring, concrete structure and structural embeds from two levels below grade to L13 (roof) also includes all utility connections and routing of utilities below the P2 slab (basement). and all plumbing installation to L13. includes grease interceptor