Metro Reports: Hayu Tilixam, Great Scott, Cooper 52, and more

Hayu Tilixam is a new building proposed on NE Prescott, with a name that means “Many Nations” in Chinook. The 50-unit affordable housing development is being developed Community Development Partners and Native American Youth and Family Center, on a site purchased by the Portland Housing Bureau in 2018.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers October 19th, 2020 to October 25th, 2020.

A project at 4937 SE Woodstock Blvd has been submitted for a Type II Adjustment Review by Scott Edwards Architecture:

New 4-story mixed-use building with about 2,000 sq. ft. of ground floor retail space facing Woodstock Blvd. and 84 rental dwellings on all floors consisting of studios, 1-bed, 2-bed and 3-bed units. One enclosed loading space will be provided on site with access from 50th Ave. Enclosed bike parking is accessible from the lobby area and directly from the sidewalk on Woodstock Blvd. A ground floor community room will be provided with direct access to a courtyard patio and active landscaped space. Several private porches will also be provided for the ground floor units. Stormwater to be accommodated with a combination of dry-wells, landscape and an ecoroof. Adjustment requested to reduce the landscape buffer.

Great Scott at 701 E Burnside St has been submitted for a Type III Design Review by Convergence Architecture:

The Great Scott Trio is a new four story mixed use affordable housing development located where there is currently a parking lot. The legal lot includes a one story existing brewery building that will remain. The project is on the northeast corner of E Burnside and NE 7th Avenue. The Orleans Building, which is on the historic register, is directly to the east and its arcade is highly influential to this project. The building will have 38 apartments, including two accessible units on the ground floor, as well as three retail spaces also on the ground floor along the E Burnside arcade. A small plaza will be located between the new building and the existing building to the north.

Hayu Tilixam at 5825 NE Prescott St has been submitted for building permit review by Carleton Hart Architecture:

New 4-story, 50 unit PHB residential building with community spaces and associated site work. w/20-198018-MT

Cooper 52 at 6865 SE 52nd Ave has been submitted for building permit review by YBA Architects:

PDOX PS – construct new 3 story 25 unit apartment building with associated site work w/20-198405-CO (trash enclosure) & 20-200255-MT

A building permit was issued to Fosler Portland Architecture for a project at 2514 NE Flanders St:

New (3) story, (6) unit apartment building, located mid block, includes associated sitework

Metro Reports: Modern Times Brewing, 3000 SE Powell, 4708 NE Sandy, and more

A project by Koz Development at 4708 NE Sandy Blvd has been submitted for building permit review. The development is located on a site currently home to a single story bank building. The new building will incorporate new space for Umpqua Bank, including a drive through facility.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers October 22nd to October 28th, 2018. 

Early Assistance has been requested for a project at 2781 NW Sussex Ave:

Develop property with a 6-plex.

Early Assistance has been requested by Alamo Manhattan for a project on South Waterfront Blocks 41, 42, 44 and 45:

Project including four separate mid-rise structures with a mixed-use program comprised of multi-family housing (approximately 1,026 units total), commercial and parking uses. Parking for approximately 625 cars will be provided overall. The project will also include greenway improvements and infrastructure.

A Pre-Application Conference has been scheduled by ZGF Architects to discuss a project at 1202 NW Irving St:

Approximately 10-story/170,000 gsf hotel including a ground floor lobby, one floor of below grade parking and a rooftop amenity

A Pre-Application Conference has been scheduled by Holst Architecture to discuss a project at 830 SE 102nd Ave:

Construction of up to 80,000 SF rehabilitation center to include residential and outpatient chemical dependency treatment facilities for adults and youth

A Pre-Application Conference has been scheduled by Holst Architecture to discuss a project at 3000 SE Powell Blvd:

This is a Portland Housing Bond project. New affordable housing structure(s) of approximately 120-200 units.

A project at 2514 NE Flanders St has been submitted for building permit review:

New (3) story, (6) unit apartment building, located mid block, includes associated sitework

A project at 4708 NE Sandy Blvd has been submitted for building permit review:

New 6 story mixed use building with 112 living units above tenant space, bike parking, parking, mechanical rooms, and trash room on first level, includes associated site work *** mechanical permit to be separate ***

A project at 212 SE 143rd Ave has been submitted for building permit review by Doug Circosta Architect:

New 60 unit apartment complex in 5 buildings. Building 100 apartment units, short term bicycle parking and covered porch

New 60 unit apartment complex in 5 buildings. Building 200 12 new apartment units

New 60 unit apartment complex in 5 buildings. Building 300 18 new apartment units and short term bicycle parking

New 60 unit apartment complex in 5 buildings. Building 400 12 new apartment units

New 60 unit apartment complex in 5 buildings. Building 500 6 new apartment units, trash enclosure and laundry

A building permit was issued to Woodblock Architecture for Modern Times Brewing at 600 SE Belmont St:

TI and addition for new tenant and partial change of occupancy from F to A, S, and B; new mezzanine over trash and office, new walk in cooler, bar, canning, tasting room on main floor; new rooftop patio, (2) egress stairs, (2) bathrooms and elevator ***ossc seismic upgrade***

Building permits were issued for three buildings at 6400 SW Canyon Ct:

Building 1 – 76 units, 4 stories of living over 2 stories of below grade parking and site utilities

Building 3 – 59 units, 3 stories over 1 story of structured parking

Building 4 – 60 units, 3 stories of living over 1 floor of structural parking

A building permit was issued for a project at 2108 NE Everett St and 2155 NE Davis St:

New construction of 3 story 6unit bldg with detached 102sf trash enclosure bldg A fronts NE Everett st, work to include site utilites and improvements

New construction of 3 story 6unit bldg with detached 102sf trash enclosure bldg B fronts NE Davis working to include site utilites and improvements

 

Metro Reports: 815 W Burnside, Parallax, SW 4th & Grant, and more

A building permit was issued for the Parallax apartments, designed by William Kaven Architecture

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers February 26th to March 4th, 2018. Note that this post previously included some projects that should have been included with the following week’s metro reports.

Design Advice has been requested by Ankrom Moisan Architects for a project at 815 W Burnside St:

Proposal is for a new seven story mixed use residential and commercial development which includes 144 mixed, 2-bed, 1-bed and studio apartments with ground floor amenity and rooftop outdoor deck, commercial space and one level of below-grade parking.

Early Assistance has been requested for a project at 6040 NE 42nd Ave:

Current code: Proposal is for a 9 unit, multi-dwelling residential apartment building consisting of (9) 3-story townhouses of Type VA-NFPA 13R construction. The ground floor of each unit includes an outdoor room, main entrance, bonus room, garage and trash/recycle area. Tandem spaces are provided in the driveway extension.

Early Assistance has been requested for a project at 2514 NE Flanders St:

Current code: Six-unit multi-family development in R1 zone. Site is adjacent to a frequent service bus line. 4 garages are proposed for units 1-4. Access to units proposed through private driveway. Applicant proposing to use density bonus options to increase maximum allowed density from 5 units to 6 units.

Early Assistance has been requested by CIDA Architects for a project at SE 174th St and Kendall Ct:

No changes to site/project due to comp plan & zone map changes: New one-story building for office and manufacturing.

Early Assistance has been requested by Deca, Inc for a project at 14507 E Burnside St:

Current code: Proposal is for new construction of a four story apartment building which will be approximately 69,500 SF with 76 dwelling units and a new 21 stall surface parking lot.

Early Assistance has been requested by Dowl for a project at 12044 SE Division St:

Current code info: Partial demolition of existing Burger King (3,929 sq ft reduced to 3,082 sq ft) and development of a new drive thru pad. Project will include new and reconfigured parking and associated landscaping improvements. Stormwater will be disposed on site via drywells New trash enclosure will be constructed to serve the two new restaurants. New pad is 2,507 sq ft.

A revised permit for a project at 1645 SE Nehalem St has been submitted for review by Urban Development Group

New 4 story 63 unit apartment building, associated site work.

Two building permits were issued to Holst Architecture for the Overlook apartments at 1314 N Skidmore St and 4284 N Maryland Ave:

Overlook – East Building – 68 units over parking and retail space for lease.

West Building – 90 units, over parking and retail space for lease

A building permit was issued for the Parallax apartments at 4030 N Williams Ave:

New 5 story mixed use building; retail on first floor; 4 stories of 66 residential apartments; tuck under parking; associated site work

A building permit was issued to Koz Development for the SW 4th & Grant Apartments at 2211 SW 4th Ave:

New, 6 story 108 unit studio apartment building with mezzanines on 5th and 6th floors.(send all revisions to Gail for review)

A building permit was issued for the parking garage being developed as part of the Convention Center Hotel project:

New 8 story parking garage with ground floor commercial space.