News Roundup: Veritas Place, Big Pink, Legin Commons, and more

Veritas Place is part of a larger plan from the Dominican Friars to redevelop four of its five church-owned blocks.

An Early Assistance application was filed for Veritas Place, the first project in a multi-phase redevelopment of property owned by the Dominican Friars in the Lloyd District. The 100% affordable community would include 159 units, reports the Portland Business Journal.

A $3.9 billion RFQ was issued for the Interstate Bridge Replacement Project. The bi-state project intends to hire a contractor in 2027, with construction starting in 2028.

Once the center of Oregon’s casket industry, the Oregon Casket Building is now listed on the National Register of Historic Places. Current plans would see the long vacant building converted to 34 housing units; a previous proposal to renovate and expand the building for office use was one of the first posts ever on Next Portland.

The Portland Fire and Thorns opened a joint practice facility in Hillsboro, named the Kaiser Permanente Performance Center.

Portland Parks and Recreation is partnering with the United States Tennis Association Pacific Northwest, who will take over operations at the Portland Tennis Center while investing $2.3 million in upgrades.

POD 28 will temporarily close for renovations, reports Bridgetown Bites, with a last day of service September 13th. Next Portland previously covered what the food cart pod will look like when it reopens.

As residents move into the newly completed Legin Commons, Montavilla News writes about a median island planned at the adjacent intersection of SE Division Street and SE 77th Avenue.

Volunteers of America plans to sell three properties it owns at NE 8th & Couch, reports the Daily Journal of Commerce. The proceeds would be go towards planned construction of the VOA Health and Family Services Campus, which would include 100 beds for men and women with children; outpatient treatment; and supportive services.

A replacement for the Keller Auditorium at a new Performing Arts + Culture Center moved a step closer as City Council voted 8-4 to advance plans for a new center for Broadway theater, to be built in partnership between the City of Portland and Portland State University.

Big Pink owner Jeff Swickard floated the idea of a rooftop observation deck at the top of the tower.

With Moda Center renovation talks “stalled”, City Administor Raymond Lee met with Trail Blazers owner Tom Dundon.

Portland City Council approved a resolution that starts the process of transferring development rights for sites near the Moda Center to Albina Vision Trust.

Senior housing provider Willamette View plans to break ground on a 92-unit independent living building named Skyline on its campus near Milwaukie, reports the Daily Journal of Commerce.

News Roundup: Sunnyside Medical Center, North Portland Aquatics Center, East County Library, and more

The new Kaiser Sunnyside will replace the existing facility, to be torn down after the new hospital opens in 2029.

Ground was broken on the new Kaiser Permanente Sunnyside Medical Center in Happy Valley, according the Portland Business Journal. Leaders described it as a “model hospital of the future” with 100% private rooms, advanced robotics, healing gardens and a reduced carbon footprint.

Portland Parks & Recreation revealed the final designs for the North Portland Aquatics Center, reports KGW. The $91 million is due to start construction in 2027.

Demolition began at the historic Governor Building in Downtown, reported the Portland Business Journal. No plans have been revealed for what will happen with the site.

TEDxPortland founder David Rae announced plans for the Portland Sneaker Experience.

KGW covered a unanimous vote of the Portland City Council, which advanced expedited the process for the Inner Eastside Planning Project. The project aims to rezone close-in neighborhoods of the city to allow apartments and therefore increase housing production.

Willamette Week looked at eight ways to get Portlanders back on the Willamette River, including a new nature park at Willamette Cove and the adjacent Portland Botanical Gardens, the Albina Riverfront, the forthcoming design competition for the Tom McCall Waterfront Park Bowl and the Center for Tribal Nations adjacent to OMSI.

The Design Commission’s approval of the Lloyd Center Master Plan has been appealed to City Council by the Northeast Coalition of Neighborhoods and the Save Lloyd campaign, reports the Oregonian. The center’s owner announced that the center will close August 8th. An earlier story looked at where the remaining tenants will be moving.

In Gresham, a major civic project is nearing completion. The Oregonian reports that the new East County Library will feature a rooftop terrace and a 200-seat auditorium when it opens on May 16th.

As Mayor Wilson proposes $120 million for the Moda Center, Oregon Artswatch looked at the “absence of design” in the 1995 structure.

Multnomah County advanced plans for the $29.8 million Sobering and Crisis Stabilization Center on SE Grand Ave, according to the Daily Journal of Commerce.

The estimated cost of replacing the aging Interstate Bridge Replacement Project continues to climb. According to the Oregonian, new projections suggest the project could cost billions more than previously expected. At the same time, BikePortland reports that planned freeway expansion elements have been value engineered out of the project for now.

Innovative Housing Inc, broke ground on 150 units of affordable housing at the Barbur Apartments in Hillsdale, reports the Portland Business Journal.

Condominiums units at the Ritz Carlton Residences in Block 216 barely sold—until prices were slashed, reports the Oregonian.