Under Construction: The Alexander

The Alexander, a 4 story mixed use building, is under construction at 50 SE 13th Ave. The building will include 69 residential units, with a mix one and two bedroom apartments. A retail space will front onto E Burnside St. 17 vehicle parking stalls and 112 long term bicycle parking spaces will be provided. The project design is by Myhre Group for developer Urban Development Group.

alexander_01

Read More

Metro Reports: 14 stories in the Pearl, 6 stories in Northwest, 4 stories in Sellwood and more

19th & Overton Apartments

Every week, the Bureau of Development services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

Fosler Portland Architecture have requested Early Assistance for a project at 8510 N Ivanhoe:

Construct new three story apartment building with courtyard on the 100×100 corner parking lot.

Mackenzie have requested Early Assistance for a project at 815 NW 13th Ave:

Early assistance for interior alterations and future Type II design review for exterior alterations

Early Assistance has been requested for a project at 4227 N Massachusetts Ave:

New 12 unit residential building

Ankrom Moisan Architects have scheduled a Pre-Application conference to discuss a new building at 535 NW 11th Ave:

Pre-Application Conference to discuss a Type III Design Review for a new 14-story residential building with ground-level retail. The building will contain approx. 98 dwelling units and have 52 on-site mechanized parking spaces. The applicant intends to utilize FAR transfer and earn bonus height.

GBD Architects and Gerding Edlen have applied for a building permit for the recently approved 19th & Overton Apartments:

New 6 story, 58 unit apartment building; ground fl parking, bike parking, leasing office, residential lobby, building services and 3 residential loft units; floors 2-6 include residential units; amenity deck on the roof

Waterleaf Architecture have applied for a building permit for the conversion of the existing Regal cinema at the Lloyd Center into creative office space:

Renovation of existing regal cinema space, into creative office with change in occupancy from A to B; newly configured and framed mezzanine; new entrance court with trellis element; new stair and ramp system on west side of the building; new windows throughout the building***see 15-113702-fa for demolition***

A building permit has been issued to Urban Development Group for their redevelopment of the Old Wives Tales site at 50 SE 13th Ave:

New 4 story mixed use building, 69 units, parking, bike parking and trash storage at underground level, includes associated site work mechanical and electrical require separate permits. Permit submittals shall include revised main building permit drawiings.

A building permit has been issued to Fosler Portland Architecture for a project by WDC Properties at 5490 SE Milwaukie Ave:

Construct 3 story apartment building with 11 units, 4 single story units on main floor and 6 2 story units on 2nd/3rd floor; detached covered bike parking and trash enclosure at NE corner of property, less than 120 sf in area; includes associated sitework, landscape, drywell.

The Cook Street Lofts at 3270 N Vancouver Ave by Otak Architects has been issued a building permit:

5-Story, 104 unit apartment building with on grade parking under the building and concrete retail

Metro Reports: Grant Park Village, St John Fisher Parish and more

Grant Park Village context. Phase I was completed in late 2014. Image by LRS Architects.

Grant Park Village context. Phase I was completed in late 2014. Image by LRS Architects.

Every week, the Bureau of Development services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

Otak Architects have requested Early Assistance for a project at 1324 SE Oak St:

4 story apartment building with 46 units and basement level for parking and storage.

Early Assistance has been requested for a project at 3035 SE 92nd Ave:

30-unit apartment complex

Tiland-Schmidt Architects have requested Early Assistance for a remodel of the AMF Bowling Alley at 3031 SE Powell Blvd:

Remodel existing bowling alley to grocery store

Urban Development Group have requested Early Assistance for a project on a triangular plot of land at 1111 SE Sandy Blvd:

New 6 story mixed use building with 80 apartment units above 5245 sf of retail. Stormwater to be managed through deep drywells with no overflow to city sewer

Brett Schulz Architect has requested Early Assistance for a project at 8307 N Ivanhoe St:

5 Live Work 3 story Units

LRS Architects have requested a Pre-Application Conference for a project at 3204 NE Weidler St, presumably Grant Park Village Phase II:

Five story housing over sub-grade parking structure.

Soderstrom Architects have requested a Pre-Application Conference for work at St John Fisher Parish:

Pre-application conference to discuss Type III Conditional Use Review to construct a new parish hall and make alterations to existing church and church rectory.

DiLoreto Architecture have requested a Pre-Application Conference for work at St. Joseph the Worker Catholic Church:

Pre-Application Conference to discuss conditonal [sic] use review for new 650 seat church building and small office building. Existing church will be remodeled to become new social hall.

Scott Edwards Architecture have applied for an Adjustment Review for a project at 2720 SE Steele St:

New three story 15 unit apartment building. Adjustment for 33.266.110 minimum parking standards.

A permit is under review for a new building at 4928 SE Franklin St:

Construct new 3 story 6 unit apartment building with associated site work

Urban Development Group was issued a permit for the demolition of the former Old Wives Tales building at 50 SE 13TH Ave, which is set to become an apartment building with 69 units:

Demolish single story restaurant building and parking lot