Metro Reports: NE 106th & Halsey, 140 SW Columbia, Moxy Hotel, and more

NE 106th & Halsey will include a mix of affordable and market rate housing, adjacent to the new Gateway Discovery Park. Image taken from the presentation to the Design Commission in February 2018.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers May 7th to May 13th, 2018. 

Early Assistance has been requested by Portland Development Group for a project at 2824 NW Upshur St:

Demolish existing house and build a new 5-unit multi-dwelling building.

Early Assistance has been requested for a project at 1809 NW Davis St:

Redevelopment of the 20,000 sf surface lot across the street and east of the main Trinity Cathedral campus, with the potential of including the 10,000 sf parcel in the SE corner of the same block. The primary purpose is to expand parking capacity for the Trinity Cathedral on Sundays through a shared parking arrangment with a new commerical and/or mixed use development on the site. Both sites have requested a zone change to CM3 through the Map Refinement Project.

Early Assistance has been requested by Ink Built Architecture for a project at 6716 NE Garfield Ave:

Future code: New apartment building. 3 stories with partial basement, 28 units all affordable housing, modular construction. Meeting community design standards. No design district. D-overlay

The redevelopment of Kellogg Middle School at 6909 SE Powell Blvd has been submitted for a Type III Conditional Use Review:

Redevelop the entire Kellogg Middle School site. Demo existing structures and remove the debris. Development of vacant field since the property will then be graded and reseeded in anticipation of the redevelopment of the site in spring 2019. The cleaned site will house a new 105,000 sf school structure, off street parking area and bus loop, recreation field, and a limited service access road. The off-street parking area will contain 34 parking spaces, 2 of which will be handicapped and 2 carpool parking spaces. A free-standing obelisk sign will be located at the corner of SE Powell Blvd and 69th Ave.

A project at NE 106th & Halsey has been submitted for Type III Design Review by Holst Architecture:

Mixed use development fronting SE Halsey and Gateway Discovery Park and includes 40 units of affordable housing and 35 units of market rate housinig. Retail spaces and residential amenity spaces on the ground floor, office space and residential units on the second floor and dwelling units on floors 3-6.

A project at 105 N Killingsworth St has been submitted for Type III Design Review by Kōz Development:

New mixed-use 4-story building with 87 dwelling units, 2400 sq ft of commercial space, associated bike parking and back of house service areas.

A project at 6144 SE Foster Rd has been submitted for building permit review by Merryman Barnes Architects:

Change of occupancy from M and B to R-2 and A-2, S-1 for new tenant to include sleeping beds, commons, kitchen bathrooms, showers, storage; seismic upgrades and exterior site improvements

140 SW Columbia has been submitted for building permit review by GBD Architects:

New 20 story, mixed use residential tower. Tower will span over existing parking entrance. Project will include 348 residential dwelling units, 244 parking spaces and approx 15,000 sf shell commercial space

A project with two buildings at 4242 SE Milwaukie Ave has been submitted for building permit review:

Construct new 3 story (12) unit apartment building with below grade parking and trash area; associated site work

Construct new 1 story building for new community center and fitness center

A project at NE Alberta and 26th has been submitted for building permit review by Steelhead Architecture:

New 3 story, 11 unit apartment building with retail on main floor, includes associated sitework *** w/ 18-168776-MT ***

A project at 2005 N Rosa Parks Way has been submitted for building permit review by William Wilson Architects:

Construct new 4 story (66) unit apartment building with lower level courtyard, bike storage, and utility; associated site work

A project at 1215 N Alberta St has been submitted for building permit review:

Construct new (3) story 14 unit apartment building with bike storage and trash area on level 1; associated site work

The Moxy Hotel at 539 SW 10th Ave been submitted for building permit review:

New 12 story, 197 unit hotel w/ associated sitework (no onsite parking) *** mechanical permit to be separate ***

A building permit was issued to CIDA Architects for a project at 4975 NE 14th Pl:

New 3 story, 15 unit apartment building, includes associated sitework

A structural permit was issued to SERA Architects for the hotel at 619 SW 11th Ave:

STR – New, 15 story hotel – STRUCTURAL AND BELOW GRADE WORK ONLY, Below grade electrical and plumbing work, mat slab foundation system, concrete shear walls and columns and PT concrete decks.

A buiding permit was issued to Skylab Architecture for Block 76 West (previously known as Sideyard) 365 NE Couch St:

New 23,569 sf 5 story mixed use bldg. Primary bldg. Occupancy is mercantile (M) with storage (S) and business (B). Bldg. Will be fully sprinkled and iii-a type of construction. Core and shell construction.

Metro Reports: MLK.Mason West, 2580 NW Upshur, 9298 NE Cascades Parkway, and more

MLK.Mason West

A building permit was issued for the MLK.Mason West Apartments by TVA Architects

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers October 16th to October 22nd, 2017.

Early Assistance has been requested by William Wilson Architects for a project at 6541 N Denver Ave:

Proposed development of a split zoning site, CG and R5. four story apartment building (20 units or more) on the GC portion of the site and 2 new single family homes on the R5 portion of the site. All existing structures on site to be demoed.

Early Assistance has been requested by Urban Development Group for a project at 2580 NW Upshur St:

Current code – New apartment building with 146 units including 22 affordable units.

Early Assistance has been requested by William Kaven Architecture for a project at 2245 SE Powell Blvd:

Current code – Proposed project is 15,329 SF new four story mixed use building.

Early Assistance has been requested by WDC Properties for a project at 506 NE 53rd Ave:

Current code: New 4-story, 18 unit multi-family housing building.

Early Assistance has been requested by Mortenson for a project at 9298 NE Cascades Parkway:

Current Code: Propose a 200-room lifestyle hotel, located on the eastern portion of Parcel G Cascade Station. The hotel will have a straight orientation and primary frontage along NE Cascades Pkwy. To include (approx.) 180 parking spaces, a curbside drop-off on NE Cascades Pkwy, ground-level amenities, and an off-road trail along the southern portion of the property.

Early Assistance has been requested for a project at 7246 N Mohawk Ave:

Current code: New 14 unit apartment building – follow up questions from EA 15-189166 Appt.

A project at 5320 SE Woodstock Blvd has been submitted for building permit review by Studio 3 Architecture:

New 3-story, 19 unit apartment building with associated site work. Multistory dwelling units at floors 2 and 3.

A project at 1805 N Rosa Parks Way has been submitted for building permit review by DEZ Development:

New 3 story 18 unit apartment building

A project at 1522 N Sumner St has been submitted for building permit review by Fosler Portland Architecture:

New construction of 3-story 19 unit apartment building and site improvements

A project at 1520 N Emerson St has been submitted for building permit review by DEZ Development:

New 3 story 19 unit apartment building with enclosed bicycle parking.

A building permit was issued for the MLK.Mason West apartments at 4111 NE Martin Luther King Jr Blvd:

New 6 story apartment building with 112 units and tuck under parking.

A building permit was issued for a project at 255 SE 146th Ave (formerly 223 SE 146th Ave):

Construct 3 story, 18 unit apartment building, includes parking and associated site work, detached trash enclosure is less than 120ft in area