Metro Reports: Dekum Court, The Bluffs, 19th & Pettygrove, and more

The redevelopment of Dekum Court is being part funded by the 2018 regional housing bond. The new Dekum Court include 200 units of affordable housing, an increase of 160 units.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers June 15th, 2020 to June 21st, 2020.

Early Assistance has been requested by Home Forward for the redevelopment of Dekum Court at 7003 NE 27th Ave:

The project is the phased redevelopment of the Dekum Court affordable housing development. Currently Dekum Court has 40 units of housing on 5.3 acres of land. Phase 1 of the project will be to demolish the existing Head Start building and construct a minimum of 40 new apartment homes. Phase 2 of the project will be to move current residents into the new units, demolish all remaining structures on site and construct up to 160 additional units for a total of 200 units of housing.

A project at NW 24th Pl and Vaughn has been submitted for a Pre-Permit Plan Check:

19 multi-family units. A lot confirmation was recently completed (see PR 20-119022 LC)

Alterations to the Galleria at 600 SW 10th Ave have been submitted for a Type 1x Historic Resource Review:

The existing Target retail store that is currently located on the second and third floors of the building will be relocated and consolidated on the first floor of the building with minimal exterior alterations. Those exterior alterations include repurposing of existing blade signage, the addition of new signage, attaching new canvas to existing awnings, and installation of a small LTE antenna (as further described below, the ¿Project¿). Beyond the signage and awnings, the alterations affect less than 500 square feet of exterior façade. Based on the proposed changes, the Bureau of Development Services has confirmed that these Historic Resource Reviews are to be processed with a Type Ix procedure under PCC 33.846.060, Table 846-1 and PCC 33.730.042 (Concurrent Reviews).

A project with two buildings at 5736 N Greeley Ave has been submitted for a building permit review:

PDOX PS – Building I: new 13 unit 3 story apartment building w/associated site work; no onsite parking; w/20-152864-CO (building II) 20-152869-CO (trash enclosure) 20-152876/79-MT

PDOX PS – Building ii: new 13 unit 3 story apartment building w/associated site work; no onsite parking; w/20-152862-CO (building I) 20-152869-CO (trash enclosure) 20-152876/79-MT

The 19th & Pettygrove Apartments at 1339 NW 19th Ave have been submitted for building permit review:

New 7 story, 126 unit mixed use apartment building and associated site work W/20-148905-MT

A building permit was issued to Studio 3 Architecture for The Bluffs at 5150 N Lombard St:

New 4 story, 36 unit apartment building with (2) tenant spaces on ground floor, includes associated sitework *** mechanical permit to be separate ***

A building permit was issued for a project at 5111 SE Woodstock Blvd:

New 3-story, 28-unit apartment building with interior trash enclosure, bike storage room and short-term bicycle parking.

Metro Reports: Pearl Building East, Atomic Orchard, Society RCP, and more

A building permit is under review for the Atomic Orchard on NE Sandy Blvd.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers November 18th to November 24th, 2019.

A Pre-Application Conference has been scheduled by TVA Architects to discuss a project at 2997 SW Moody Ave:

New mixed-use project in two buildings, with residential units above ground floor retail and at-grade level parking. The construction is 5 levels of 3B over 2 levels of 1A on one of the buildings, and the construction is 10 levels of 1A on the other building. Stormwater management to be determined.

The Atomic Orchard at 2510 NE Sandy Blvd has been submitted for building permit review by Brett Schulz Architect:

New 5 story 49-unit multifamily apartment building with ground floor retail and one accessible dwelling unit in attached ground floor annex building, includes associated site work *** w/19-193113-MT ***

The Modera Woodstock at 4804 SE Woodstock Blvd has been submitted for building permit review by Leeb Architects:

MODERA WOODSTOCK – New 5-story, 194 unit apartment building with one level below-grade parking and ground floor commercial spaces; includes associated sitework *** w/19-247370-MT ***

A project at 14507 E Burnside St has been submitted for building permit review by Doug Circosta Architect:

New 3 story 22 unit apartment building with office and common laundry room

New 3 story 24 unit apartment building with associated site work

A project at 115 N Going St has been submitted for building permit review by Urban Development Group:

New 3-story 6-unit apartment building with associated site work. Detached trash enclosure < 120sf ***mechanical permit separate***

A project at 5105 SE Woodstock Blvd has been submitted for building permit review:

New 3-story, 28-unit apartment building with interior trash enclosure, bike storage room and short-term bicycle parking.

The Society RCP apartments at 1435 NE 62nd Ave have been submitted for building permit review by Koble Creative Architecture:

New 3-story, 3-unit apartment building, including interior trash, associated sitework and on-site stormwater management.

The Pearl Building East has been submitted for building permit review:

New 7-story mixed use high-rise office building with three levels of underground parking garage and a penthouse amenity space *** w/19-237841-MT ***

Building permits were issued for a project at 408 SE 105th Ave:

Building 1 of 3 new apartment buildings, two stories with two units (see comments), includes associated site work *** 18-270002/04-CO & 18-280941/44/45-MT ***

Building 2 of 3 new apartment buildings, three stories with six units, includes associated site work *** w/18-269978-CO & 18-270004-CO & 18-280941/44/45-MT ***

Building 3 of 3 new apartment buildings, three stories with five units and community room, includes associated site work *** w/18-269978-CO & 18-270002-CO & 18-280941/44/45-MT ***

Metro Reports: Tacoma Commons, Nomad, NW 20th & Savier, and more

The Tacoma Commons include four buildings, each with three residential units.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers May 27th to June 3rd, 2019.

Early Assistance has been requested for a project at 5105 SE Woodstock Blvd:

Construct a 27 unit apartment building.

Early Assistance has been requested by Scott Edward Architecture for a project at 7601 SE Division St:

Four or five story multi-family building consisting entirely of affordable housing (approximately 118-130 units)

Early Assistance has been requested for a project at the southeast corner of NW 20th & Savier:

Discuss the feasibility, needed analysis and evidence to amend the Conway Master Plan (LU 12-135162), as applied to Blocks 16, 261, and 262, to allow a hotel. No change to Master Plan-wide FAR cap or existing height limits proposed.

A Pre-Application Conference has been scheduled by EPR Design to discuss a project East of 12395 SW Clara Ln:

Proposal to construct a new 60-90 bed residential care facility licensed by the State of Oregon for 24-Hour Care. The residents will not be driving or own cars that are parked at the site. There will be one common kitchen and one common dining area. No kitchens provided in the resident rooms. The resident rooms will consist of a sleeping area and a private 1/2 bath. Onsite parking is proposed, a trash enclosure and associated site work and landscaping.

A Pre-Application Conference has been scheduled by DAO Architecture to discuss a project at 2171 NW Glisan St:

Two proposed 3-story affordable multi-family buildings (one with basement), focused on providing compact apartments/residences for single moms. Project includes (13) 2-BR units (including 1 ADA-accessible unit) and 600 sq ft day care on basement level. Non-contributing

A Pre-Application Conference has been scheduled by Lever Architecture to discuss the renovation of the Artists Repertory Theater at 1515 SW Morrison St:

Renovation of the existing 18,000sf Artist Repertory Theater (ART) building. The renovation will add new theater, rehearsal, office and support space for ART and a dozen affiliated companies in the ART HUB. The expansion will add a partial second floor and increase the total area to approximately 28,000sf. The existing concrete exterior walls and the east and west bays of existing structure will remain. The central portion of the building will be rebuilt with a higher structure to accommodate a large theater and second floor. The existing covered drive will be infilled with a new main entry and lobby space. The two levels of parking below the main floor will remain. Parking Level 1 will be accessed from an entry in the building along SW 15th Avenue. Parking Level 2 will be accessed from a new entry in the future ART Tower. The building will undergo a full seismic upgrade. Given the existing conditions, the project has limited stormwater options. The project team will review with BES

Buildings permit were issued to Works Progress Architecture for the Tacoma Commons at 2000 SE Tacoma St:

New three-story, three unit mult-family structure (1 of 4, with 17-194721,-24,-27 CO ) includes site utilities

New three-story, three unit mult-family structure (2 of 4, with 17-194710,-24,-27 CO )

New three-story, three unit mult-family structure with trash enclosure. (3 of 4, with 17-194710,-721,-727 CO )

New three-story, three unit mult-family structure (4 of 4, with 17-194710,-721,-724 CO)

A building permit was issued to R & B Design Studio for a Habitat for Humanity project at 8120 N Interstate Ave:

Building 1 of 2, to be built on west portion of site. Review with 18-280327-MT (HVAC for building). Three story with partial 4th story, 12 affordable housing units. Entire site Grading and Utility permit 18-280322-UTL-01-CO be reviewed concurrently. Permit for 2nd building to come in after this CO and UTL both issued.

A building permit was issued to Works Progress Architecture for Nomad at 5620 N Interstate Ave:

New construction of 7-story Mixed-Use Building; 2-stories C.I.P. Post-tensioned Concrete Slabs and Columns, 5-stories wood-frame. 6 levels of Residential Units with Amenity over 1 Level of Residential Amenity and Retail. Work to the Retail will be included as part of this Permit. The Overall Buillding Height is less than 75ft.