Metro Reports: Great Notion Brewing, 6112 SE Foster, 1831 NW 28th, and more

Great Notion Brewing

A building permit is under review for Great Notion Brewing’s new taproom in Northwest Portland

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Early Assistance has been requested by AAI Engineering for a project at 7945 NE Alberta St:

Current code. Demolish existing buildings and replace with two new self-storage facilities with associated parking, utilities and landscaping.

Early Assistance has been requested by Case Design Group for a project at 2231 NW Pettygrove St:

Review is for current code. New apartment building. EA to focus on setbacks. Northwest Plan District.

A project at 6112 SE Foster Rd has been submitted for building permit review by Steelhead Architecture:

TI for new brewery; change of occupancy from ‘M’ to ‘A-2’ for restaurant and ‘B’ to ‘F-2’ for brewery; new partition walls for kitchen, restrooms, office, brewery and storage room; new counter for bar, relocate entry. With 108 sf trash enclosure and parking lot improvements. Walk-in cooler under separate permit.

A building permit has been submitted for review by ZGF Architects for Great Notion Brewing at 2450 NW 28th Ave:

Addition of new tap room and patio entrance with ada compliant ramp; remodel on west side of bldg existing entry, new walls to create bathrooms, kitchen and on east side of bldg 1st flr new walls to create secure storage/ compressor room, work/storage area, bathroom and 2nd flr office space, bathroom, and balcony

8 buildings at 1831 NW 28th Ave have been submitted for building permit review by Fieldwork Design & Architecture, each with the same description:

New 4 story 2 unit apartment building with landscaping and site utilities

A project at 6261 N Cecelia St has been submitted for building permit review:

New construction of 4 story, 21 unit apartment building 20,083sf, interior trash room, dfs for fire sprinklers and bolt on balcony with integrated guardrail

A project at 5000 N Willamette Blvd on the University of Portland campus has been submitted for building permit review by Soderstrom Architects:

New constuction of a 65,000 SF classroom and office building with basement and two levels above grade; W/ 17 224831 MT

The rebuild of the Portland Building at 1120 SW 5th Ave has been submitted for building permit review:

FF4/ structural improvements and seismic upgrade.

A building permit was issued to CIDA Architects for a project at 5511 NE 17th Ave (previously 5515 NE 17th Ave):

Construct new 3 story, 15 unit, apartment building with attached trash enclosure and associated site work; fire vault in SE corner of property ***separate mechanical permit required***

A building permit was issued to Urban Development Group for a project at 2595 SE 50th Ave (previously 4926 SE Division St):

New construction of a four story mixed-use building consisting of 127 apartment units and 7000 sf of ground floor commercial space; below grade parking and residential units

A building permit was issued for a project at 110 N Blandena:

New construction of 3story 6plex and site improvements with 106sf detached trash enclusure

A building permit was issued to Iselin Architects for a project at 1278 SE Marion St (previously 8705 SE 13th Ave):

New 4 story 23 unit apartment building with underground parking

 

Weekly Roundup: Eleven West, Housing Bond, Office Development, and more

Eleven West is being designed by ZGF Architects, who also designed the nearby Twelve West tower

The Oregonian wrote about Eleven West, the 24-story tower with swimming pool planned for downtown Portland’s West End.

The Willamette Week wrote about how Mayor Wheeler has “blown past a deadline his own office set for starting to spend a $258 million bond approved by voters last November to build and rehab affordable housing units”.

Portland Architecture took a look at the offices of Stoel Rives and Simple, respectively located in Park Avenue West and Clay Creative.

The Portland Business Journal looked at how the Goat Blocks are bringing “new flair to a transforming neighborhood.”

An analysis by the Business Tribune showed that the real estate market in Portland is moving towards the construction of office space.

Weekly Roundup: Canopy Hotel, Oregon’s Development Spree, Best of Portland, and more

Canopy Hotel

Construction has topped out on the Canopy Hotel, designed by ZGF Architects

The Oregonian took a look at Oregon’s development spree, which include “21 cranes, 15 hotels [and] 10,000 jobs”.

Construction has topped on the Pearl District’s Canopy HotelThe DJC published photos of the progress to date.

Portland Architecture interviewed Brian Cavanaugh of Architecture Building Culture.

The Portland Business Journal looked at how the Goat Blocks are bringing “new flair to a transforming neighborhood.”

Next Portland came in third place for “Best Local Blog” in the annual Willamette Week “Best of Portland” Readers’ Poll. Thank you to everyone who voted for us.

Under Construction: OHSU CHH South and Rood Family Pavilion (images)

This is an updated version of a post originally published on March 4th 2016.

Construction is underway on two new OHSU buildings in their emerging South Waterfront campus, both designed by ZGF Architects. The project will include the Center for Health and Healing (CHH) South, a 15 story, 244′-7″ tall ambulatory hospital and research building on Block 29.  On Block 28 the 11 story Rood Family Pavilion is planned, which will include a parking garage and a total of 76 rooms available to patients receiving outpatient treatment at OHSU.

OHSU Center for Health and Healing South

Read More

Weekly Roundup: Press Blocks, Vista Pearl, Swift Headquarters, and more

Image of the Press Blocks development in Goose Hollow, from the project’s second Design Advice Request hearing in October 2016 (image by Mithun)

According to the Portland Business Journal the sale of the former Oregonian printing facilities in Goose Hollow has closed. Urban Renaissance Group and Security Properties paid $20 million for the site, which is set to be redevelopment as the Press Blocks.

The Business Tribune wrote about the new leadership at Holst Architecture.

After more than 20 years, Mark Edlen has handed over the reins at Gerding Edlen, reports the Portland Business Journal.

The NW Examiner reported that the amount of ground retail at the Vista Pearl (formerly Block 20) will be reduced from what was originally approved.

The Portland Bureau of Transportation is looking for feedback on what type of bike parking should be required at new apartment buildings, reported BikePortland.

The DJC wrote about how local architecture firms make decisions on whether to speak up on political issues.*

The prospect of lower corporate taxes under President Trump is having a chilling effect on one of the main sources of financing for affordable housing developments, wrote the Portland Mercury. Local projects affected include Innovate Housing’s NW 14th & Raleigh development, which now has a $1.8 million funding gap.

The Portland Business Journal took a look at the Swift Headquarters, completed last year in the former Rose City Awnings building in NW.

As part of their Architect’s Questionnaire series, Portland Architecture interviewed Nat Slayton of ZGF Architects.

*This article will be unlocked for the rest of this week. After this week it will only be viewable by DJC subscribers.

Metro Reports: Prometheus Property, 418 SW 2nd, 404 NW 23rd Ave, and more

404 NW 23rd Ave

404 NW 23rd Ave by Works Progress Architecture, as presented to the Historic Landmarks Commission in October of this year

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Early Assistance has been requested for a project at 5640 NE Killingsworth St:

Proposal is to develop site with up to 15 units residential housing.

Early Assistance has been requested by MWA Architects for a project at 2133 N Argyle St:

This project is for a mixed use/mixed income multi-family residential development. Approximately 15,000 sf commercial/retail with 215 apartment units.

A Pre-Application Conference has been scheduled by Works Progress Architecture for a project at 1732 NE 2nd Ave:

New construction of a 6-story, multi-family, 77-unit, mixed-used building with ground floor retail and an outdoor plaza on the south side of the property. Stormwater managed through onsite drywell.

A Pre-Application Conference has been scheduled by GBD Architects for a project at 418 SW 2nd Ave (“Ankeny Blocks” Block 38):

New 20-story mixed-use building with ground floor retail, office space on floors 2-8, and 182 multi-family units on floors 9-20, with 4 floors of below-grade parking.

A project at 5009 N Interstate Ave has been submitted for Type II Design Review by TVA Architects:

Proposal is for new construction of multi-story apartment building. Existing buildings will be demolished.

A project at 8614 N Crawford St has been submitted for Type II Design Review by GBD Architects:

Proposal is to build a five story multi-family residential development of approx. 157 apartments. The ground level includes the entry lobby, parking, utility spaces, walk-up apartments and amenity spaces. The second floor roof terrace will have an eco-roof and raised planter areas along with private terraces at each of the apartments facing the eco-roof.

GBD Architects have submitted two Type III Design Review applications for buildings on the Prometheus Property in South Waterfront:

Two high-rise residential towers, each building consisting of around 7,000sf of retail and 300-550 market rate apartments and below grade parking.

New construction of two seven story mixed-use buildings, each building consisting of approx. 5,000 sf of retail, 200-300 market rate apartments and 150-250 off-street parking stalls in one level of structured underground parking and a partial level of structured at-grade parking.

A project at 6620 N Richmond Ave has been submitted for Type II Design Review by SERA Architects:

Project is a new five story multi-family apartment building with one level of sub-grade parking.

A project at 1440 SW Taylor St has been submitted for Type III Design Review by Leeb Architects:

Request is for approval of a type III design review to allow construction of a development of a seven story mixed use building, consisting of a five-story wood frame building over a two level podium with a concrete structure. 107 dwelling units.

A project at 2222 NW Raleigh St has been submitted for Type III Design Review by SERA Architects:

New mixed-use building with 173 units, ground floor retail and 110 parking spaces. Vehicle ramp is proposed on NW Raleigh, with 2 modifications: bike parking width & vehicle parking width.

A project at 1116 SW Washington St has been submitted for Type III Design Review by ZGF Architects:

Project is new construction of high-rise with underground parking, retail on first two floors, office space of up to six floors and up to 213 residential units.

A project at 404 NW 23rd Ave has been submitted for Type III Design Review by Works Progress Architecture:

New four story residential building with both structured and surface parking. Twenty one units are proposed and a total of 37 parking spaces. A roof deck is proposed.

A project at 2220 NW Pettygrove St has been submitted for building permit review by Studio 3 Architecture:

Construct new 4 story with basement (43) unit apartment building; associated site work

A series of building permits have been submitted by Green Hammer for Tillamook Row at 20 NE Tillamook St:

Construct 2 story (3) unit apartment building with attached bike storage area

Construct 3 story (3) unit apartment building

Construct 3 story (5) unit apartment building

Construct new 3 story (5) unit apartment building; associated sitework and detached trash enclosure under 120sq ft

Construct new 2 story common building with office, restroom, and assembly area on main fl; fitness area on second fl

A project at 310 SE 12th Ave has been submitted for building permit review by William Wilson Architects:

New 4 story 84 unit apartment building with basement garage and bike storage; associated site work

A project at 15847 SE Powell Blvd has been submitted for building permit review by BAMA Architecture and Design:

Construct new 2 story 19 bed care facility; landscaping and associated site improvements;

A building permit was issued to CIDA Architects for a project at 6811 NE Grand Ave:

New 4 story apartment building with 22 units, 104 sq ft detached trash enclosure. Unit in SE corner of 1st floor to be live work unit.

A building permit was issued for the Holladay Park Plaza East at 1350 NE 17th Ave:

New 2 story above grade 10 unit adult living apartments with 2 levels of underground parking

A building permit was issued to CIDA Architects for a project at 410 NE Dekum St (previously 422 NE Dekum St):

Construct new 4 story, 22 unit apartment builidng, one unit is live/work, no parking, trash and bike storage at main level, includes associated site work

Design Commission approves Multnomah County Health Dept HQ (images)

The Design Commission has approved the new Multnomah County Health Department Headquarters, which will house clinical functions, associated workplaces, and administrative offices for the department. The 9-story, 157,000 sq ft building by ZGF Architects will rise to a height of 145’-4 1/2”.  At the ground level the building will include a pharmacy and work space, a “gallery” facing the street, and a potential lease space. Floors 2 to 4 will be occupied by clinic and clinic administration spaces. Floors 5 to 9 will mostly be occupied by office space, with a south facing terrace at the 9th floor. The majority of roof area will be covered by an ecoroof. No vehicular parking is proposed. A bike room, with 55 parking spaces, will be accessed from NW Hoyt Street.

Read More

Multnomah County Health Dept HQ has first Design Review hearing (images)

A first Design Review hearing has been held for the new Multnomah County Health Department Headquarters.  The building will house clinical functions, associated workplaces, and administrative offices for the Health Department. The 9-story, 157,000 sq ft building by ZGF Architects will rise to a height of 145’-4 1/2”.  At the ground level the building will include a pharmacy and work space, a “gallery” facing the street, and a potential lease space. Floors 2 to 4 will be occupied by clinic and clinic administration spaces. Floors 5 to 9 will mostly be occupied by office space, with a south facing terrace at the 9th floor. The majority of roof area will be covered by an ecoroof. No vehicular parking is proposed. A bike room, with 55 parking spaces, will be accessed from NW Hoyt Street.

Multnomah County Health Department Headquarters

Read More

Weekly Roundup: Jantzen Apartments, Zidell Marine, Eastside Health Center, and more

Eastside Health Center

The Eastside Health Center at 122nd and Burnside

After Portland-based ZGF Architects were named the nation’s top firm, Portland Architecture profiled the firm and looked at how it achieved the title.

Walls of the City looked at whether mid rise buildings can be family friendly.

With the Pearl District Post Office now in PDC ownership, Portland Monthly reported on the PSU students who are coming up with ideas for the future of the site.

After more than 50 years of building barges in South Waterfront, Zidell Marine is now building its last barge. The firm will now concentrated on the redevelopment of the Zidell Yards. Last year Design Advice was offered for office building on Zidell Blocks 4 and 6although neither building has moved forward since then.

The Business Tribune reported on the “lightened up” iteration of Modera Daviswhich was recently approved by the Design Commission.

OPB’s ‘State of Wonder’ covered the wood framed Albina Yardthe recently completed North Portland office building that is the first building to use domestically fabricated structural CLT panels.

The Portland Business Journal reported on the 6 Portland health organizations that have pledged $21.5M for low-income housing projects. The money will help fund three projects, in partnership with Central City Concern: the Eastside Health Center at  NE 122nd and Burnside; the Stark Street Apartments at 12647 S.E. Stark St; and the Interstate Apartments at 6905 N. Interstate Ave. The paper also provided renderings of the three projects.

The Business Tribune looked at the Jantzen Apartments, which recently went before the Design Commission for its first hearing.

The DJC published photos of the demolition of a single story building in downtown, which is set to be replaced by the new office building at 1127 SW Morrison St.

Metro Reports: Hoyt20, 419 SW 4th, 51 NE Weidler, and more

606 NE 20th Ave

A builing permit was issued for the Hoyt20 Apartments

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Design Advice has been requested and a Pre-Application Conference scheduled by Works Partnership for a project at 404 NW 23rd Ave:

Proposal is for a new four story development with basement and surface parking. The roof will have a deck and be used for mechanical storage.

Proposal is for a new four story multi-unit development with basement parking and a provision for additional at grade surface parking. The roof will include a deck and mechanical storage.

Design Advice has been requested by ZGF Architects for a project at 419 SW Washington St:

30-story mixed use (housing/hotel) with five stories of underground parking. Existing building has a two stories of below grade parking.

Early Assistance has been requested by William Wilson Architects for a project at 2502 SE 29th Ave:

New four story, 50 unit apartment building with basement garage and ground floor retail.

Early Assistance has been requested by TVA Architects for a project at 5009 N Interstate Ave:

Proposed project is a 5-story apartment building with 70+ residential apartments. Ground level surface parking will be provided, as well as secure bike room. Will go through design review instead of meeting community design standards. Adjustment to drive through aisle will be requested.

Early Assistance has been requested by Mackenzie for a project at 627 SE Division Pl:

Demo existing structures and construct a new 4 story self-storage facility.

Early Assistance has been requested by Hennebery Eddy Architects for a project at 341 SW 10th Ave:

Early Assistance w/meeting to discuss an addition of up to 2 floors on top of the existing building, which houses a “walk-in” theatre. Those floors would include add’l theatres, food service, common space, and potentially offices.

Early Assistance has been requested by Urban Development Group for a project at 1725 SE Tenino St:

Proposal is for a new apartment building with 78 units. Existing structures will be demolished.

A Pre-Application Conference has been scheduled by LRS Architects for a project at 51 NE Weidler St:

Proposal for a mixed use full block development. Ground floor auto dealership facing Broadway and commercial tenant spaces facing Weidler. Below grade parking and behicle service bay for dealership operations. One level of residential parking above the dealership with five floors of residential units. Outdoor terrace and green roof over residential parking structure.

A Pre-Application Conference has been scheduled by Holst Architecture regarding 1510 NE Multnomah St:

New mixed use development of 2, 6 story 1st floor retail/live work apartment buildings. Approximately 520 market rate units with below grade parking.

A project at 1825 NW 23rd Ave has been submitted for Type III Design Review by Works Partnership:

Type III Design Review for a 5-story mixed use building with ground-level retail. Project includes basement parking.

A project at 6805 SE 52nd Ave has been submitted for building permit review by Allusa Architecture:

New 3 story mixed use building with (15) apartments and (2) retail spaces, site improvements, detached trash enclosure and gazebo each less than 120 sq ft.

New 3 story apartment building with (12) units

A project at 9525 N Lombard St has been submitted for building permit review:

Construct new 2 story (7 unit) apartment building with associated site work

A building permit was issued to MCA Architects for The Woodlark hotel at 813 SW Alder St:

Combine Woodlark Building (B occupancy) and Cornelius Hotel (R-2 occupancy) into a single Hotel (R-1 occupancy,) with 150 rooms, restaurant, bar and retail amenity area. (see 15-173142 CO for interior demolition permit)

A building permit was issued for a project at 7711 SW Capitol Highway (previously 7707 SW Capitol Highway):

New four story apartment building, 72 units, approximately 40 parking stalls, 2 retail spaces, ***demo permit for existing structure to be obtained separately***

A building permit was issued for the Hoyt20 Apartments at 620 NE 20th Ave:

New construction of a 6-story 59unit apartment building including parking and retail on level 1. Levels 3-6 contain a mix of apartment including studios, 1 bedroom, and 2 bedrooms. Level 6 also has an amenity deck along the west property line. Retail space on level 1 is to be built out under a separate permit with no occupancy this permit. Demo of existing building to be under separate permit. Demo plans included for reference only.

A building permit was issued for a project at 6400 N Montana Ave (previously 6404 N Montana):

New 6 unit, 3 story apartment with associated site work and landscaping