Metro Reports: 3000 SE Powell, 4937 SE Woodstock, Going 42, and more

3000 SE Powell
A new Design Advice Request has been scheduled for the Portland Housing Bureau’s development at 3000 SE Powell. The size of the building and the site has increased, relative to what was shown to the Design Commission in July 2019 (pictured).

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers February 10th, 2020 to February 16th, 2020.

Design Advice has been requested by Holst Architecture for 3000 SE Powell:

This is the second design advice request for this Portland Housing Bond project. New multi-family affordable housing building with approximately 210 units. Wood framed construction and all stormwater is maintained on-site.

Early Assistance has been requested for a project at NW 24th Pl and Vaughn:

Develop one lot with a 9-unit multi-family housing building along with associated improvements. Note that they are in the process of having Lots 11-14 confirmed through PR 20-119022 LC

Early Assistance has been requested by Scott Edwards Architecture for a project at 4937 SE Woodstock Blvd:

New 4-story mixed-use building with about 1,800sf of ground floor retail space facing Woodstock Blvd. and 87 rental dwellings on all floors consisting of studio, 1-bed, 2-bed and 3-bed units. 1 loading space will be provided on site with access from Woodstock. Storm water to be accommodated with a combination of dry-wells, landscape and if necessary, eco-roofs.

Early Assistance has been requested by MWA Architecture for a project at 12529 SE Powell Blvd:

New construction of approximately 165 affordable, multi-family apartments ranging in size between one-bedroom and three-bedroom. Development will include resident community room and support spaces along with site utilities, waste/recycling, auto parking, bike parking, and play area.

A Pre-Application Conference has been scheduled to discuss a project at 2321 SE 89th Ave:

New (3) fourplexes apartment to create a total 13 units on the lot.

A Pre-Application Conference has been scheduled by Hennebery Eddy Architects to discuss a project at 539 NW 10th Ave:

A Pre-Application Conference to discuss construction of a new 11-story hotel. The hotel will contain 150-160 guest rooms with 85,000-90,000 square feet of floor area. Loading access is proposed from NW Hoyt St with a single interior loading bay. No off-street parking is proposed.

The Going 42 Apartments have been submitted for building permit review by Carleton Hart Architecture:

New 56-unit apartment building with associated site work w/20-118735-MT

A project at 456 NE Beech St has been submitted for building permit review by Allusa Architecture:

New 3 story hotel with ground floor office, laundry, and trash room

A building permit was issued for a project at 6833 N Montana Ave (previously 6829 N Montana Ave):

New two-story, 6 unit apartment building including site work, utilities, and trash enclosure (less than 120 sf). No on-site parking. ***mechanical separate***

A building permit was issued to EMA Architecture for a project at 11025 NE Sandy Blvd:

Construct new one story building to include; multi purpose room, mechanical room, three new restrooms; and kitchen; ecoroof; exterior new patio on north side of building new play field and associated site work to include; reconfigure existing parking; new walkway; widen existing driveway on north side; close driveway on se corner and reconfigure landscaping ***mural and solar array under separate permits***

Metro Reports: Hyatt Unbound, Conway Block 291E, New Industrial Revolution Center, and more

3rd & Salmon
A building permit was issued for the Hyatt Unbound hotel at SW 3rd and Salmon.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers September 30th to October 6th 2019.

Early Assistance has been requested by Hennebery Eddy Architects for the New Industrial Revolution Center at 920 SE Stark St:

Proposal is for a ten story tall building with a total area of 312,000 sf, including 220,000 sf of lab space, 28,000 sf of accessory meeting space, 15,000 sf of industrial office, and up to 5,000 sf of retail on the ground floor. Approximately 100 parking stalls will be provided below the ground floor, accessed near the SW corner of 9th and Washington.

Early Assistance has been requested by Carleton Hart Architecture for a project at the northeast corner of NE 42nd & Going:

New construction multi-family affordable housing project on the corner of NE 42nd & Going St

A Pre-Application Conference has been scheduled by SERA Architects to discuss a project at Conway Block 291E at the southwest corner of NW Raleigh & 20th:

6-story market-rate apartment building with 200 residential units and basement parking. Stormwater disposal will occur through drywells in the pedestrian way.

A Pre-Application Conference has been scheduled by Works Progress Architecture to discuss a project at 1835 N Flint Ave:

7-story multi-family building with tuck-under parking, open courtyard, active lobby/amenity and three townhouses at grade and 6 levels of residential above (117 units total). On site stormwater will be dealt with via dry wells.

The Adventist Medical Center at 1500 SE 96th Ave has been submitted for a Type III Design Review by Clark/Kjos Architects:

New four story medical office building.

The skybridge proposed as part of the Terwilliger Plaza Parkview Building at 2436 Southwest 6th Avenue has been submitted for a Type III Review:

Terwilliger Plaza submits this application for one encroachment in the public right-of-way over SW 6th Avenue. The skybridge is an integral element of Terwilliger Plaza’s expanding continuing care facility located on one contiguous site on both sides of SW 6th Avenue. The skybridge will span SW 6th, connecting the existing continuing care facilities on the west of SW 6th Avenue to the expanded facilities and units on the east side of SW 6th Avenue. The skybridge is a critical element of Terwilliger Plaza’s continuing care program.

A project at 5308 SE 18th Ave has been submitted for building permit review by Fosler Portland Architecture:

Construct new 3 story – 16 unit apartment building with attached trash enclosure on south side of building and associated site work to include storm water management

A building permit was issued to SERA Architects for Saltwood South at 2050 NW Raleigh St:

Saltwood South – new construction of 6 story, 177 residential unit apartment building (5 stories of Type IIIA over 1 story of Type 1 construction). There is one level of below grade parking. Ground floor consists of residential lobby, retail space, residential amenities, and dwelling units. The building occupies the full block and is configured around a south-facing private courtyard. Mechanical under 18-278466-MT

A building permit was issued for a project at 6580 N Greenwich Ave:

New 3 story, 12 unit apartment building with attached 138 S.F. Trash enclosure, includes associated sitework *** mechanical permit to be separate ***

A building permit was issued to Ankrom Moisan Architecture for the Hyatt Unbound at 245 SW Salmon St:

New 21 story hotel, 180,000 gross sq ftl with 250 guest rooms, ground floor retail, conference center, gym, groundfloor restaurant, bar/market, support spaces and rooftop restaurant and bar. Total project consists of 21 stories of Type 1 construction with one basement level. For reference set R2 6th floor