Metro Reports: Prometheus Property, 2548 SE Ankeny, 1331 NW 17th and more

Prometheus Property

Boundary of the Prometheus Property in South Waterfront is shown in green. Image by GBD Architects, from the Block 41 DAR submission in 2015.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Main Street Development have requested Early Assistance for a project at 5603 SE Milwaukie Ave:

Proposal is to build a five story 28 unit apartment complex.

Koble Creative Architecture have requested Early Assistance for a project at 1001 SE Hawthorne Blvd:

Renovations including adding a second story and 8 new double wide shipping container office spaces.

Early Assistance has been requested for a project at 5101 SE 17th Ave:

Approximately 126 market-rate units in 5 stories for a total of 100,000 GSF, 50 under ground parking spaces with 14 above grade for a total of 64. Stormwater will be managed through underground detention and minor drainage swales.

A Pre-Application Conference has been scheduled by GBD Architects for a project at 1331 NW 17th Ave:

3/4-block, mixed-use, multi-family, residential building. See Pre-application EA 16-124425 – note that the site has changed, in that they are adding the two SW corner parcels.

A Pre-Application Conference has been scheduled by Scott Edwards Architecture for a project at 1340 SE 9th Ave:

Existing 1 and 2 story factory use building on 2 blocks to be re-used and upgraded for creative office, factory, and small retail. Undeveloped 1/2 block to the east to have potential 4 story building with parking at ground level.

A Pre-Application Conference has been scheduled by Brett Schulz Architect for a project at 2510 NE Sandy Blvd:

Proposal to demo existing building and develop a new 6 story mixed used building. Ground floor commercial with approximately 88 apartments.

A Pre-Application Conference has been scheduled by GBD Architects for a project on the Prometheus Property in South Waterfront:

Project Description: Pre-Application Conference to discuss Type III Design Review for proposed phased development of 4 new, 7-story mixed-use building with approx. 3500 square feet of Retail in each, 200- 300 market-rate apartments and 150-250 parking spaces per building with street improvements.

A Design Review has been submitted by Houndstooth Development for a project at 3525 NE Martin Luther King Jr Blvd:

Proposal is for new construction of a four story apartment building that will have 24 studio apts and four large loft units. The ground floor will have common areas to support the residents of the building.

A project at 2548 SE Ankeny St has been submitted for building permit review by Urban Development Group:

New 5 story 77 unit apartment building with ground level parking

A project at 1205 SE Morrison St has been submitted for building permit review by Scott Edwards Architecture:

Construct new 4 story (39) unit apartment building with parking and bike storage on main level; associated site work

Metro Reports: Multnomah County Health Dept HQ, 5 SE MLK, Grant Park Village Phase II and more

Multnomah County Health Department Headquarters

The Multnomah County Health Department Headquarters, as presented to the Design Commission in April

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Design Advice has been requested by Gerding Edlen for a project at 5 SE Martin Luther King Jr Blvd:

New mixed-use building containing ground floor retail, office and apartments with height of 200 ft and FAR of approx 370,000 sq ft.

Early Assistance has been requested by em architecture for a project at 1934 NE 45th Ave:

New 25-unit, 5-story, full sprinklered, wood-framed apartment building with flow-through planter at east side of property. No parking included. Will use Community Design Standards.

Early Assistance has been requested for a project at 4949 SW Macadam Ave:

New development – 5 story 117 unit apartment building with 59 parking spaces. Looking to meet Community Design Standards

Early Assistance has been requested for a project at 240 NE Columbia Blvd:

Proposal is for re-development of an existing restuarant building and construction of a new drive-thru Carl’s Jr restaurant.

Early Assistance has been requested by Stewart Gordon Straus Architect for a project at 3225 SW Barbur Blvd:

30 unit 2 Buildings, Apartments (Demo Existing Structure); using density bonuses. On-site Stormwater, on site Stormwater. Questions regarding existing overlapping easements.

Early Assistance has been requested by Main Street Development for a project at 304 NE 99th Ave:

6-story, 58 residential unit building. Ground floor parking is proposed. A 7.5 foot pedestrian path is proposed along the north property line.

Early Assistance has been requested by Waechter Architecture for a project at 4806 N Maryland Ave:

Proposal is for a new development of a five level 8 unit residential structure. Four units and common uses on ground level. Four full floor flats above. No on-site parking. Applicant is planning on following community design standards.

Early Assistance has been requested by TVA Architects for a project at 5009 N Interstate Ave:

Proposed project is a 5-story apartment building with 88+ residential apartments. Ground level surface parking will be provided, as well as secure bike room. Will go through design review instead of meeting community design standards.

The Multnomah County Health Department Headquarters has been submitted for Design Review by ZGF Architects:

9-story headquarters building for the Multnomah County Health Department. The building will house public health clinics & administrative offices, and some retail space. See DA 16-116592

Koz Development have submitted 216X SW Yamhill St for building permit review:

Construct new 3 story with basment 30 unit apartment building; bike storage on basement mezannine level; associated site work

A project at 434 NE Stafford St has been submitted for building permit review by Mentrum Architecture:

Construct new, 3 story, 10 unit apartment building, no parking, with trash enclosure less than 120 sf in area, includes associated site work

Grant Park Village Phase II has been submitted for building permit review:

5 story new wood frame construction over one level of sub-grade parking

The first building permits are under review for the Multnomah County Central Courthouse:

DSN 01 – 50% DD’s for new court house