Metro Reports: 10th & Yamhill Smart Park, 203 NE Grand, Providence Park, and more

10th & Yamhill Smart Park

Building permits are under review for the renovation of the 10th & Yamhill Smart Park Garage

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers November 20th to November 27th, 2017.

Early Assistance has been requested by Carleton Hart Architecture for a project at 320 NW Hoyt St:

Renovation of existing (vacant) 3-story warehouse to be used as a shelter

Early Assistance has been requested by BAMA Architecture & Design for a project at 1537 SE Morrison St:

Future code – Evaluation of options for development of property.

A Pre-Application Conference has been scheduled to discuss a project at 12400 SE Schiller St:

Future code – Two planned multi-dwelling unit buildings with associated utilities, parking, and walkways on two existing legal lots of record.

A Pre-Application Conference has been scheduled by Ankrom Moisan Architects to discuss a project at 203 NE Grand Ave:

Current code: New eight story mixed use project with apartments on levels 2-8. Ground floor retail. Amenities include a lounge, fitness, leasing, bike storage and bike lounge, pet area and pet wash area.

A Pre-Application Conference has been scheduled by GBD Architects to discuss a project at 236 SE Grand Ave:

Current code – Proposal to build seven story B occupancy office building on the 1.2 block between SE Pine and SE Ash on SE Grand Ave. The structure will be approximately 100 feet tall with a gross area of approximately 107,000 square feet.

The renovation of 10th & Yamhill Smartpark Garage has been submitted for building permit review by FFA Architecture & Interiors:

Addition to parking garage. Replace northeast and southwest stair and elevator towers with new (demo’d under permit 17-273719-co). Demolish northwest and southeast stair and elevator towers. Reconfigured first floor layout including partitions for shell tenant spaces and addition to first floor shell tenant spaces at northeast and southwest corners. Repair and maintenance throughout parking levels. Accessibility upgrades. ***mechanical permit separate***

Alteration to parking garage. Selective demolition of the northeast and southwest corner stair and elevator towers, and demolition of interior partitions on the first floor tenant spaces. Related selective demolition of mechanical, electrical and plumbing systems.

A structural permit was issued to Allied Works Architecture for the Providence Park Expansion:

STR 02: All micropiles shown on sheets S200C, 2001A, and 2002A; Shotecrete slabs on the hillside shown on S2001A at the north and south ends. This includes pile cap tie reinforcement that would be located within the shotcrete slabs.

10th & Yamhill Smartpark Receives Design Advice (images)

Plans by the Portland Bureau of Transportation and the Portland Development Commission to renovate the 10th & Yamhill Smartpark Garage have received Design Advice. The project is being designed by FFA Architecture and Interiors. The project is intended to address ADA and seismic decencies in the existing structure, as well as improve the ground level retail experience.

10th & Yamhill Smartpark

Read More

Metro Reports: Stark St Apartments, Tru by Hilton, Derby NW, and more

Ankrom Moisan’s Stark Street Apartments at 12613 SE Stark St will include 153 units of affordable housing

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Design Advice has been requested by FFA Architecture and Interiors for alterations to the 10th & Yamhill Smart Park Garage:

Alterations to smart park garage that include replacing existing stairways/elevators, new signage and awnings, reconstructed enterances and row encroachments. Green roofs are under consideration for new areas.

Design Advice has been requested by MCA Architects for a project at NW 13th & Savier:

Design Advice Request for 5-story self storage facility with ground floor retail

Early Assistance has been requested by LRS Architects for a project at 5734 E Burnside St:

4-story apartment building with ground floor retail and at grade parking. 3 stories of studio and 1-2 bedroom units.

Early Assistance has been requested by EPR Design for a project at 3244 SE 120th Ave:

New 16 unit building with pervious pavement and drywells for storm water runoff, 9 parking spaces in a garage and 7 spaces on private street. Seeking to meet Community Design Standards.

Early Assistance has been requested by DMS Architects for a project at 718 NE Dekum St:

Keep existing home on property and develop a new 3 story 6 unit apartment building with ground floor retail might want to divide the property located in the Woodlawn Conservation District

A Pre-Permit Zoning Check has been requested by Ankrom Moisan Architects for the Stark Street Apartments at 12613 SE Stark St:

Proposal for 153 units of affordable housing supported by home funds issued by PHB. The project is made up of two four story buildings with on-site parking to residents.

The Tru by Hilton at 7101 NE 82nd Ave has been submitted for Type III Conditional Use Review by JRA Architecture & Planning:

Proposal is to construct 98 guest room four story wood frame on-site parking suites hotel with pre-prepared breakfast (ho restaurant) on existing red lion hotel site. Remove existing 68 room red lion hotel annex in proposed construction area.

Interior alterations to the Meier & Frank Building have been submitted for permit review by Bora Architects:

Interior alteration -demolition of interior partitions, finishes, and associated materials. Demolish dedicated MEP systems serving current Macy’s tenant space. All work will be coordinated to ensure cotinuous operation of hotel floors above

A project at 5515 NE 17th Ave has been submitted for building permit review by CIDA Architects:

Construct new 3 story, 15 unit, apartment building with attached trash enclosure and associated site work

The Derby NW apartments at 1015 NW 16th Ave have been submitted for building permit review by Koz Development:

Construct 6-story mixed use 128 unit apartment building, on ground floor retail tenant space, bike storage, garbage room, electrical room and residential units and associated site work

A project at 1724 NE 45th Ave has been submitted for building permit review by Deca Architecture:

New 3 story w/ basement, 12 unit apartment building , includes associated sitework – prelim mtg 16-289387 bd –

A project at 9109 NE Cascades Parkway has been submitted for building permit review:

New three story office building with onsite parking, 204 S.F. Detached trash enclosure, includes associated sitework *** w/ MT permit and trash enclosure permit (17-117593-CO) ***

A building permit was issued to Koz Development for the 2165 SW Yamhill St apartments:

Construct new 4 story 30 unit apartment building; bike storage on lower floor mezannine level; associated site work

Metro Reports: 4W Tower, Press Blocks, 10th & Yamhill Garage, and more

Context drawing for the proposed 4W tower by ZGF Architects

Context drawing for the proposed 4W tower by ZGF Architects

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Design Advice has been requested by William Kaven Architecture for a project on Old Town Chinatown Block 33 at 125 NW 4th Ave:

Discuss a full block mixed use development Full Block mixed use development with 5 levels of residential over 4 levels office over ground floor retail/market and lobby with 2 levels of below grade parking.

Early Assistance has been requested by Waechter Architecture for a project at 1610 SE Tolman St:

Construction of a new Commercial Mixed Use building to share a site with existing Dairy Queen drive through restaurant.

Early Assistance has been requested for a project at 3249 SE Division St:

Proposal is for a five story building consisting of four floors of residential units a top ground floor retail and vehicle parking. 19 parking spaces and one loading bay are proposed.

Early Assistance has been requested by Brett Schulz Architect for a project at 4303 N Albina Ave:

Proposal is to build a community of eight micro houses on two 5,000 sf sites. Existing dwelling to remain.

Early Assistance has been requested for a project at 2231 NW Pettygrove St:

Proposal is to build micro unit apartments with kitchens in each apartment and do a density transfer of 4:1 FAR.

Early Assistance has been requested by GBD Architects for the PCC Child Development Center at 11900 SW 49th Ave:

Development of Child Development Center – includes alterations to an existing building on the campus (south classroom building) as well as the construction of a new free-standing building.

A Pre-Application Conference has been scheduled by FFA Architecture & Interiors to discuss the 10th & Yamhill Smart Park Renovation:

Pre-application conference to discuss the alterations proposed to the Smart Park Garage that include replace existing stairways/elevators, new signage and awnings, reconstruct the entrances and ROW encroachments. Green roofs are under construction for new areas.

A project at 1340 SE 9th Ave has been submitted for a Type III Conditional Use Review by Scott Edwards Architecture:

Existing 1 and 2 story factory use building on 2 blocks to be re-used and upgraded for creative office, factory, and small retail.

A project at 408 SE 105th Ave has been submitted for Type II Design Review:

Proposal is for a 13-unit apartment buidling.

The 4W tower at 419 SW Washington St has been submitted for Type III Design Review by Greystar Real Estate Partners:

New building – with 400 market-rate residential rental units with below grade parking.

The Press Blocks at 817 SW 17th Ave have been submitted for Type III Design Review by GBD Architects:

Proposal is to develop one full and one-half block for residential tower and office plus retail. 447 below grade parking space and 577 bike parking spaces.

The SW 3rd & Ash mixed use building has been submitted for Type III Design Review by GBD Architects:

New 6-story mixed-use building with approx. 8640 sq. ft of ground-level retail, 133 market-rate residential units and 63 below-grade parking spaces. proposed.

A project at 7707 SE Alder St has been submitted for building permit review:

Construction of new 6 plex building, 3 story, includes site utilities, detached trash enclosure is less than 120 sf

A project at 7667 N Westanna Ave has been submitted for building permit review:

Construct new 3 story 4 plex with tuck under garages, 2 units on lowest level, 2 units on main level that include upper level, no detached trash enclosure shown on plans, includes associated site work

A project with two buildings at 1329 N Skidmore St has been submitted for building permit review:

New 3 story apartment building with 12 units

New 3 story apartment building with 12 units

A project at 6035 NE Flanders St has been submitted for building permit review:

Construct 3 story, 4 plex building with 2 tuck under garages, 2 units on lowest level, 2 main floor units with upper levels above, no detached trash area, includes associated site work

A project at 2027 SE Harold St has been submitted for building permit review:

Construct new 3 story (4) unit apartment building with associated site work

A building permit was issued for the Tesla Showroom at 4330 SW Macadam Ave:

Remove interior partition walls, new walls to create showroom, offices, storage. New exterior ada ramp, new exterior door on south elevation.

A building permit was issued for a project at 4405 SE Belmont St (previously 4335 SE Belmont St):

New 4 story, 63 unit apartment building with onsite parking, site utilities and landscaping

A building permit was issued to Encore Architects for a project at 1411 NW Quimby St (previously 1400 NW Raleigh):

New 6-story apartment building, 135 units, 11 live/work units, ground level retail and parking.

Metro Reports: 21 Astor, 710 E Burnside, SW Park & Columbia, and more

21 Astor, designed by FFA Architecture for Robert Ball Companies

21 Astor, designed by FFA Architecture for Robert Ball Companies

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

A Pre-Application Conference has been scheduled and Design Advice requested by GBD Architects for a project at SW Park and Columbia:

8-story multi family 100-110 unit residential project with 33% affordable housing.

A demolition permit was issued for the existing structure at 710 E Burnside St:

Demolish/deconstruct existing restaurant building, cap sewer, remove all debris *** non-residential comprehensive plan designation. Not subject to 35-day demolition delay. ***

A project at 5454 NE 14th Pl has been submitted for building permit review:

New 4-story apartment building to include 15 dwelling units. Main floor to include parking garage and bike parking and associated site work.

A project at 9525 N Lombard St has been submitted for building permit review:

Construct new 2 story (7 unit) apartment building with associated site work

A building permit was issued to FFA Architecture + Interiors for a 21 Astor at 921 NW 21st Ave:

New 4 story mixed use building, (2) ground floor retail spaces and (31) parking spaces, 27 apartment units on floors 2-4.

A building permit was issued for a project at 1526 N Holman St:

Construct new 3 story (6) unit apartment building; with associated site work; detached trash enlosure less than 120 sq ft

Weekly Roundup: Overlook Pointe fire, 10th & Yamhill Smart Park, Field Office, and more

10th & Yamhill Smart Park

Conceptual image of a renovated 10th & Yamhill Smart Park garage (image by FFA Architecture & Interiors)

The Portland Development Commission received three offers for Centennial Mills, according to The Oregonian. All three offers, valued at $1,000, $100,000 and $3.45 million, were rejected. The redevelopment agency will now consider “how/whether to reengage the market”.

The DJC reported that the under construction Overlook Pointe condominium development at 5425 N Minnesota Ave was burned down in a fire* early Wednesday morning.

The PDC voted to sell property at 1053–1201 NW Naito Parkway to The Wolff Company for $9 million. The Oregonian reported that the developer plans to build 340 apartments on the site, 68 of which would be affordable for at least 10 years.

KGW covered the 1,200 apartments coming to the area in and around the Con-way Masterplan area in NW Portland. Construction is underway on Blocks 294E and 295E and the Leland James Buildingwhich are following on from the LL Hawkins and Slabtown MarketplaceImmediately outside of the masterplan area is Q21, which is nearing completion.

The Portland Tribune wrote about the “new mood in Chinatown“, which after decades of divestment might be seeing a change in its fortunes. The Society Hotel opened last year, and will soon be joined by the newly renovated Mason Erhman Building Annex, Overland Warehouse Company Building and Grove Hotel.

The Portland Mercury profiled Swift Real Estate Partners, the San Francisco Investment Firm that is “Snatching Up Old Town Real Estate“. The company’s acquisitions include the New Market Theatera historic building adjacent to the Skidmore Fountain that could receive a significant addition.

Project^’s Field Office will create a “300,000-square-foot urban campus“, according to the Portland Business Journal. Construction recently started on the Hacker-designed buildings at NW Front and 17th.

More than 1,000 people applied for the 65 housing units available to people displaced from North and Northeast Portland, according to The Oregonian.

The City is planning a $25 million renovation of the 10th & Yamhill Smart Park, according to the Portland Business Journal. The scope of the project will include addressing seismic and ADA deficiencies in the existing structure.

Three new surf shops are set to open in the next year, reports The Oregonian. These include Cosube, which will open in Slate at the Burnside Bridgehead, and Leeward Northwest Surf & Sea, which will open in New New Crusher Court at 2450 NE Sandy Blvd.

According to the Portland Business Journal, furniture retailer Room & Board will open next year in the Pearl District’s newly renovated Fisk Tire Company Building.

The Business Tribune wrote about a day in the life of the team at OHSU working on the Knight Cancer Research Building.

*This article will be unlocked for the rest of this week. After this week it will only be viewable by DJC subscribers.

Metro Reports: Mason Ehrman Building Annex, St Francis Park Apartments, 97th Ave Gymnasium and more

St Francis Park Apartments

The St Francis Park Apartments by MWA Architects, which will include 106 units of affordable housing.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Brett Schulz Architecture have requested Early Assistance for a project at 10561 SE Division St:

Remove existing one story building and build new two story building adding 150 ft drive thru which will enter on SE 106th ave and exit on to SE division.

Early Assistance has been requested for a project at 1332 N Skidmore St:

Proposed 5-story apartment building with underground parking.

Oh Planning+Design architecture have requested Early Assistance for a project at 10234 NE Prescott St:

Early Assistance – Planner only – to discuss the construction of a three story building with associated site improvements at MHCC Maywood.  

FFA Architecture + Interiors have requested Early Assistance for a project at 1320 NW 17th Ave:

Proposing a mixed-use building with ground floor retail and 6 multi-family units at the first floor plus 8 floors of multi-family apartments and underground parking.

Deacon Development Group have scheduled a Pre-Application Conference to discuss a project at 4224 NE Halsey St:

100 unit apartment building proposed on the NE corner of the site.

VWR Development have submitted a project at 3910 NE Garfield Ave for Design Review:

4-story multi-family apartment building. Please note there is a concurrent review happening for a Amendment to LU 13-102007 LDS, with an adjustment to minimum lot dimensions and a lot consolidation. That concurrent case is LU 16-132893 AS, LC, AD.

Holst Architecture have submitted the Asian Health and Services Center at 9005 SE Foster Rd for Design Review:

Design review for new 29,000 sq ft 3-story building which will include offices, community gathering spaces, and ground floor office lease space. Modification request to loading standards. Modification request to on-site locations of vehicle areas.

Building permits are under review for projects at the Muslim Community Center, located at 5325 N Vancouver Ave:

New construction of modular building

New construction of pavilion

A building permit is under review for a project at 432 NE Jessup St:

Construct new 3 store (12) unit apartment building with associated site utilities

A building permit was issued to SERA Architects for the renovation of the Mason Ehrman Building Annex at 222 NW 5th Ave:

Core and shell renovation of historic building for future (B) tenants, change of occupancy from (S1) to (B), remodel all 3 stories of annex portion of building; includes seismic upgrade to annex. Includes seismic upgrades to adjacent Kalberer tower per stipulation of temporary certificate of occupancy of permit 00-159263CO; ; site work includes work in ROW and street trees/landscaping

A building permit was issued to MWA Architects for the St Francis Park Apartments at 1177 SE Stark St:

new 4-story, 72,055 sf, Type VA, 106 unit apartment building including improvements in vacated SE Oak St to meet superblock requirements.

Building permits were issued to Mentrum Architecture for a project at 1340 NE Killingsworth St:

New 3 story apartment building with 6 units, 50 sq ft detached trash enclosure, associated site work. North building, 1 of 2, **w/ 14-255316-CO**.

New 3 story apartment building with 6 units. South building, 2 of 2, **w/ 14-255312-CO**

A building permit was issued to LRS Architects for a project at 2330 NW Raleigh St:

New fourstory, 40unit apartment complex with lobby; on site bike parking and interior trash enclosure;including site work

A building permit was issued to Allusa Architecture for the 97th Ave Gymnasium:

Construct new gymnasium, new parking area with accessible stall, repave existing parking area at 4 plex, 98 sq ft trash enclosure

A building permit was issued to Architects Van Lom Group for a project at 13031 SE Foster Rd:

Construction of new 68-unit assisted care facility

 

Metro Reports: 2761 NE Halsey, 6003 SE Milwaukie, Con-way Block 290 and more

Con-way Block 290, as presented to the Design Commission during Design Advice

Con-way Block 290, as presented to the Design Commission during Design Advice

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Urban Development Group have requested Early Assistance for a project at 2761 NE Halsey St :

New 3-story apartment building with 29 one- and two-bedroom units.

Brett Schulz Architect has requested Early Assistance for a project at 5209 SE 18th Ave: 

Proposal to demolish existing SFR’s, consolidate lots, and build new 6-story apt building with ground floor parking

Urban Development Group have requested Early Assistance for a project at 6003 SE Milwaukie Ave:

Proposed 4 story apartment building with underground parking and basement.

SERA Architects have scheduled a Pre-Application Conference to discuss a project at 1732 NW Quimby St:

A 6-story market rate apartment building with approximately 115 units and basement parking.

YBA Architects have submitted Con-way Block 290 for Design Review:

Project is for a six story mixed-use multifamily structure located within the NW master plan. 105 parking spaces will be provided for the residents in a below-grade parking level accessed via ramp at NW Pettygrove.

FFA Architecture have submitted a project at 915 NW 21st Ave for building permit review:

New 4 story mixed use building, (2) ground floor retail spaces and (31) parking spaces, 27 apartment units on floors 2-4.

Metro Reports: Couch9, Chamberlain Hotel, Broadway Tower and more

Couch9 by Vallaster Corl Architects

Couch9 by Vallaster Corl Architects

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

FFA Architecture and Interiors have requested Design Advice for an expansion to the Industrial Home Building:

Design Advice Request for a project which is for a proposed addition to expand the current Industrial Home Building located on the property to accommodate tenant expansion plans. Maintain parking at the ground level and add two connecting floors above. Adding approx 5924 SF in total and considering a green roof system.

Icon Architecture have requested Early Assistance to discuss a project at 6826 N Greenwich Ave:

Proposal is to build a nine unit residential apartment bldg. With below grade parking.

Emerick Architects have requested Early Assistance to discuss the conversion of the Chamberlain Hotel, most recently used by Shleifer Furniture, back into a hotel:

Proposal is for a mixed use on ground floor with hotel rooms on upper floor. Existing building will be restored.

Design Department have submitted a project at 533 NE Killingsworth St for Design Review:

Design review for a repair and refurbish of building facade, new one-story building behind facade. New doors and windows and new patio dining areas.

SRG Partnership have submitted the Knight Cancer Research Building for Design Review:

Knight Cancer Research Building

GBD Architects have submitted the Broadway Tower for Design Review:

Design review for a new 19-story high-rise mixed-use building with a combination hotel, office and retail (ground floor) uses. Parking provided in a below-grade structure. Three modifications requested: loading stall size requirement; bicycle parking stall size; and exceeding glazing minimum for entire site, except for north and south elevations.

A building permit is under review for a project at 5429 N Minnesota Ave:

Construct a six unit three story apartment building with 2 bedroom/1 bath units with living room, dining room, kitchen, and washer/dryer closet.

Stewart Gordon Straus Architect has submitted a project at SW 12th & Woods for building permit review:

Construct a new five unit three story apt building attached to a new three story 4 unit apt building with ground floor garage parking for each. Portions of site greater than 20% slope.-see comment

A building permit is under review for a project at 2825 NE Columbia Blvd:

Construct new 103,912 sq ft, 3 story self storage building with associated utilities, parking and landscaping.

Mackenzie have submitted a project at 6006 NE Holladay St for building permit review:

New 118,162 sf four story self storage building**with 15-280089-MT & demos 15-280098-CO & 15-280101-CO**

Building permits were issued to SERA Architects for the Modera Belmont:

Demolish existing office building, surrounding asphalt and landscaping

Site demolition, excavation, shoring and concrete work up through level 2 floor slab

A building permit was issued for Couch9 by Vallaster Corl Architects:

New 11 story mixed-use housing tower with ground floor retail and 2 levels of below grade parking. Vegetated roof garden at level 2 for stormwater retention and filtration. Rooftop terrace for residents at level 11 (existing structure to be demolished).

 

Fair-Haired Dumbbell gains final approval (images)

The Fair-Haired Dumbbell has gained final approval from the Design Commission, after four Design Review hearings. The project by FFA Architecture and Interiors for Guerrilla Development will include 64,700 sq ft office and retail space. The Burnside Bridgehead building will be entirely covered in a hand painted mural, the design of which has not yet been chosen.

The Dumbbell

Read More