Weekly Roundup: Post Office Redevelopment, 419 SW Washington, NE 106th & Halsey and more

Broadway Corridor USPS

Conceptual image of the Post Office Redevelopment, from the 2015 Broadway Corridor Framework Plan

A 30-story tower by ZGF Architects is planned at 419 SW Washington St, according to The Oregonian. The existing building on the site was recently being used as a temporary homeless shelter, and is now vacant.

The first public hearing of the proposed draft of the Central City 2035 Plan was dominated by concerns about building heights in West End and Goose Hollow, according to an article in the DJC*. Meanwhile, Portland Shoupistas argued that proposed changes related to parking in the plan represent a step backwards.

The Oregonian wrote that up to 1,200 more apartments are proposed on the Prometheus Property in South Waterfront.

Kimberly Branam has been picked as the next executive director of the Portland Development Commission, according to The Oregonian. For the past five years Branam has been second-in-command to former executive director Patrick Quinton.

The Portland Business Journal wrote about the 54 organizations that are backing the proposed $258M affordable housing bond.

OPB’s “State of Wonder” discussed Yard, the recently completed Burnside Bridgehead tower that has sharply divided the opinions of Portlanders.

The Oregonian discovered the premium that will be paid by the PDC for a piece of land near the airport, necessary to allow the Post Office Redevelopment to move forward.

After 92 years, the Lotus Cardroom & Cafe will close later this month, according to KATU. The bar will be demolished to make way for the 3rd & Salmon hotel tower.

An affordable housing development at NE 106th & Halsey by Gerding Edlen and Human Solutions has nearby residents worried, according to the Mid-County Memo.

The timeframe for the City and ZRZ Realty to agree on the price of a piece of land at the Zidell Yards has been missed, according to The Oregonian.  Under a development agreement signed last year, the City has the option to buy the property at an agreed price, for the purpose of building affordable housing.

The Willamette Week wrote about 5 MLKthe Burnside Bridgehead high-rise that will replace the 95 year old Fishels Furniture building.

Work has begun on the Union at St Johns, according to the Portland Business Journal. The mixed use building will include 100 apartments as well as 20,000 sq ft of ground-floor retail space.

*This article will be unlocked for the rest of this week. After this week it will only be viewable by DJC subscribers.

5 MLK receives Design Advice (images)

A 17 story tower at the Burnside Bridgehead has gone before the Design Commission to receive Design Advice. The design of 5 MLK is by Chicago based GREC Architects, for Portland based developer Gerding Edlen. The 200′ tall building is arranged as a five story podium, which would contain approximately 100,000 sq ft of office space, 10,000 sq ft of retail space, 160 vehicular parking spaces and a 4,760 sq ft “bike lounge”. Sitting above the podium is a twelve story “T” shaped tower, which would contain approximately 220 residential units. A shared lobby, serving both the residential and office uses, would be located at the corner of E Burnside and SE MLK. A cascading series of landscaped terraces would be located on top of the podium, with landscape design by PLACE.

5 MLK

Read More

Metro Reports: Multnomah County Health Dept HQ, 5 SE MLK, Grant Park Village Phase II and more

Multnomah County Health Department Headquarters

The Multnomah County Health Department Headquarters, as presented to the Design Commission in April

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Design Advice has been requested by Gerding Edlen for a project at 5 SE Martin Luther King Jr Blvd:

New mixed-use building containing ground floor retail, office and apartments with height of 200 ft and FAR of approx 370,000 sq ft.

Early Assistance has been requested by em architecture for a project at 1934 NE 45th Ave:

New 25-unit, 5-story, full sprinklered, wood-framed apartment building with flow-through planter at east side of property. No parking included. Will use Community Design Standards.

Early Assistance has been requested for a project at 4949 SW Macadam Ave:

New development – 5 story 117 unit apartment building with 59 parking spaces. Looking to meet Community Design Standards

Early Assistance has been requested for a project at 240 NE Columbia Blvd:

Proposal is for re-development of an existing restuarant building and construction of a new drive-thru Carl’s Jr restaurant.

Early Assistance has been requested by Stewart Gordon Straus Architect for a project at 3225 SW Barbur Blvd:

30 unit 2 Buildings, Apartments (Demo Existing Structure); using density bonuses. On-site Stormwater, on site Stormwater. Questions regarding existing overlapping easements.

Early Assistance has been requested by Main Street Development for a project at 304 NE 99th Ave:

6-story, 58 residential unit building. Ground floor parking is proposed. A 7.5 foot pedestrian path is proposed along the north property line.

Early Assistance has been requested by Waechter Architecture for a project at 4806 N Maryland Ave:

Proposal is for a new development of a five level 8 unit residential structure. Four units and common uses on ground level. Four full floor flats above. No on-site parking. Applicant is planning on following community design standards.

Early Assistance has been requested by TVA Architects for a project at 5009 N Interstate Ave:

Proposed project is a 5-story apartment building with 88+ residential apartments. Ground level surface parking will be provided, as well as secure bike room. Will go through design review instead of meeting community design standards.

The Multnomah County Health Department Headquarters has been submitted for Design Review by ZGF Architects:

9-story headquarters building for the Multnomah County Health Department. The building will house public health clinics & administrative offices, and some retail space. See DA 16-116592

Koz Development have submitted 216X SW Yamhill St for building permit review:

Construct new 3 story with basment 30 unit apartment building; bike storage on basement mezannine level; associated site work

A project at 434 NE Stafford St has been submitted for building permit review by Mentrum Architecture:

Construct new, 3 story, 10 unit apartment building, no parking, with trash enclosure less than 120 sf in area, includes associated site work

Grant Park Village Phase II has been submitted for building permit review:

5 story new wood frame construction over one level of sub-grade parking

The first building permits are under review for the Multnomah County Central Courthouse:

DSN 01 – 50% DD’s for new court house

 

Weekly Roundup: the NV, Zidell Yards, Goat Blocks and more

The NV

The NV apartments in the North Pearl by ZGF Architects

The Business Tribune wrote about The NVone of the growing number of residential towers in the North Pearl.

Eater PDX reported that pizzeria Please Louise will be going into the ground floor of the LL Hawkins building in Slabtown.

Urban Land Magazine analyzed how the mix of uses at the Goat Blocks made the development possible.

The Oregonian broke the news that up to 67 windows will be added to the nearly complete Yard tower at the east end of the Burnside Bridge. The cost of the revisions will mostly be covered by the City of Portland, through fee refunds.

ZRZ Realty has hired Thomas Henneberry, “a longtime real estate consultant from the D.C. area” to oversee development of the Zidell Yards, according to the Portland Business Journal. The firm last year received design advice for Zidell Blocks 4 & 6though do not intend to break ground on the buildings until tenants are secured.

BikePortland had a look at the 600 space Lloyd Cycle Station, developed as part of the Hassalo on Eighth project.

The Oregonian reported on developer Gerding Edlen’s plans for a 17 story tower at 5 SE Martin Luther King Jr Blvd. The building would replace the building that has housed Fishels Furniture for decades.

The Business Tribune checked in on the construction progress at the Japanese Garden ExpansionThe new cultural village by Japanese architect Kengo Kuma is expected to be completed in April 2017.

Portland Architecture spoke to Allied Works founder Brad Cloepfil, in advance of a retrospective exhibition about the firm’s work at Portland Art Museum.

The Business Tribune looked at the ongoing restoration of the former Oregonian publishing building at 1320 BroadwayThe renovation is set for completion on June 30th.

New restaurant Q, the successor to Veritable Quandary, will be located in the 2&Taylor building, according to the Portland Business Journal. The former Yamhill Marketplace and Bally’s Total Fitness underwent a major renovation in 2014, and is now home to Jama Software.

The Willamette Week asked whether it is appropriate for the new 2035 Comprehensive Plan to downzone areas of East Portland in the middle of a housing crisis.

Eater PDX reported that Danwei Canting Chinese food pop-up is likely going into the under construction Central Eastside 811 Stark building.

17 story tower planned for Fishels Furniture site (drawings)

Gerding Edlen development have scheduled a Pre-Application Conference to discuss a 17 story tower at 5 SE Martin Luther King Jr Blvd, the current home of Fishels Furniture. Preliminary drawings by GREC Architects of Chicago show an “L” shaped building occupying the entire block. Buildings plans show a main entry to the building at the corner of SE MLK and E Burnside, with retail spaces fronting SE MLK and SE 3rd Ave. Levels 2 to 5 of the building would include approximately 100,000 sq ft of office floor space. Above that the building would include an estimated 220 residential units. Around 180 car spaces, serving both the residential and office uses, would be located in three levels of below grade parking.

5 SE MLK

Read More

Metro Reports: 10 stories in Goose Hollow, 17 stories in Buckman, 16 stories in the Pearl, and more

Carbon12

A foundation permit was issued for Carbon12, which will be the first Cross Laminated Timber building in the USA to reach 8 stories.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Early Assistance has been requested by Urban Development Group for a project at 2548 SE Ankeny St:

New development 77 units with 26 below grade parking spaces

Early Assistance has been requested by Edge Development for a project at 634 SE Spokane St:

New 3 story res building- 12 units. The applicant’s intention is to meet community design standards.

A Pre-Application Conference has been scheduled by Gerding Edlen Development for a project at 5 SE Martin Luther King Jr Blvd:

Pre-Application Conference to discuss a Type III Design Review and possible Type III Central City Parking Review for a new 17-story mixed use building with ground-floor retail and approximately 100,000 square feet of Office floor area and approx. 200,000 square feet of Residential floor area (estimated 220 units). Below-grade parking will be provided, with approx. 180 spaces that will serve both the residential and office uses.

A Pre-Application Conference has been scheduled by SERA Architects to discuss a revised proposal for 505 NW 14th Ave:

280 unit 16 story building with market rate apartments and ground floor retail. Basement parking is included.

A Pre-Application Conference has been scheduled by SERA Architects to discuss a project at 1500 SW Taylor St: 

10-story mixed-use apartments including approximately 150 residential units and two levels of below grade parking.

A project at 2869 NE Sandy Blvd has been submitted for Design Review by Ankrom Moisan Architects:

206 unit, 6-story apartment building with basement parking and partial retail on the first floor.

1430 NW Glisan St has been submitted for Design Review by Ankrom Moisan Architects:

Proposal is for a 16 story high rise residential project.

Two buildings at 5833 SW Macadam Ave have been submitted for building permit review by Jivanjee Circosta Architecture:

New construction of 4 story multifamily building with 31 units with onsite parking, site improvements and site amenities

New construction of 3 story multifamily building with 33 units with onsite parking, site improvements and site amenities

Five buildings at 26 SE 146th Ave have been submitted for building permit review by Doug Circosta Architect:

Construct new 3 story (12) unit apartment building; with associated site work; building 1 of 5

Construct new 3 story (24) unit apartment building; building 2 of 5

Construct new 3 story (7) unit apartment building; building 3 of 5

Construct new 3 story (18) unit apartment building; building 4 of 5

Construct new 2 story (1) unit apartment building with laundry on main floor; building 5 of 5

A building permit is under review for a project at 2611 SW Water Ave:

New construction of 100-unit 5story apartment building, with site improvements, onsite parking and interior trash room

A foundation permit was issued to PATH Architecture for Carbon12:

Partial permit for utilities associated with excavation, shoring, and foundation at basement*****see comments re: review by state of oregon building codes division*****

A building permit was issued to Urban Development Group for a project at 2929 SE Stark St (previously 2913 SE Stark St):

Construct new 3 story (46 unit) apartment building with associated site work