Metro Reports have moved to Portland Maps Reports. Next Portland covers the highlights of the Early Assistance applications, Land Use Reviews and Building Permits processed each week. This post covers February 14th, 2022 to February 20th, 2022.

Early Assistance has been requested by Lever Architecture for Albina One north of 253 N Broadway:

Construction of a new 100% affordable housing building with 7 stories and 94 units. The project is on the site of an existing surface parking lot and is the first project in the Albina Vision Trust masterplan. In addition to the apartments, the building will have resident services run by POIC-RAHS, a community room and property management spaces. This is an early design however there is potential for balconies as shown in the drawings and the client would like to include solar panels on the roof. The intent of the project is to create a plaza/open area on the south side of the building that might be activated for community gatherings. An open area on the north side would be for a kids play area and resident use only.NOTE: Project is subject to a Type 3 DZ but applicant is choosing a Type 2 per footnote 2 Table 825-1.

A project at the SW Corner of NW 17th Ave & NW Couch St has been submitted for a Type III Historic Resource Review:

HLC HEARING – Type III Historic Resource Review for a proposed new 5-story, 19-unit apartment building on the site of a non-contributing surface parking lot in the Alphabet Historic District. Ground floor programming includes, residential units, bike parking, trash room, and mail room. Materials include: ¿cast stone veneer¿ base, brick veneer on stories 2-5, and aluminum clad wood windows. No parking is proposed. No Modifications or Adjustments are proposed. The proposal includes non-exempt development within the Alphabet Historic District therefore prompting Historic Resource Review prior to the issuance of building permits.

Early Assistance has been requested by Design Research Office for a project at 4066 NE Grand Ave:

40 unit, six-story affordable housing project intended to serve black seniors earning less than 30% MFI. The building will include approximately 32,000 gross square feet of interior area and 3,500 gross square feet of exterior common area, balconies and with a rooftop deck. Stormwater will be managed by flow-through planters at grade.

A renovation to PSU Vernier Science Center (previously Science Building One) at 1025 SW Mill St has been submitted for a Type II Design Review by Bora Architecture and Interiors:

Inaccessible stairs to the podium from 10th Avenue and Mill Street will be removed. A new stair and accessible ramp on Mill Street will provide an equitable access point to the podium level from the south. The existing accessible ramp to the west from 11th Avenue will be maintained. – The accessible building entry will be rebuilt on the south side of the building at the podium level and will include a new vestibule. This will be the primary entry to the building. The proposed design removes all occupied uses from the 6th floor, in order to bring the building height below the threshold that would trigger high rise construction requirements. The existing enclosure at the 6th floor will be retained to as great extent as possible and used to house mechanical equipment. The existing façade will be modified as part of this project. The podium-level enclosure at the first floor will be replaced in its entirety and its footprint expanded. The new façade will be primarily glass, with some solid panels – On the upper floors of the tower, all existing windows and panels will be removed and replaced in the same location that they currently exist. New thermally insulated windows and panels will be installed; new windows will be introduced into the east and west facades which are currently clad with opaque panels. On the north and south elevations, the recessed window position as it currently exists will be retained. – At the podium walls to the basement, new windows will be introduced on the 10th Avenue Façade – The remaining exterior finishes will be cleaned and repainted.

A project at 7520 N Westanna Ave has been submitted for building permit review by Baysinger Partners:

PDOX PS: new 3 story- 12 unit apartment building with associated siteworks.W 22-113304-CO & 22-113312-MT.

A project at 485 and 495 NE Jessup St has been submitted for building permit review:

PDOX PS – south 6-plex – new 3-story, 6-plex and associated site work. Detached trash enclosure (less than 120 sf). w/ 22-103867-CO

PDOX PS – north 6-plex – new 3-story, 6-plex. w/​ 22-103864-CO

A project at 3591 N Michigan Ave has been submitted for building permit review:

PDOX PS – new 3 story apartment building with 6 units and associated site work including detached trash enclosure and bike enclosure less than 120 sq ft in floor area. ***with 22-112289 MT***

Building permits were issued to MWA Architects for the Canopy Apartments at 12475 and 12485 SE Powell Blvd:

THE CANOPY APTS – BLDG A – New 3 story, 91 unit apartment building with resident community room and support spaces; includes associated site work and surface parking *** w/21-047201-CO, 21-047212-CO, 21-047219-MT, and 21-047220-MT ***

THE CANOPY APTS – BLDG B – New 4 story, 78 unit apartment building with resident community room and support spaces; includes associated site work and surface parking *** w/21-047199-CO, 21-047212-CO, 21-047219-MT, and 21-047220-MT ***

A building permit was issued for a project at 1610 SE Cesar E Chavez Blvd:

Construct new 4 story 47 unit apartment building with associate site work

A building permit was issued for a project at 4712 N Williams Ave

PDOX PS – new 3-story 13-unit apartment building with associated site work; detached trash enclosure < 120 sf, 97214

A building permit was issued for a project at 121 N Going St

New 3-story 6-unit apartment building with associated site work. Detached trash enclosure < 120sf ***mechanical permit separate***

Building permits were issued for a project at 6841 and 6845 N Montana Ave

Single pdf – construct new 2 story, 6 unit apartment building. Shared egress with adjacent apartment building under permit #20-148272 CO. Associated site work.

Single pdf – construct new 2 story, 6 unit apartment building. Shared egress with adjacent apartment building under permit # 20-148307 CO. Associated site work.

Metro Reports: Sandy Pine, Modera Main, 550 MLK, and more

Sandy Pine will be a 12-story, 250,000 sf mass timber mix-use high rise with 271 dwelling units. The project design is by Lever Architecture for developer Solterra.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers September 20th, 2021 to September 26th, 2021.

Design Advice has been requested by Lever Architecture for Sandy Pine at 900 SE Sandy Blvd:

Construction of a new, 12-story, 250,000 sf mix-use high rise. The program will include split level retail with activated courtyards on the ground level, 1.5 levels of below-grade parking, and 271 dwelling units on levels 2 through 12. The residential levels will offer exterior balconies for each unit, and will also include a variety of amenities such as lounges, workspaces and fitness centers. Stormwater to be managed onsite.

Early Assistance has been requested by McGuirl Designs and Architecture for a project at 7246 N Mohawk Ave:

New Construction. Multi-family use. 1 Building. 3 Stories. 37 dwelling units. No off street vehicular parking. On-site drywell for stormwater disposal.

A project at 507 NE Jessup St has been submitted for a Pre-Permit Plan Check:

Two new 6-plexes (to create a total of 12 units on the lot).

A project at 5439 SE 89th Ave has been submitted for building permit review by McGuirl Designs and Architecture:

PDOX PS – new 3-story 24 unit apartment building with inclusionary housing. Asscoiated site work for parking lot. Trash enclosure permit separate. w/ 21-084943/6-CO and 21-084948-MT

The Modera Main at 1155 SW 19th Ave has been submitted for building permit review:

MODERA MAIN – New 17 story, 337 unit apartment building with 403 structured parking spaces, indoor and outdoor amenities, includes associated site work . ** Review w. 21-085043-MT, tunnel 21-085444-CO/21-085447-MT and connection of tunnel to existing Multnomah Athletic Club 21-085453-CO

MODERA MAIN – TUNNEL – New approximately 75′ concrete tunnel with 2-way drive surface and pedestrian walkway connecting new building to existing MAC parking garage to the north *** w/21-085032-CO/21-085043-MT new building /21-085447-MT Tunnel HVAC and 21-085453-CO MAC connection ***

550 MLK has been submitted for building permit review:

550 M L K – New 7 story (5 over 2) mixed use 132 unit apartment building with basement, parking and associated site work. w/21-084386-MT

A building permit was issued for a project at 7152 N Greenwich Ave:

Single PDF – new 3 story apartment building with 18 units.

A building permit was issued for a project at 4014 SE Holgate Blvd:

New 2 story, 4 unit apartment with landscaping