Metro Reports: Isaka Shamsud-Din Apartments, ALTA Centric, Con-Way Blocks 261 and 262, and more

Sabin CDC is developing a 29-unit affordable housing development at NE 14th Pl and Killingsworth, named after a local Black artist Isaka Shamsud-Din. The building is being designed by Scott Edwards Architecture.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers May 17th, 2021 to May 23rd, 2021.

Design Advice has been requested for a project at 10413 E Burnside St:

Construction of a 211-unit six story (5 wood over 1 concrete) apartment building with one level of underground parking. Units will be restricted to households earning no more than 60% AMI.

Design Advice has been requested by SERA Architects for Con-Way Blocks 261 and 262:

The proposal is for blocks 261 and 262 in the Con-Way Master plan area. The proposed development will be market rate apartments on both parcels. Block 261 will be a 5 story building with tuck under parking, and block 262 will be a 6 and 7 story building with basement parking. Stormwater disposal is anticipated to be through dry wells

Early Assistance has been requested by Holst Architecture for a project at 432 NE 74th Ave:

RIP Code Analysis – Multi-family affordable housing development with approximately 125 units with associated on-site parking and site improvements on a split-zone (CM2 & R2.5) site. Stormwater will be managed on site in accordance w/ BES standards.

Early Assistance has been requested by Works Progress Architecture for a project at 4520 N Colonial Ave:

Development of a three story multi-family apartment building. Site will provide bike parking, on site parking, and has designated easements for fire access and pedestrian access to the adjacent site.

Early Assistance has been requested by Works Progress Architecture for a project at 1560 N Going St:

Development of a three story multi-family apartment building. Site will provide bike parking, and has designated access for fire and pedestrians by easements through the adjacent site.

Early Assistance has been requested by Scott Edwards Architecture for a project at 3314 SE Powell Blvd:

The project team is looking at two new commercial development options, with Option B, being chosen as the option for discussion. Option A: The proposed scope of work includes the design and construction of a new one-story, 5,000 SF commercial building. Option B: The proposed scope of work includes the design and construction of a new 3-story, 28,000 SF core and shell building for commercial use.

A Pre-Application Conference has been scheduled by GBD Architecture to discuss the RiverPlace Redevelopment:

A Pre-Application Conference to discuss a proposed Central City Master Plan for approximately 8 acres that includes the following addresses: 0150, 0308 – 0320 SW Montgomery St., and 2025 WI/ and 2025 SW River Parkway.

The ALTA Centric at 1634 SW Alder St has been submitted for building permit review by SERA Architects:

ALTA CENTRIC – New mixed-use multifamily project with 6 residential stories, 203 apartment units with common areas for bike parking, lobby/mail, and a future retail tenant (by others). Concrete on levels P1 and L1 with wood-framed construction above. ***Review w DEMO 21-049475-CO and 20-135132 -MT

The Isaka Shamsud-Din Apartments at 5421 NE 14th Pl have been submitted for building permit review:

New Four story, 29 unit affordable multi-family residential complex located on NE 14th Place at NE Killingsworth. No parking to be provided. Community room and shared outdoor space to be provided. Proposed site development includes new utilities, accessible courtyard, landscaped areas and street trees. (with 21-036139-MT)

A project at 5740 NE 72nd Ave has been submitted for building permit review:

East Building / New three story, 6 unit multi-family building consisting entirely of affordable housing composed of two building. Surface parking to be provided. Community room and shared outdoor space to be provided. Proposed site development includes new utilities, landscaped areas and parking. (w/ 21- 036221-MT)

West Building / New three story, 6 unit multi-family building consisting entirely of affordable housing composed of two building. Surface parking to be provided. Community room and shared outdoor space to be provided. Proposed site development includes new utilities, landscaped areas and parking. (w/ 21- 037910-MT and 21-036216-CO & 21-036221-MT).

A building permit was issued for a project at 2475 SE 30th Ave (previously 2933 SE Division St):

Construct new 4 story mixed use building; main floor to include retail space and 2 residential units; floor 2-4 to include 16 apartment units; associated site work

Building permits were issued to Doug Circosta Architect for the 146th & Burnside East Apartments at 10, 20 and 30 NE 146th Ave (previously 14603 E Burnside St):

146 EAST – BLDG 100 – This project consists of 70 total new affordable apartment units. The units are located in (3) detached three story buildings with on- site parking spaces, user amenities, and trash enclosure. Unit counts are 30 in Building 100, 24 in Building 300, and 16 in Building 200. Both the bike shelter and trash enclose will require separate permits. ** No Mechanical with these permits *****review w. 20-173847/51/72-CO

146 EAST – BLDG 200 – This project consists of 70 total new affordable apartment units. The units are located in (3) detached three story buildings with on- site parking spaces, user amenities, and bike parking inside trash enclosure. Unit counts are 30 in Building 100, 24 in Building 300, and 16 in Building 200. Both the bike shelter and trash enclose will require separate permits.**No Mechanical with these permits****review w. 20-173775/851/872-CO

146 EAST – BLDG 300 – This project consists of 70 total new affordable apartment units. The units are located in (3) detached three story buildings. Bike parking in trash enclosure. Unit counts are 30 in Building 100, 24 in Building 300, and 16 in Building 200. Both the bike shelter and trash enclose will require separate permits.***review w. 20-173775/847/872-CO

Building permits were issued to Doug Circosta Architect for the 146th & Burnside West Apartments at 11 and 21 NE 146th Ave (previously 14507 E Burnside St):

146 WEST – New 3-story, 24 Unit apartment building (1 of 2) with detached trash enclosure and associated site work. No Mechanical with this permit ***Review with 19-256079-CO (BLDG 2) and 19-256081-CO (Trash Encl) ***Transitioned to Complex ProjectDox Review 12/29/20

146 WEST Bldg B200 – new 3-story 22 unit apartment building with office and common laundry room. No Mechanical with this permit **Review w. 19-256078- CO & 19-256081-CO. *** Project transitioned to “complex” plan review and Process Managed after 1st review cycle.

A building permit was issued for Floor & Decor at 11941 N Jantzen Dr:

PDOX PS – new 1-story building for flooring retailer with associated sitework w/20-203128-MT

Metro Reports: Pearl Building East, Atomic Orchard, Society RCP, and more

A building permit is under review for the Atomic Orchard on NE Sandy Blvd.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers November 18th to November 24th, 2019.

A Pre-Application Conference has been scheduled by TVA Architects to discuss a project at 2997 SW Moody Ave:

New mixed-use project in two buildings, with residential units above ground floor retail and at-grade level parking. The construction is 5 levels of 3B over 2 levels of 1A on one of the buildings, and the construction is 10 levels of 1A on the other building. Stormwater management to be determined.

The Atomic Orchard at 2510 NE Sandy Blvd has been submitted for building permit review by Brett Schulz Architect:

New 5 story 49-unit multifamily apartment building with ground floor retail and one accessible dwelling unit in attached ground floor annex building, includes associated site work *** w/19-193113-MT ***

The Modera Woodstock at 4804 SE Woodstock Blvd has been submitted for building permit review by Leeb Architects:

MODERA WOODSTOCK – New 5-story, 194 unit apartment building with one level below-grade parking and ground floor commercial spaces; includes associated sitework *** w/19-247370-MT ***

A project at 14507 E Burnside St has been submitted for building permit review by Doug Circosta Architect:

New 3 story 22 unit apartment building with office and common laundry room

New 3 story 24 unit apartment building with associated site work

A project at 115 N Going St has been submitted for building permit review by Urban Development Group:

New 3-story 6-unit apartment building with associated site work. Detached trash enclosure < 120sf ***mechanical permit separate***

A project at 5105 SE Woodstock Blvd has been submitted for building permit review:

New 3-story, 28-unit apartment building with interior trash enclosure, bike storage room and short-term bicycle parking.

The Society RCP apartments at 1435 NE 62nd Ave have been submitted for building permit review by Koble Creative Architecture:

New 3-story, 3-unit apartment building, including interior trash, associated sitework and on-site stormwater management.

The Pearl Building East has been submitted for building permit review:

New 7-story mixed use high-rise office building with three levels of underground parking garage and a penthouse amenity space *** w/19-237841-MT ***

Building permits were issued for a project at 408 SE 105th Ave:

Building 1 of 3 new apartment buildings, two stories with two units (see comments), includes associated site work *** 18-270002/04-CO & 18-280941/44/45-MT ***

Building 2 of 3 new apartment buildings, three stories with six units, includes associated site work *** w/18-269978-CO & 18-270004-CO & 18-280941/44/45-MT ***

Building 3 of 3 new apartment buildings, three stories with five units and community room, includes associated site work *** w/18-269978-CO & 18-270002-CO & 18-280941/44/45-MT ***

Metro Reports: Findley Commons, 1120 SE Morrison, 3733 N Williams, and more

According to the Portland Housing Bureau, Findley Commons will redevelop parking lot space at St. Mark’s church to create 38 units of Supportive Housing focused on underserved veterans.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers March 11th to March 17th, 2019. 

Design Advice has been requested by SERA Architects and Mill Creek Residential Trust for a project at 1120 SE Morrison St:

The proposal is for a 7-story market rate apartment building of approximately 230 units with 2 levels of below grade parking.

Early Assistance has been requested by William Kaven Architecture for a project at 3733 N Williams Ave:

Proposl is for two four-story apartment buildings, one with 17 units and one with 13 units and ground floor retail. Drywell proposed in shared courtyard. Hoping to meet community design standards

Early Assistance has been requested by Doug Circosta Architect for Findley Commons at 5415 SE Powell Blvd:

Findley Commons will provide 36 previously homeless Veterans with safe, stable, and supportive housing with the planned 100% affordable 20, one-bedroom and 16, single room occupancy (SRO) units. The building will feature an elevator, a vast 2,1000 sf community area and service delivery space, and energy efficient appliances and fixtures. the units are in a single building with two and three stories in height. The zoning is CM2 / R2a and the intent is to conform to the Community Design Standards. Parking for the project and the existing church will include 34 spaces. Amenities include onsite laundry facilities, bicycle parking, shared kitchen, support offices, outdoor patio and storage.

A Pre-Application Conference has been scheduled by Scotia Western States Housing for a project at 1325 SW Gibbs St:

The proposed project is a 30-unit multifamily project across approximately 24,000 sf of living space and 4 stories of living space above one level of parking garage on the R-1 portion of the site. Amenity bonuses will be utilized to obtain the full allowable 30 units. The entire multifamily and parking development twill be limited to the existing parking lot area on the R-1 zoned parcel.

The units will be one bedroom units. The R-7 portion of the site wil have the existing improvements (an 8,000 sf assisted living facility) demolished and replaced with 2 duplexes (4 units total). All proposed development will be within the current parking lot/building area and the setbacks will all be within the zoning regulations of the base zones.

A Pre-Application Conference has been scheduled by Doug Circosta Architect for a project at 14507 E Burnside St:

Proposal is for new construction of a four story apartment building which will be approximately 69,500 SF with 76 dwelling units and a new 21 stall surface parking lot. The applicant plans to meet community design standards.

A structural permit was issued to Lever Architecture for the South Building at the Adidas Campus Expansion:

STR 01 – Structure for a new 4-story building (South Building) of mass timber construction built on top of an existing 3-story parking garage. Work includes steel buckling-restrained braced frames, elevator, and stairs at the core of the new building and an OSSC seismic upgrade of the existing parking garage. The existing parking garage also supports two existing buildings (E & F) and is structurally connected to the garage being built to the north under permit #18-188494-STR-01-CO.

A building permits was issued for a building at 6331 SW Canyon Ct:

Building 2 – 72 units, 4 stories of living over 2 stories of structured parking

A building permit was issued to City Craft Development for a project at 4626 N Maryland Ave:

New 3 story apartment building with 30 units, with site improvements, interior trash rooms; 8 ft fence

Metro Reports: 815 W Burnside, Parallax, SW 4th & Grant, and more

A building permit was issued for the Parallax apartments, designed by William Kaven Architecture

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers February 26th to March 4th, 2018. Note that this post previously included some projects that should have been included with the following week’s metro reports.

Design Advice has been requested by Ankrom Moisan Architects for a project at 815 W Burnside St:

Proposal is for a new seven story mixed use residential and commercial development which includes 144 mixed, 2-bed, 1-bed and studio apartments with ground floor amenity and rooftop outdoor deck, commercial space and one level of below-grade parking.

Early Assistance has been requested for a project at 6040 NE 42nd Ave:

Current code: Proposal is for a 9 unit, multi-dwelling residential apartment building consisting of (9) 3-story townhouses of Type VA-NFPA 13R construction. The ground floor of each unit includes an outdoor room, main entrance, bonus room, garage and trash/recycle area. Tandem spaces are provided in the driveway extension.

Early Assistance has been requested for a project at 2514 NE Flanders St:

Current code: Six-unit multi-family development in R1 zone. Site is adjacent to a frequent service bus line. 4 garages are proposed for units 1-4. Access to units proposed through private driveway. Applicant proposing to use density bonus options to increase maximum allowed density from 5 units to 6 units.

Early Assistance has been requested by CIDA Architects for a project at SE 174th St and Kendall Ct:

No changes to site/project due to comp plan & zone map changes: New one-story building for office and manufacturing.

Early Assistance has been requested by Deca, Inc for a project at 14507 E Burnside St:

Current code: Proposal is for new construction of a four story apartment building which will be approximately 69,500 SF with 76 dwelling units and a new 21 stall surface parking lot.

Early Assistance has been requested by Dowl for a project at 12044 SE Division St:

Current code info: Partial demolition of existing Burger King (3,929 sq ft reduced to 3,082 sq ft) and development of a new drive thru pad. Project will include new and reconfigured parking and associated landscaping improvements. Stormwater will be disposed on site via drywells New trash enclosure will be constructed to serve the two new restaurants. New pad is 2,507 sq ft.

A revised permit for a project at 1645 SE Nehalem St has been submitted for review by Urban Development Group

New 4 story 63 unit apartment building, associated site work.

Two building permits were issued to Holst Architecture for the Overlook apartments at 1314 N Skidmore St and 4284 N Maryland Ave:

Overlook – East Building – 68 units over parking and retail space for lease.

West Building – 90 units, over parking and retail space for lease

A building permit was issued for the Parallax apartments at 4030 N Williams Ave:

New 5 story mixed use building; retail on first floor; 4 stories of 66 residential apartments; tuck under parking; associated site work

A building permit was issued to Koz Development for the SW 4th & Grant Apartments at 2211 SW 4th Ave:

New, 6 story 108 unit studio apartment building with mezzanines on 5th and 6th floors.(send all revisions to Gail for review)

A building permit was issued for the parking garage being developed as part of the Convention Center Hotel project:

New 8 story parking garage with ground floor commercial space.