Metro Reports: 306 SE 8th, 1137 NW 23rd, 2148 NE MLK, and more

306 SE 8th Ave
A proposal for an apartment building at 306 SE 8th Ave, designed by SERA Architects, was approved by the Design Commission in 2017, but never submitted for building permit review. A new Pre-Application Conference for a proposal on the site has been scheduled by the same architecture firm.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers February 24th, 2020 to March 1st, 2020.

Design Advice has been requested by Hennebery Eddy Architects for a project at 539 NW 10th Ave

Project consisting of a new +/-11-story hotel with partial basement on a quarter-block site. The new structure will replace an existing 1-story commercial building. The hotel will contain 150-160 guest rooms with 85,000-90,000 square feet. Loading access is planned along NW Hoyt Street, with a single interior loading bay. No off-street parking is proposed. Ground floor program includes hotel lobby, restaurant, lounge, kitchen, offices, restrooms, mechanical rooms and bike storage. Floors 2-11 will be primarily guest rooms with limited amenity spaces such as fitness room, board room and a roof terrace with bar. Stormwater treatment and detention will be accomplished by way of a vegetated roof.

Design Advice has been requested by SERA Architects for a project at 2250 NW Flanders St

6-story apartment building with approximately186 units in the Northwest Plan District and Alphabet Historic District. Stormwater disposal method TBD.

Design Advice has been requested by SERA Architects for Conway Block 291 East at the SW corner of NW 20th & Raleigh:

7 story market rate apartment building with 180 residential units and basement parking. Stormwater disposal will occur through drywells in the pedestrian way.

A Pre-Application Conference has been scheduled by SERA Architects to discuss a project at 306 SE 8th Ave

New 7 story market-rate apartment building with 113 units and ground floor retail.

Cathedral Village at 8614 N Crawford Street has been submitted for a Pre-Permit Plan Check by MWA Architects:

4-story apartment building with 110 affordable family apartments. The unit mix will be (11) 3-bedrooms, (45) 2-bedrooms, (37) 1-bedrooms, and (17) studios. There will be resident services on the ground floor and 37 parking spaces. There is a basement level at the NW corner of the building that will house bike parking and storage.

A project at 4039, 4047 and 4051 N Williams Ave has been submitted for Type II Design Review by William Kaven Architecture:

Construction of two new 4-story buildings organized around a shared courtyard.

Two new four-story buildings located on N Williams Ave, mid-block between N Mason St and N Shaver St.

New four-story commercial (office) comprised of three stories of office over ground floor retail, office, lobby and tuck-under parking.

A project at 1137 NW 23rd Ave has been submitted for Type III Design Review by GBD Architects:

New mixed use building with ground level retail, 4 levels of apartments above, and 1 level of below grade parking. 74 units.

The new building adjacent to the Troy Laundry at 1010 SE Ash St has been submitted for a Type III Historic Resource Review by Hartshorne Plunkard Architecture:

New 6-story multi-family residential project with two below-grade parking levels.

A project at 236 SE Grand Ave has been submitted for Type III Historic Resource Review by TVA Architects:

New 8-story, 130,000 sq ft office building. One adjustment requested to the loading stall.

The Benson Polytechnic High School Modernization has been submitted for Type III Historic Resource Review by Architectural Resources Group:

Modernization of the existing Benson Polytechnic High School (BPHS) building.

A project at 11 NE 55th Ave has been submitted for building permit review by Fosler Portland Architecture:

Construct new 3 story 16 unit apartment building with associated site work

A project at 5905 N Interstate Ave has been submitted for building permit review by Studio 3 Architecture:

New 3 story, 19 units apartment building with partial retail on ground floor and associated siteworks. Trash enclosure inside.

A project at 8157 N Lombard St has been submitted for building permit review by Mackenzie:

Construction of a 3-story, 8,375 sf multi-family building with eleven (11) units. Ten (10) of these units will be 550 sf and one (1) will be 813 sf.

A project at 6307 N Montana Ave has been submitted for building permit review by Fosler Portland Architecture:

Construct new 3 story 19 unit apartment building with associated site work

A project at 503 SE 29th Ave has been submitted for building permit review:

New 4 story 30 unit apartment building

A project at 6962 N Maryland Ave has been submitted for building permit review:

New 4-story 12-unit apartment with associated site work; w/20-124476-MT

A project at 2148 NE Martin Luther King Jr Blvd has been submitted for building permit review by Ankrom Moisan Architects:

New two-story, 27,595 square foot brick office building with an adjacent surface parking area for ten vehicles

Weekly Roundup: Álmr Apartments, Live Nation at Zidell Yards, Glass Lab, and more

The proposed Live Nation at Zidell Yards music venue went in front of the Design Commission for an initial meeting last week.

Plans for the 10,000 seat Live Nation at Zidell Yards music venue are moving forward, according to the Oregonian.

Work to convert the former Vivian Apartments into the KEX Portland Hostel nearing completion*, writes the Daily Journal of Commerce.

The Oregonian wrote about developer C.E. John’s plans to construct a five story apartment building at 1137 NW 23rd Ave—a change in plans from an earlier proposal to renovate and expand the existing buildings on the site.

The Business Tribune wrote about how Glass Lab is offering a hip hub for start-ups. The building is named for the glass foundry formerly located into the recently renovated structure.

The Portland Business Journal wrote about the winners of this year’s DeMuro Awards, given by Restore Oregon for excellence in preservation, reuse, and community revitalization. Projects honored in Portland included the Álmr Apartments at NW 21st and Irving; the AltSource Headquarters at 1120 SE Madison St; the Redd on Salmon St; and the Woodlark Hotel.

*This article will be unlocked for the rest of this week. After this week it will only be viewable by DJC subscribers.

Metro Reports: Eleven West, Floor & Decor, 2291 NW Glisan, and more

Eleven West
An excavation and shoring permit is under review for the Eleven West Tower.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers September 16th to September 22nd 2019.

Early Assistance has been requested by Studio 3 Architecture for a project at 5920 E Burnside St:

Remove Existing buildings. Construct 2 new apartment buildings. 62 units total. 4 story with inclusionary housing.

Early Assistance has been requested by Carleton Hart Architecture for Multnomah County’s project at 333 SW Park Ave:

Renovation of an existing, county-owned building for use as a Behavioral Health Resource Center. The building is approximately 24,000 gross square feet, four-and-one-half story structure located on SW Park Ave.

Early Assistance has been requested for a project at 5024 NE Fremont St:

Existing dwelling to be removed and parcel proposed for multi-dwelling unit development for 12 units. Two buildings are proposed with a shared stairway. There is no density requirement in the CM1 zone. Proposed FAR is 1.5

Early Assistance has been requested by William Kaven Architecture for a project at 4047 N Williams Ave:

Two adjacent sites that will be developed under separate ownership, eah with two four-story apartment buildings, one with 17 units and one with 13 units and ground floor retail. Drywell proposed in common courtyard. A separate design review will be needed for each site.

Early Assistance has been requested by Studio 3 Architecture for a project at 8042 N Willamette Blvd:

12 unit apartment building (9,713 GSF) with drywell

Early Assistance has been requested by William Kaven Architecture for a project at 8005 SE 13th Ave:

Construction of one 3-story 19-unit building with ground floor lobby and retail. 60% eco roof coverage is proposed for stormwater.

A Pre-Application Conference has been scheduled by Lance Mueller & Associates Architecture to discuss a project at 55 NE Broadway:

An addition to the existing service shop of Toyota of Portland with structured parking and auto inventory storage over the ground level shop expansion.

A Pre-Application Conference has been scheduled to discuss a Floor & Decor store at 11919 N Jantzen Dr:

A Pre-Application Conference to discuss construction of a new 80,000 square foot building. The proposed tenant is a Retail Sales and Service Use, Floor & Décor, which sells wood flooring and tile to the general public. One hundred four surface parking spaces are proposed. The existing buidling (Safeway) will be demolished.

A Pre-Application Conference has been scheduled by GBD Architects to discuss a project at 1137 NW 23rd Ave:

A Pre-Application Conference to discuss a mixed use building with ground level retail. One level of below grade parking is proposed that takes access from NW Northrup. Approximately 48 parking spaces and one Type B Loading Space are proposed. The retail space is at ground level and is 12,690 square feet in floor area. The upper 4 levels are proposed to have a total of approximately 70 apartments.

An Excavation and Shoring permit is under review for Eleven West at 1102-1116 SW Washington St:

11W – EXC 01- Excavation and Shoring for a New 25 story mixed use building, with 4 below grade floors for parking

A project at 3924 N Montana Ave has been submitted for building permit review:

New 3 story 6 unit apartment building with common lobby, and associated site work including detached trash enclosure under 120 sf mechanical separate

A building permit was issued to Allied Works Architecture for 2291 NW Glisan St (previously 500 NW 23rd Ave):

New construction of 4 story mixed use building, retail on the first floor with associated site work (tenant improvement separate)

A building permit was issued to Studio 3 Architecture for a project at 5311 NE Glisan St (previously 506 NE 53rd Ave):

Construct new 4 story (18) unit apartment building with associated site work and detached trash enclosure under 120sq ft