Freewell (previously known at Con-way Block 291E) has been submitted for building permit review

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers March 1st, 2021 to March 7th, 2021.

Early Assistance has been requested by Jones Architecture for a project East of 208 NE Hancock St:

New 3-story, 18-unit multi-family, micro-unit residential building. Stormwater management TBD

Early Assistance has been requested by TriMet to discuss the HollywoodHUB at 4110 NE Halsey St (current Hollywood Transit Center):

Vacation of NE 42nd Avenue between NE Halsey Street and I-84 Pedestrian Bridge to allow for (i) the construction of new pedestrian/bike access to the Hollywood MAX Station and Laurelhurst neighborhood, (ii) new TriMet and public infrastructure, and (iii) to make the Hollywood Transit Center viable for a new 213-unit affordable housing building. Stormwater treatment will be in dry wells on site with additional bio swales as needed. Detailed project information is included in the attached presentation.

A Pre-Application Conference has been scheduled to discuss a project at 10413 E Burnside St:

We are proposing to build a 225 unit six story (5 wood over 1 concrete) apartment building with one level of underground parking. Units will be restricted to households earning no more than 60% AMI. We are evaluating site conditions for infiltration, if not feasible we will discharge to the public storm system.

A project at 234 NE 61st Ave has been submitted for building permit review:

PDOX PS – Construct new 3 story 15 unit apartment building with associated site work

Freewell at 2030 NW Raleigh St has been submitted for building permit review by SERA Architects:

FREEWELL – BLOCK 291E – New 7-story apartment building with 192 apartment units, residential amenity spaces, and commercial space attached to new 2-story pavilion building by 2nd level pedestrian bridge; includes one level shared below grade parking and associated site work *** w/20-203695-MT ***

Building permits were issued to Studio 3 Architecture for a project with buildings at 5960 and 5980 E Burnside St:

New 4-story 42-unit apartment building with associated site work; no onsite parking; detached trash enclosure < 120 sf; mechanical permit separate for w/19-269743/44-CO

New 4-story 29-unit apartment building with associated site work; no onsite parking; detached trash enclosure < 120 sf; mechanical permit separate for /19-269743/44-CO

A building permit was issued to Stewart Gordon Straus Architect for a project at 278 SW Arthur St:

New 2 story office building, parking lot, site improvements, landscaping, retaining walls.(mechanical separate)

Metro Reports: Marquam Hill Apartments, 7 NE Oregon, 7530 N Interstate, and more

Building permits were issued for the Marquam Hill Apartments, a three building development on SW 12th Ave designed by Steelhead Architecture.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers December 30th, 2019 to January 5th, 2020.

Early Assistance has been requested by City Craft Development for a project at N Going and Montana:

New 3-story, 15-unit, residential apartment building

Early Assistance has been requested by PLACE for a project at 7 NE Oregon St:

Construction of a new structure, with a healthy mixed-income, mixed-use, transit-oriented community featuring art and culture and affordable living.

A project at 7530 N Interstate Ave has been submitted for building permit review by McGuirl Designs & Architecture:

New construction of 3 story with basement, mixed use B and R-2. And associated site works. 3 floor units will have mezzanine. 17 dwelling units, 14 sleeping units (first floor and basement) , ground floor commercial spaces. Trash tuck under structure on east side.

A project at 5920 and 5960 E Burnside St has been submitted for building permit review by Studio 3 Architecture:

New 4-story 42-unit apartment building with associated site work; no onsite parking; detached trash enclosure < 120 sf; mechanical permit separate w/19-269743-CO

New 4-story 29-unit apartment building with associated site work; no onsite parking; detached trash enclosure < 120 sf; mechanical permit separate w/19-269744-CO

A project at 5855 SE 72nd Ave has been submitted for building permit review:

New 15-unit, 3-story apartemnt building. Interior trash enclosure; associated site work

Building permits were issued to Steelhead Architecture for the Marquam Hill Apartments at 3158, 3178 and 3192 SW 12th Ave:

New 3 story 8 units multifamily building on consolidated tax lots. Includes parking. With 19-135415 MT

New 5 story, 24 unit multifamily building. Includes trash enclosure and parking. Ground floor includes parking, stair and lobby. With 19-135394 MT

New 5 story, 40 units multifamily building on consolidated tax lots and associated siteworks for all three buildings. Includes trash enclosure and parking. Ground floor includes parking, stair and lobby. With 19-135378 MT

Metro Reports: Eleven West, Floor & Decor, 2291 NW Glisan, and more

Eleven West
An excavation and shoring permit is under review for the Eleven West Tower.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers September 16th to September 22nd 2019.

Early Assistance has been requested by Studio 3 Architecture for a project at 5920 E Burnside St:

Remove Existing buildings. Construct 2 new apartment buildings. 62 units total. 4 story with inclusionary housing.

Early Assistance has been requested by Carleton Hart Architecture for Multnomah County’s project at 333 SW Park Ave:

Renovation of an existing, county-owned building for use as a Behavioral Health Resource Center. The building is approximately 24,000 gross square feet, four-and-one-half story structure located on SW Park Ave.

Early Assistance has been requested for a project at 5024 NE Fremont St:

Existing dwelling to be removed and parcel proposed for multi-dwelling unit development for 12 units. Two buildings are proposed with a shared stairway. There is no density requirement in the CM1 zone. Proposed FAR is 1.5

Early Assistance has been requested by William Kaven Architecture for a project at 4047 N Williams Ave:

Two adjacent sites that will be developed under separate ownership, eah with two four-story apartment buildings, one with 17 units and one with 13 units and ground floor retail. Drywell proposed in common courtyard. A separate design review will be needed for each site.

Early Assistance has been requested by Studio 3 Architecture for a project at 8042 N Willamette Blvd:

12 unit apartment building (9,713 GSF) with drywell

Early Assistance has been requested by William Kaven Architecture for a project at 8005 SE 13th Ave:

Construction of one 3-story 19-unit building with ground floor lobby and retail. 60% eco roof coverage is proposed for stormwater.

A Pre-Application Conference has been scheduled by Lance Mueller & Associates Architecture to discuss a project at 55 NE Broadway:

An addition to the existing service shop of Toyota of Portland with structured parking and auto inventory storage over the ground level shop expansion.

A Pre-Application Conference has been scheduled to discuss a Floor & Decor store at 11919 N Jantzen Dr:

A Pre-Application Conference to discuss construction of a new 80,000 square foot building. The proposed tenant is a Retail Sales and Service Use, Floor & Décor, which sells wood flooring and tile to the general public. One hundred four surface parking spaces are proposed. The existing buidling (Safeway) will be demolished.

A Pre-Application Conference has been scheduled by GBD Architects to discuss a project at 1137 NW 23rd Ave:

A Pre-Application Conference to discuss a mixed use building with ground level retail. One level of below grade parking is proposed that takes access from NW Northrup. Approximately 48 parking spaces and one Type B Loading Space are proposed. The retail space is at ground level and is 12,690 square feet in floor area. The upper 4 levels are proposed to have a total of approximately 70 apartments.

An Excavation and Shoring permit is under review for Eleven West at 1102-1116 SW Washington St:

11W – EXC 01- Excavation and Shoring for a New 25 story mixed use building, with 4 below grade floors for parking

A project at 3924 N Montana Ave has been submitted for building permit review:

New 3 story 6 unit apartment building with common lobby, and associated site work including detached trash enclosure under 120 sf mechanical separate

A building permit was issued to Allied Works Architecture for 2291 NW Glisan St (previously 500 NW 23rd Ave):

New construction of 4 story mixed use building, retail on the first floor with associated site work (tenant improvement separate)

A building permit was issued to Studio 3 Architecture for a project at 5311 NE Glisan St (previously 506 NE 53rd Ave):

Construct new 4 story (18) unit apartment building with associated site work and detached trash enclosure under 120sq ft