Metro Reports: Lewis & Clark College Templeton Campus Center, Freewell, 8935 SE Powell, and more

A building permit was issued for renovations and additions to the Lewis & Clark College Templeton Campus Center, designed by ZGF Architects

Metro Reports have moved to Portland Maps Reports. Next Portland covers the highlights of the Early Assistance applications, Land Use Reviews and Building Permits processed each week. This post covers January 17th, 2022 to January 23rd, 2022.

Early Assistance has been requested for a project at 8935 SE Powell St:

The Mental Health & Addiction Association of Oregon (MHAAO), is under contract to purchase the subject property and would like to move their headquarters into the building and investigate the possibility of adding residential development (affordable housing) to the site in the future.

Building permits are under review for a project at 4905 N Vancouver Ave:

PDOX PS – Building A – new 3-story, 11-unit apartment building and associated site work. W/ 21-099882/7/9-CO and 21-099891/2/6-MT

PDOX PS – Building B – new 3-story, 11-unit apartment building and associated site work. W/ 21-099882/7/9-CO and 21-099891/2/6-MT

PDOX PS – Building C – new 3-story, 13-unit apartment building and associated site work. W/ 21-099882/7/9-CO and 21-099891/2/6-MT

A building permit was issued for Freewell (previously known as Con-way Block 291E) at 2030 NW Raleigh St:

FREEWELL – BLOCK 291E – New 7-story apartment building with 192 apartment units, residential amenity spaces, and commercial space attached to new 2-story pavilion building by 2nd level pedestrian bridge; includes one level shared below grade parking and associated site work *** w/20-203695-MT *** 

A building permit was issued for an addition to the Lewis & Clark College Templeton Campus Center at 615 S Palatine Hill Rd:

LEWIS & CLARK COLLEGE – TEMPLETON CAMPUS CENTER – Addition to and renovation of existing student center building: demolish 3,688 sf of existing building and add 8,065 sf to west side of building for new main entrance, meeting rooms, technology lounge, and restrooms; remodel Levels 2 and 3 and add new outdoor covered dining at the north end of the addition *** w/21-064370-MT ***

A building permit was issued for a project at 1311 SW Gibbs St:

PDOX PS – construct new 5 story (27) unit apartment building: 4 story wood framed construction over 1 story concrete structure parking: associated site work w/20-194265-MT

Metro Reports: HollywoodHUB, Freewell, 10413 E Burnside, and more

Freewell (previously known at Con-way Block 291E) has been submitted for building permit review

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers March 1st, 2021 to March 7th, 2021.

Early Assistance has been requested by Jones Architecture for a project East of 208 NE Hancock St:

New 3-story, 18-unit multi-family, micro-unit residential building. Stormwater management TBD

Early Assistance has been requested by TriMet to discuss the HollywoodHUB at 4110 NE Halsey St (current Hollywood Transit Center):

Vacation of NE 42nd Avenue between NE Halsey Street and I-84 Pedestrian Bridge to allow for (i) the construction of new pedestrian/bike access to the Hollywood MAX Station and Laurelhurst neighborhood, (ii) new TriMet and public infrastructure, and (iii) to make the Hollywood Transit Center viable for a new 213-unit affordable housing building. Stormwater treatment will be in dry wells on site with additional bio swales as needed. Detailed project information is included in the attached presentation.

A Pre-Application Conference has been scheduled to discuss a project at 10413 E Burnside St:

We are proposing to build a 225 unit six story (5 wood over 1 concrete) apartment building with one level of underground parking. Units will be restricted to households earning no more than 60% AMI. We are evaluating site conditions for infiltration, if not feasible we will discharge to the public storm system.

A project at 234 NE 61st Ave has been submitted for building permit review:

PDOX PS – Construct new 3 story 15 unit apartment building with associated site work

Freewell at 2030 NW Raleigh St has been submitted for building permit review by SERA Architects:

FREEWELL – BLOCK 291E – New 7-story apartment building with 192 apartment units, residential amenity spaces, and commercial space attached to new 2-story pavilion building by 2nd level pedestrian bridge; includes one level shared below grade parking and associated site work *** w/20-203695-MT ***

Building permits were issued to Studio 3 Architecture for a project with buildings at 5960 and 5980 E Burnside St:

New 4-story 42-unit apartment building with associated site work; no onsite parking; detached trash enclosure < 120 sf; mechanical permit separate for w/19-269743/44-CO

New 4-story 29-unit apartment building with associated site work; no onsite parking; detached trash enclosure < 120 sf; mechanical permit separate for /19-269743/44-CO

A building permit was issued to Stewart Gordon Straus Architect for a project at 278 SW Arthur St:

New 2 story office building, parking lot, site improvements, landscaping, retaining walls.(mechanical separate)

Con-way Block 291E Approved by Design Commission (images)

The Design Commission has approved Con-way Block 291E, a seven-story apartment building. The development, designed by SERA Architects for Cairn Pacific, will include 192 residential apartments units, a small amount of ground floor commercial space, and a two story amenity pavilion. The project will include one level of below-grade vehicular parking, which will also have room for 212 bicycles.

Read More

Metro Reports: 306 SE 8th, 1137 NW 23rd, 2148 NE MLK, and more

306 SE 8th Ave
A proposal for an apartment building at 306 SE 8th Ave, designed by SERA Architects, was approved by the Design Commission in 2017, but never submitted for building permit review. A new Pre-Application Conference for a proposal on the site has been scheduled by the same architecture firm.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers February 24th, 2020 to March 1st, 2020.

Design Advice has been requested by Hennebery Eddy Architects for a project at 539 NW 10th Ave

Project consisting of a new +/-11-story hotel with partial basement on a quarter-block site. The new structure will replace an existing 1-story commercial building. The hotel will contain 150-160 guest rooms with 85,000-90,000 square feet. Loading access is planned along NW Hoyt Street, with a single interior loading bay. No off-street parking is proposed. Ground floor program includes hotel lobby, restaurant, lounge, kitchen, offices, restrooms, mechanical rooms and bike storage. Floors 2-11 will be primarily guest rooms with limited amenity spaces such as fitness room, board room and a roof terrace with bar. Stormwater treatment and detention will be accomplished by way of a vegetated roof.

Design Advice has been requested by SERA Architects for a project at 2250 NW Flanders St

6-story apartment building with approximately186 units in the Northwest Plan District and Alphabet Historic District. Stormwater disposal method TBD.

Design Advice has been requested by SERA Architects for Conway Block 291 East at the SW corner of NW 20th & Raleigh:

7 story market rate apartment building with 180 residential units and basement parking. Stormwater disposal will occur through drywells in the pedestrian way.

A Pre-Application Conference has been scheduled by SERA Architects to discuss a project at 306 SE 8th Ave

New 7 story market-rate apartment building with 113 units and ground floor retail.

Cathedral Village at 8614 N Crawford Street has been submitted for a Pre-Permit Plan Check by MWA Architects:

4-story apartment building with 110 affordable family apartments. The unit mix will be (11) 3-bedrooms, (45) 2-bedrooms, (37) 1-bedrooms, and (17) studios. There will be resident services on the ground floor and 37 parking spaces. There is a basement level at the NW corner of the building that will house bike parking and storage.

A project at 4039, 4047 and 4051 N Williams Ave has been submitted for Type II Design Review by William Kaven Architecture:

Construction of two new 4-story buildings organized around a shared courtyard.

Two new four-story buildings located on N Williams Ave, mid-block between N Mason St and N Shaver St.

New four-story commercial (office) comprised of three stories of office over ground floor retail, office, lobby and tuck-under parking.

A project at 1137 NW 23rd Ave has been submitted for Type III Design Review by GBD Architects:

New mixed use building with ground level retail, 4 levels of apartments above, and 1 level of below grade parking. 74 units.

The new building adjacent to the Troy Laundry at 1010 SE Ash St has been submitted for a Type III Historic Resource Review by Hartshorne Plunkard Architecture:

New 6-story multi-family residential project with two below-grade parking levels.

A project at 236 SE Grand Ave has been submitted for Type III Historic Resource Review by TVA Architects:

New 8-story, 130,000 sq ft office building. One adjustment requested to the loading stall.

The Benson Polytechnic High School Modernization has been submitted for Type III Historic Resource Review by Architectural Resources Group:

Modernization of the existing Benson Polytechnic High School (BPHS) building.

A project at 11 NE 55th Ave has been submitted for building permit review by Fosler Portland Architecture:

Construct new 3 story 16 unit apartment building with associated site work

A project at 5905 N Interstate Ave has been submitted for building permit review by Studio 3 Architecture:

New 3 story, 19 units apartment building with partial retail on ground floor and associated siteworks. Trash enclosure inside.

A project at 8157 N Lombard St has been submitted for building permit review by Mackenzie:

Construction of a 3-story, 8,375 sf multi-family building with eleven (11) units. Ten (10) of these units will be 550 sf and one (1) will be 813 sf.

A project at 6307 N Montana Ave has been submitted for building permit review by Fosler Portland Architecture:

Construct new 3 story 19 unit apartment building with associated site work

A project at 503 SE 29th Ave has been submitted for building permit review:

New 4 story 30 unit apartment building

A project at 6962 N Maryland Ave has been submitted for building permit review:

New 4-story 12-unit apartment with associated site work; w/20-124476-MT

A project at 2148 NE Martin Luther King Jr Blvd has been submitted for building permit review by Ankrom Moisan Architects:

New two-story, 27,595 square foot brick office building with an adjacent surface parking area for ten vehicles

Metro Reports: Westwind Apartments, Las Adelitas, Holden of Pearl, and more

Central City Concern’s redevelopment of the Westwind Apartments in Old Town / Chinatown will result in 100 new units of deeply affordable housing.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers November 4th to November 10th, 2019.

Early Assistance has been requested by Salazar Architect for Las Adelitas at 6723 N Killingsworth St:

141-unit affordable housing building. Ground floor uses include offices, community room, head start classroom, event space courtyard, and plaza. Drywells are proposed for on-site stormwater disposal.

Early Assistance has been requested by Ankrom Moisan Architects for Large Division at 11518 SE Division St:

Large Division will consist of 138 units of affordable housing, serving households at 30% and 60% Area Median Income (“AMI”). Seven (7) units will be set aside for Permanent Supportive Housing (“PSH”) intended to serve homeless households, or at risk of homelessness. The project will consist of studios, one-, two-, and three-bedroom units ranging in size from 416 sf to 1,028 sf.

Early Assistance has been requested by Reilly Signature Homes for a project at SW 18th & Mill St Terrace:

Development of new 4 story condo building with 10 condos, with parking on main level

A Pre-Application Conference has been scheduled by Works Progress Architecture to discuss the redevelopment of the Westwind Apartments at 327 NW 6th Ave:

Construction of a new, 7 story, mixed-use building on a quarter block site. Project includes 70 transient housing units (SROs) with PHB funding, 30 studio apartments and Central City Concern offices and community spaces.

A Pre-Permit Zoning Plan Check has been requested for a project at 6814 N Greenwich Ave:

Two new 3 story multi-family buildings using Community Design Standards. Buildings include basements and L03 mezzanine. Building occupancy is R-2. No off street parking. Stormwater method utilizes on-site drywell.

Conway Block 291E, at the southwest corner of NW Raleigh & 20th, has been submitted for a Type III Design Review by SERA Architects:

Block 219 East will be 6 story market rate apartment building with 200 residential units and basement parking in the Con-Way Master Plan area in the Northwest Plan District.

A project at 3106 SW 12th Ave has been submitted for building permit review by Stewart Gordon Straus Architect:

New 4-story 34 unit apartment building with associated site work; onsite parking ***mechanical permit to be separate***

A building permit is under review for Kilpatrick II at 1408 N Kilpatrick St:

New construction of 18 housing units in a 3-story building on East portion of site. This is buildng 2 of 2. Building 1 was under 18-280322-CO. Utility and grading for entire site was under 18-280322-UTL-01-CO

A building permit is under review for the Holden of Pearl:

review w/ 19-212350-MT New 16 story tower with 3 story podium, courtyard, and 1 below grade level for parking. Building will be a senior living community with 110 units of R-2 occupancy independent senior living, 131 parking stalls in below-grade parking with total GSF of 296,500 with 42,000 of that amount being below-grade parking. Active uses will be provided along 13th Avenue (per 33.510.225).

An excavation and shoring permit was issued to Ankrom Moisan Architects for the Grand Avenue Mixed Use at 465 NE Davis St:

EXC 01 – Excavation and shoring permit

A building permit was issued for a project at 20 NE 60th Ave:

Construct new 4 story 14 unit apartment building with parking on main fl and associated site work

Metro Reports: Hyatt Unbound, Conway Block 291E, New Industrial Revolution Center, and more

3rd & Salmon
A building permit was issued for the Hyatt Unbound hotel at SW 3rd and Salmon.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers September 30th to October 6th 2019.

Early Assistance has been requested by Hennebery Eddy Architects for the New Industrial Revolution Center at 920 SE Stark St:

Proposal is for a ten story tall building with a total area of 312,000 sf, including 220,000 sf of lab space, 28,000 sf of accessory meeting space, 15,000 sf of industrial office, and up to 5,000 sf of retail on the ground floor. Approximately 100 parking stalls will be provided below the ground floor, accessed near the SW corner of 9th and Washington.

Early Assistance has been requested by Carleton Hart Architecture for a project at the northeast corner of NE 42nd & Going:

New construction multi-family affordable housing project on the corner of NE 42nd & Going St

A Pre-Application Conference has been scheduled by SERA Architects to discuss a project at Conway Block 291E at the southwest corner of NW Raleigh & 20th:

6-story market-rate apartment building with 200 residential units and basement parking. Stormwater disposal will occur through drywells in the pedestrian way.

A Pre-Application Conference has been scheduled by Works Progress Architecture to discuss a project at 1835 N Flint Ave:

7-story multi-family building with tuck-under parking, open courtyard, active lobby/amenity and three townhouses at grade and 6 levels of residential above (117 units total). On site stormwater will be dealt with via dry wells.

The Adventist Medical Center at 1500 SE 96th Ave has been submitted for a Type III Design Review by Clark/Kjos Architects:

New four story medical office building.

The skybridge proposed as part of the Terwilliger Plaza Parkview Building at 2436 Southwest 6th Avenue has been submitted for a Type III Review:

Terwilliger Plaza submits this application for one encroachment in the public right-of-way over SW 6th Avenue. The skybridge is an integral element of Terwilliger Plaza’s expanding continuing care facility located on one contiguous site on both sides of SW 6th Avenue. The skybridge will span SW 6th, connecting the existing continuing care facilities on the west of SW 6th Avenue to the expanded facilities and units on the east side of SW 6th Avenue. The skybridge is a critical element of Terwilliger Plaza’s continuing care program.

A project at 5308 SE 18th Ave has been submitted for building permit review by Fosler Portland Architecture:

Construct new 3 story – 16 unit apartment building with attached trash enclosure on south side of building and associated site work to include storm water management

A building permit was issued to SERA Architects for Saltwood South at 2050 NW Raleigh St:

Saltwood South – new construction of 6 story, 177 residential unit apartment building (5 stories of Type IIIA over 1 story of Type 1 construction). There is one level of below grade parking. Ground floor consists of residential lobby, retail space, residential amenities, and dwelling units. The building occupies the full block and is configured around a south-facing private courtyard. Mechanical under 18-278466-MT

A building permit was issued for a project at 6580 N Greenwich Ave:

New 3 story, 12 unit apartment building with attached 138 S.F. Trash enclosure, includes associated sitework *** mechanical permit to be separate ***

A building permit was issued to Ankrom Moisan Architecture for the Hyatt Unbound at 245 SW Salmon St:

New 21 story hotel, 180,000 gross sq ftl with 250 guest rooms, ground floor retail, conference center, gym, groundfloor restaurant, bar/market, support spaces and rooftop restaurant and bar. Total project consists of 21 stories of Type 1 construction with one basement level. For reference set R2 6th floor