Metro Reports: Benson High School, Restoration Hardware, Holladay Park Plaza East and more

19th & Quimby

A building permit is under review for the 19th & Quimby apartments

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

SERA Architects have requested Design Advice for a project at 905 NW 17th Ave:

Type III Design Review for a new 6-8 story mixed use building with 140-190 residential units, ground floor retail and below grade parking – approximately 70 spaces.

Scott Edwards Architecture have requested Early Assistance for a project at 5045 SE Foster Rd:

Proposal is to construct a new four story mixed used building with ground floor retail and three levels of residential apartments. On-site parking of 15 stalls will be included.

Encore Architects have requested Early Assistance for a project at 20 NE 14th Ave:

New 6 story multi use 190 unit apartment building, retail and living on the 1st floor, 100 parking spaces provided.

Early Assistance has been requested for a project at 14601 SE Division St :

Demo existing resteraunt – new construction of Fred Meyer gas station with 6 dispensers, 12 fueling stations with small cashier kiosk, propane tank, air/water station, restroom/breakroom building and trash enclosure

DOWA-IBI Group have requested Early Assistance for work at Benson High School:

Master planning for modernization and addition of the existing Benson Polytech High School Campus.

A building permit is under review for NW 19th & Quimby:

New 6 story apartment bldg. w/ 88 units. PT podium with 5 stories wood frame construction above w/ on grade parking.

A building permit is under review for a project at 664 SW Grant St :

Construct new 3 story, 5 unit apartment building, no parking, includes associated site work, sloped lot

CIDA Architects have applied for a building permit for a project at 422 NE Dekum St :

Construct new 4 story, 22 unit apartment builidng, one unit is live/work, no parking, trash and bike storage at main level, includes associated site work

A building permit is under review for a project at N Failing & Vancouver:

Construct new 5 story mixed use building with below grade parking, main floor retail and 4 levels of 50 apartment units, eco-roof, includes associated site work

A building permit is under review for a project at 8636 SE 17th Ave:

Construct new 2 story mixed use building; main floor to include two tenant spaces; proposed tenant b space to be used as daycare; tenant a (no occupancy this permit) second fl to include (4) apartment units

A building permit is under review for Holladay Park Plaza East at 1300 NE 16th Ave:

New 2 story above grade 10 unit adult living apartments with 2 levels of underground parking

Ankrom Moisan Architects have submitted the new Restoration Hardware at NW 23rd & Glisan for building permit review:

New 3 story construction with basement parking garage and additional rooftop story comprising stair enclosure, open air pavilion and trellis structure

Metro Reports: St Francis Park Apartments, PSU School of Business Administration, 4th & Harrison and more

4th & Harrison

4th & Harrison, as presented at Design Advice

Every week, the Bureau of Development Services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

Barry Smith Architect has requested Early Assistance for a project at 518 SE 76th Ave:

46 unit apartment building with 8 cars in parking garage; 4 floors

BAMA Architecture and Design have requested Early Assistance for a project at 10010 SE Ankeny St:

Lot line adjustment and phased development of multiple buildings to include multi-family, parking, industrial flex space.

Solterra have requested Early Assistance for a project at N Failing & Vancouver:

53-unit mixed use apartment building with active urban canyon

Works Partnership have requested Early Assistance for a project at 1400 NW 22nd Ave:

Proposal for major commercial alterations with exterior improvements. Uses will include office, retail and manufacturing.

Barry Smith Architect has requested Early Assistance for a project at 829 NW 19th Ave:

Move existing home on property to within 20 feet of NW 19th. Confirm and adjust lot lines for 2 lots. On Vacant lot develop a 50 unit, 6 story apartment building located within the Alphabet Historic District.

Mortenson Development have scheduled a Pre-Application Conference to discuss a new hotel at 619 SW 11th Ave:

demolish existing 1/4 block building and replace with a new construction 221 room, 15 floor hotel.

A Design Review has been submitted for a project at 1112 SE Lincoln St:

Construction of 2 tri-plex residential structures – one on each parcel

The St Francis Park Apartments by MWA Architects have been submitted for Design Review:

New 106-unit multi-dwelling residential development.

The 4th & Harrison apartment complex by Core Spaces has been submitted for Design Review:

Design Review for new 15-story glass and metal panel building – grocery store at ground level and 14 stories of luxury residential apartments, above. 1 modification requested to reduce landscape area; 1 modification requested to replace landscaping with hardscape; 1 modification requested for the width of the oriel window; 1 adjustment requested to parking access & loading; 1 adjustment requested for # of parking stalls.

ZGF Architects have submitted the Canopy Hotel for Design Review:

11 Story, 150 room Hotel

SRG Partnership have applied for building permits for the PSU School of Business Administration:

40,000 Sf multi-story addition, renovation of 52,000SF existing

Reroute on site utilities, demo on site portion of sky bridge, remove exerior cladding of existing building, interior demolition. ***40,000 SF multi-story addition, renovation of 52,000SF existing***

foundation and walls to grade of pavilion/atrium, cladding of existing building, ***40,000 SF multi-story addition, renovation of 52,000SF existing***

Demolition permits were issued for the existing buildings due to be replaced by the Pearl Hampton Inn & Suites:

Demo existing 2 story building

Demo two story building; no basement

Demo existing 3 story building with partial basement

A building permit was issued for the Kenton Mixed Use Phase III at 2111 N Willis Blvd:

New four story apartment building with courtyard and balcony at center, 37 units, 2 retail spaces on main floor, parking at east and north sides, detached trash enclosure, associated landscaping and stormwater facilities

A building permit was issued to Anrkom Moisan Architects for 2010 NW Pettygrove St:

new 5-story, 49 unit apartment with tucked under parking