Metro Reports: 1430 NW Glisan, Asian Health & Services Center, 5 MLK, and more

1430 NW Glisan

The first building permit was issued for 1430 NW Glisan

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Early Assistance has been requested by DLR Group for a project at 539 SW 10th Ave:

Construct a new hotel with approximately 177 rooms, 11 stories. (Central City, Downtown, West End Plan District – Central City Design District)

Early Assistance has been requested by Woodblock Architecture for a project at 1604 E Burnside St:

Demo existing building for development of a new 83 room Hostel with related spaces, a restaurant and coffee shop. No parking provided.

Early Assistance has been requested for a project at 1424 NE 33rd Ave:

Consolidation of 4 lots. Vacation of Halsey Street. Demo existing house. Construction of four 6-plexes (1,000 sq ft 2bed/2bath condos). Garages on 1st floor. No parking proposed. Affordable Housing. Modular construction. 24 total units.

A project at 3185 N Vancouver Ave has been submitted for Type III Conditional Use Review:

New 6-story mixed-use building consisting of 202 group living units, 8 apartment units, shared kitchens on each floor, 56 parking spaces, and 3 commerical tenant spaces on the ground floor.

A project at 177 N Failing St has been submitted for Type II Design Review:

New construction of a 44,700 SF building with 88 group living rooms provided in (16) dwelling units, (2) one bedroom and (2) two bedroom apartments in four floors of type VA construction above one floor of Type IA construction which will contain 6 live-work units, amenity spaces, parking and building utilities and one below grade level containing parking and building utilities.

A project at 1723 NW 24th Ave has been submitted for building permit review by Skylab Architecture:

Change of occupancy from B to M; create six separate tenant spaces and six mezzanines; new interior trash rooms; accessible bathrooms; new exterior doors and parking upgrades; seismic upgrade; new storefront window openings

A project at 7220 N Burlington Ave  has been submitted for building permit review by Studio 3 Architecture:

New 3-story, 19-unit multifamily apartment structure***deferred submittals: pre-engineered wood floor joists, pre-engineered wood roof joists, built in landscape irrigation (design build)***

A project at 6515 SE 78th Ave has been submitted for building permit review by Mentrum Architecture:

New 2-story, 3-unit apartment building with 1 parking pad and associated site work, attached trash enclosure. No mechanical.

An excavation and shoring permit is under review for 5 MLK:

Excavation and Shoring for new 17 story building

A building permit was issued to Bora Architects for alterations to the Meier & Frank Building:

Interior alteration -demolition of interior partitions, finishes, and associated materials. Demolish dedicated MEP systems serving current Macy’s tenant space. All work will be coordinated to ensure cotinuous operation of hotel floors above

A building permit was issued for a project at 5016 N Maryland Ave:

New 3 story apartment building with a total of 12units, buildings g and k connected by a breezway, site improvements, drywell, detached trash enclosure less than 120 sq ft. ***nfpa 13 sprinkler system required***

The first building permit for 1430 NW Glisan was issued to Ankrom Moisan Architects:

STR 01 – structural permit up to the underside of level 2 for a 286,000 GSF mixed-use building with 4 levels below grade for parking. General retail on level 1. 230 residential units on levels 2-15. 200 below grade parking spaces, no mechanical install with this phase of work.

A building permit was issued to Holst Architecture for the Asian Health and Services Center at 9035 SE Foster Rd:

Construct new 3 story 30,140 sf office building with assembly space on level 3 and ground floor commercial lease space, includes onsite parking and associated site work

5 thoughts on “Metro Reports: 1430 NW Glisan, Asian Health & Services Center, 5 MLK, and more

    • By the submission history (Solterra Strata) it looks to be the empty lot on Williams in front of the Baptist Church. Not sure why the change of address but the project scope + team look to be the same.

        • The original Strata address was 3138 N Vancouver, despite fronting N Williams, because the lot was purchased from the Church, who had consolidated most of that block to a single address (that of the Church).

          I imagine the building will get a N Williams address if it’s ever built.

Leave a Reply to TimCancel reply