Metro Reports: PCC Metro Center, Market Street Apartments, 5802 SE 92nd, and more

The new PCC Metropolitan Workforce Training Center, designed by Bora Architects, has been submitted for building permit review.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers August 2nd, 2021 to August 8th, 2021.

Design Advice has been requested by McGuirl Designs & Architecture for the Market Street Apartments at 1541 SW Market St:

New affordable housing, multi-family building. 8 stories. 125 dwelling units. 2 Off-street loading zones. Stormwater disposal utilizing flow through planters.

A project at 5802 SE 92nd Ave has been submitted for a Pre-Permit Plan Check by Otak:

The proposed project is a multifamily residential building with 47 units and a commercial space in a 5-story building. The building will be connected to an existing 3-story building on the same site. Storm water for the existing building will remain as-is and the new portion of the building will handle storm water via an on-site drywell. No on-site parking will be provided.

A project at 6116 NE Willow St has been submitted for a Pre-Permit Plan Check:

New 9 unit apartment

A project at 10413 E Burnside St has been submitted for a Type II Design Review by Inland Oregon:

We are proposing to build a 211 unit six story (5 wood over 1 concrete) apartment building with one level of underground parking. Units will be restricted to households earning no more than 60% AMI.

A project at 605 SE Spokane St has been submitted for building permit review by Studio Cropp:

Single PDF – construct new 3-story, 8 unit residential complex. 4 units are 2-story and 4 units are single story on ground floor with associated site work.

A project at 2510 SE 21st Ave has been submitted for building permit review by Allusa Architecture:

Single PDF – construct new 2-story restaurant.

The PCC Metropolitan Workforce Training Center at 5600 NE 42nd Ave has been submitted for building permit review:

New two-story, approximately 50,000 sf office building and training center with a mass timber structural system. Includes classrooms, conference and meeting rooms, career center, open office spaces, common areas, a community room, and a leased partner space (w/21-106109-MT). Trash/recycling area included (21-056112-CO).

Metro Reports: St Philip Neri Affordable Housing, 1541 SW Market, 3114 SE Belmont, and more

The St Philip Neri Affordable Housing will include the retention of the 1952 Pietro Belluschi-designed church; the adaptive reuse of the 1913 church; and the construction of a new three story building at SE Division and 16th.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers January 11th, 2021 to January 17th, 2021.

A Pre-Application Conference has been scheduled by SERA Architects and Catholic Charities to discuss the St Philip Neri Affordable Housing at 2408 SE 16th Ave:

St Philip Neri redevelopment project is a total of 50-unit affordable, permanent supportive housing project located on the St. Philip Neri Parish at 2408 SE 16th Ave, Portland, OR 97214 in the Hosford Abernethy Neighborhood District. This redevelopment stems from the City of Portland¿s Expanding Opportunities for Affordable Housing Initiative which rezoned the St. Philip Neri Parish parcel to an RM2 allowing for medium density affordable and permanent supportive housing on the site. A total of 50 units of permanent supportive housing will divided between the adaptive reuse of the existing 1913 Church housing 13 units and a new 3-story construction along the SE Division Street housing 37 units and supportive services spaces. The project will be in collaboration with Catholic Charities of Oregon and the St. Philip Neri Parish and will be specifically targeted to serve families in the community who are most in need. The stormwater will be managed on site via bio swales and
stormwater planters.

A Pre-Application Conference has been scheduled by McGuirl Design & Architecture to discuss a project at 1541 SW Market St:

Scope of work: Demolish non-conforming office building. New 9-story structure with basement. Multi-family as an Affordable Housing Project. Stormwater disposal to utilize flow through planters

A project at 4385 and 4405 N Vancouver Ave has been submitted building permit review:

PDOX PS – construct new 3 story 10 unit apartment building with basement and associated site work

PDOX PS – construct new 3 story 10 unit apartment building with associated site work

A project at 3114 SE Belmont St has been submitted building permit review:

New 5-story 25 unit apartment bldg. and associated site work. w/20-217527-MT, 20-217530-CO

Metro Reports: Davis Lofts, PUC Affordable Housing Initiative, 1122 SE Ankeny, and more

The Davis Lofts at will include 20 units on a site currently occupied by a single family house.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers December 21st, 2020 to December 27th, 2020.

Early Assistance has been requested by Baysinger Partners Architecture for a project at 1401 N Hayden Island Drive:

Construction of a 123-room hotel along the north property boundary and construction of a 4,000 retail store and gas station abutting the N. Hayden Island Drive right-of-way.

Early Assistance has been requested by EPR Design for a project at 7403 N Mobile Ave:

Construct a new 3-story apartment building with associated landscape. No off-street parking. Drywall will be proposed for the impervious area.

A Pre-Application Conference has been scheduled by Bora Architects to discuss a project at 1122 SE Ankeny St:

Proposed apartment building includes 50 units all offered at 60% AMI through a private program. The ‘L’ shaped building is 6 stories and 23,100 gsf. Team is anticipating 5 stories of modular/pre-fab mass plywood construction over a 1 story podium.

A Pre-Application Conference has been scheduled by Mcguirl Designs & Architecture to discuss a project at 1541 SW Market St:

Scope of work: Demolish non-conforming office building. New 9-story structure with basement. Multi-family as an Affordable Housing Project. Stormwater disposal to utilize flow through planters

A Pre-Application Conference has been scheduled by Bora Architects to discuss a project at 4601 SE Cesar E Chavez Blvd:

Through an agreement with Home Forward, the site will be subdivided to create a new parcel at Holgate and 38th. Proposed apartment building includes 52 units all offered at 60% AMI through a private program. The ‘U’ shaped building is 5 stories and 23,000 gsf. Team is anticipating modular/pre-fab mass plywood construction.

The Davis Lofts at 1824 NE Davis St have been submitted for building permit review by Fosler Architecture:

PDOX PS – construct new 3 story 20 unit apartment buidling with associated site work

A building permit was issued to Doug Circosta Architect for the PUC Affordable Housing Initiative at 4785 N Lombard St:

New 3 story, 20 unit apartment building, includes associated sitework