Metro Reports: Saltwood, Multnomah County Courthouse Re-Use, Landing at Macadam, and more

The adaptive reuse of the historic Multnomah County Courthouse into ground-floor retail with office above will include a seismic upgrade, the re-introduction of pedestrian entry on SW 5th, a new accessible entry on SW Main and new window openings at the existing penthouse.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers August 5th to August 12th 2019.

Design Advice has been requested by Alamo Manhattan for The Landing at Macadam:

DESIGN HEARING – Project including four separate mixed-use multifamily structures with approximately 1,200 multifamily units, ground floor retail and parking uses. Blocks 41 & 44 (along the river) will be high rises and Blocks 42 & 45 (along Bond) will be mid-rises. The project will also include greenway improvements and infrastructure.

Design Advice has been requested by Emerick Architects for a project at 2124 NW Flanders St:

Four stories of market-rate apartments over a walk-out basement level with 19 residential units and typical utilities. Floors 01-04 are proposed to have outdoor balcony space. The roof is anticipated to incorporate a roof deck and solar panels. The project has no parking. The stormwater disposal method to be on-site storm water planters & drywells.

Design Advice has been requested by GBD Architects for the Multnomah County Courthouse Re-Use:

Renovation and seismic upgrade of historic courthouse for adaptive reuse.

Early Assistance has been requested by MAJ Development for a project west of 8157 N Lombard St:

Construct new apartment building, 12 units. Relocate stormwater facilities which serve neighboring lots. Community Design Standards.

Early Assistance has been requested by Robert Mosier Architect for a project at 724 NE Lombard St:

The proposed project is to redevelop several adjacent lots into additional facilities for current ceramics business. The 724 NE Lombard site is proposed as a retail use – ceramics classrooms / workshop space. The 940 NE Lombard site is proposed as a new manufacturing building to support wholesale clay products portion of the business. It is anticipated that storm water planters will be used to pre-treat site storm water.

Early Assistance has been requested for a project at 6607 N Montana Ave:

Demo Existing, build new 18 unit

A project at 3733 N Williams Ave has been submitted for a Type II Design Review by William Kaven Architecture:

New mixed-use residential development consisting of two new 4-story buildings. They are organized around a shared courtyard. The east building, fronting N Williams Ave, is comprised of 3-stories of residential apartments over ground floor retail,and one residential unit. The west building, fronting the alley, is comprised of four stories of residential apartments. All residential units are accessed from the courtyard via N Williams, with a pedestrian path linking the courtyard and entry gate. The project proposes a mix of 12 studio and 18 one-bedroom apartments (for a total of 30 apartment units). The west building contains 17 units and the east building contains 13 units and one retail space. Modification requested to pedestrian standards, connection between streets and entrances (33.130.240.B.1.a); and a Modification is requested to transit street multi-dwelling main entrance location (33.130.242.C).

The Dairy Apartments at 801 NE 21st Ave have been submitted for a Type III Design Review by Hacker Architects:

The project is a new construction 7-story ((5) Type IIIA over (2) Type IA) multi-family residential building over 1 of below grade parking level. Total building will be 196,481 gross sf, 270 units, plus residential amenties. Inclusionary Housing will be triggered and provided on-site at standard rates. 2 Modifications are requested and an Adjustment for the minimum parking requirement.

A project west of 2247 NW Kearney St has been submitted for a Type III Design Review by Osterman Design:

New 16-unit apartment building. It will be three stories plus basement and will include apartment types ranging from studios to 2-bedroom units. No commercial uses are proposed.

A building permit was issued to Fosler Portland Architecture for a project at 4130 NE Garfield Ave:

New 12 unit 2 story apartment building, includes trash room and associated sitework.

A building permit was issued to SERA Architects for Saltwood North at 1650 NW 21st Ave:

Saltwood – new construction of 177 unit, 6 story apartment building (5 stories of Type 111A over 1 story of Type 1 construction). With two levels of below grade parking. Ground floor consists of residential lobby, retail space, residential amenities, dwelling units, and a loading area. The building occupies the full block and is configured around a south-facing private courtyard. Mechanical work under 18-278422-MT

A building permit was issued for the Meyer Memorial Trust Headquarters at 2045 N Vancouver Ave:

New construction of 3 story office building and associated sitework

Metro Reports: Kellogg Middle School, Benson Polytechnic High School, NW Natural Response / Service Center, and more

A building permit was issued for the new Kellogg Middle School at SE 69th & Powell.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers July 8th to July 14th 2019.

Design Advice has been requested for the Benson Polytechnic High School Modernization Project:

Benson Polytechnic High School Modernization Project

Early Assistance has been requested for a project at 1435 NE 62nd Ave:

New 2-3 story residential building for household living with multiple dwelling units (approximately 5 units). Existing SFR and accessory structure will be demolished.

Early Assistance has been requested for a project at SW 37th and Capitol Highway:

Community Design Standards being used for new 5700 sf mixed use building with 6, 2bd, 2ba units and 700 sf of retail/office space. Building to be 2 stories on one half aand 3 on the other Stormwater to be disposed of on site with stormwater planters.

Early Assistance has been requested by LRS Architects for phase II of the NW Natural Response / Service Center at 904 SE Division St:

Phase II. Scope of work is for a new NW Natural Response / Service Center facility not open to visitors. The project site is approximately 4.35 acres. Approximately 2.85 acres are currently being developed under Phase I (North portion of site). Phase 1 is currently under review for building permit. Approximately 1.5 acres are in the planning stages, Phase II (South portion of site). Phase II consists of a single story fleet garage and 1 story community relations storage building. Including on-site work and public street improvements for the NWN facilities, parking lot design and on-site sand filtration system for stormwater management.

Early Assistance has been requested by Works Progress Architecture for a project at 1642 NE Sandy Blvd:

Construction of a new 4-story hotel with lobby and commercial space on ground floor. Existing single story building to partially remain and new build will be constructed above and adjacent. Stormwater will be managed on site.

Early Assistance has been requested for a project at 1840 SW Main St:

Consolidate two parcels and construct a new multi-unit residential building preserving existing homes (less than 20 units).

A Pre Application Conference has been scheduled by Osterman Design to discuss a project West of 2247 NW Kearney St:

New construction of a 16-unit apartment building.

A project at 1336 N Watts St has been submitted for building permit review:

New 3-story 14 Unit Apartment Building ***mechanical Permit Separate***

A project at 6829 N Montana Ave has been submitted for building permit review by DEZ Development:

New two-story, 6 unit apartment building including site work, utilities, and trash enclosure (less than 120 sf). No on-site parking. ***mechanical separate***

A building permit was issued for a project at 1825 NE 108th Ave:

Addition to existing building for new tv room, crafts room, library, conference room, and chaplain room; convert unit to dining room; include associated site work. Cesspool decommissioning required.

A building permit was issued for a project at 7122 N Greenwich Ave:

New 3 story, 12 unit apartment building with attached 138 s.F. Trash enclosure, includes associated sitework *** mechanical permit to be separate ***

A building permit was issued to Deca, Inc for a project at 116 NE 16th Ave:

New 4 story plus basement, 33 unit apartment building with associated site work and covered parking

A building permit was issued to Works Progress Architecture for a project at 5510 N Denver Ave (previously 1935 N Killingsworth St):

New 4 story mixed use building with ground floor tenant spaces and 36 residential units on floors 2-4. No occupancy for ground floor tenant spaces – future TI permits required *** mechanical permit separate ***

A building permit was issued to Wynn Design for a project at 9757 SE Holgate Blvd:

New 12 unit multi-family, 3 story apartment. 6 dwelling units attached with a breezeway to 6 dwelling units, no onsite parking, includes associated sitework *** elec, plum, mech, fs, separate permits. Fa steel guardrails, steel stairs and security deferred submittals***; <120 sq ft detached trash enclosure

A building permit was issued to Oh Planning and Design for the Kellogg Middle School at 3400 SE 69th Ave:

KELLOGG MIDDLE SCHOOL – New 100,000 sf, three story to include community and partner organization spaces with covered play area, play field, parkling lot, bus drop-off and emergency vehicle access road

Metro Reports: 1638 W Burnside, OHSU Elk’s Children Eye Clinic, 2626 SE 122nd, and more

1638 W Burnside

A building permit is under review for Ankrom Moisan’s 1638 W Burnside St

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. (Note: this post covers August 28th to September 3rd, 2017.)

Design Advice has been requested for the OHSU Elk’s Children Eye Clinic:

New 5-story building (with rooftop mechanical penthouse) for the Elk’s Children Eye Clinic for OHSU. The project also includes an enclosed pedestrian bridge and a below-grade tunnel connection to the existing facility.

Design Advice has been requested by Osterman Design for a project West of 2247 NW Kearney St:

New apartment building, 18 units

Early Assistance has been requested by LRS Architects to discuss a project at 5800 NE Center Commons Way:

Current code – New exterior windows and exterior envelope (skin) over existing five story low income senior apartment 1999 building.

Early Assistance has been requested by EPR Design to discuss a project at 1610 N Willis Blvd:

Current code: Project is to construct a 12 unit apartment building on each site. Sites will not be consolidated and will be under same ownership soon. No parking will be provided; common bike parking and trash area is proposed within the buildings.

Early Assistance has been requested by William Wilson Architects to discuss a project at 1640 NW Irving St:

Current Code – seismic upgrade, 3,000 sf second floor penthouse addition for a contributing structure in Alphabet Historic District.

Early Assistance has been requested for a project at 6324 NE Glisan St:

Current code: Proposal is to build a 3-story residential building with a mix of 9 units (3-two bedroom units & 6-one bedroom units). Existing duplex to remain.

1638 W Burnside St has been submitted for building permit review by Ankrom Moisan Architects:

STR 01 – Concrete structure from foundations to top of level 4, utilities under level P2 level slab and below ground waterproofing

A project at 2626 SE 122nd Ave has been submitted for building permit review by Studio 3 Architecture:

Construct new 1 story building for new restaurant with associated site work

The parking garage adjacent to the Convention Center Hotel has been submitted for building permit review:

New 7 story parking garage with ground floor commercial space.

A building permit was issued to William Wilson Architects for a project at 1630 SE Rural St (formerly 7119 SE Milwaukie St):

New 4-story wood framed mixed use building including 232 unit apartment building with basement garage, and site improvement, interior trash room, shell commercial space(potential future restaurant)

A building permit was issued for a project at 685 SE Division Pl (previously 627 SE Division Pl):

New 4-story 126,820 sf self-storage facility, site improvements

Metro Reports: Block 45, 2260 NW Front, Gateway Baptist Church, and more

Lever Architecture’s Block 45 has been submitted for building permit review

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Early Assistance has been requested by Courtney + Le Architects for a project at 520 SE 82nd Ave:

Current code – The project entails demolishing the existing 14,243 sf building & constructing a 20,053 sf market. Stormwater disposal will be dispersed to the adjacent landscape planters/bio filters.

Early Assistance has been requested by Allusa Architecture for a project at 1823 NE 2nd Ave:

Current code – Construction of a two story 8 unit apartment building. Stormwater to be diverted to an onsite drywell. Trash and long term bike parking is located along the east portion of the property.

Early Assistance has been requested for a project at 2260 NW Front Ave:

He would like info on both current code and future code.

Please note that this “site” is for the pier which is approx 375′ NE from the parcel this case is “built” on (the parking lot parcel: R540254).Convert existing pier (formally part of “Terminal 1”) into a terminal for river-related activities: floating hotel, watersports, seaplane terminal, spa, park, farmers’ market, and/or other amenities beneficial to adjacent condos and apartment buildings. Parking provided by adjacent parking lot, accessed by greenway trail. They propose to bring in a floating vessel to use for above-proposed activities. (Central City Design District. Central City – River – North Pearl Plan District, Guild’s Lake Industrial Sanctuary).

A Pre-Application Conference has been scheduled by Osterman Design to discuss a project West of 2247 NW Kearney St:

Develop multi-family apartments – 18 units planned. Two car garage. Site is a non-contributing structure in Alphabet Historic District.

A Pre-Application Conference has been scheduled by Myhre Group Architects to discuss an addition to Gateway Baptist Church at 13300 NE San Rafael St:

A Pre-Application Conference to discuss an addtion to a church. 2,862 square feet of floor area will be added to the existing 6,814 square foot main church building .The number of parking spaces will be reduced from 171 to 168. The size of the church sanctuary will not be increased and can accomodate 200 people. The fellowhship hall and day care buildings are not expanding.

A Pre-Application Conference has been scheduled to discuss a project at NE 133rd & Burnside St:

Current code – Looking to create a Net Zero neighborhood community with 37 to 40 units that will have a mix of detached and attached units. Connected greenspaces will be thoughtfuly provided for children to play and community gardens for neighborly connections. Two plans submitted and plans include the following assumptions water, storm, and sanitary sewer connections.

A Pre-Application Conference has been scheduled to discuss a project at 2855 SW Patton Rd:

Review is for 2018 code changes. Remove the grocery-only condition and redevelop the site with an economically viable use that is compatible with the neighborhood (CM1 zone).

A building permit is under review for a project at NW 24th & Raleigh:

New 3 story apartment building with below grade parking.

A building permit is under review for Block 45 at 1034 NE Grand Ave:

New 12-story mixed use building; 240 apartment units with ground floor retail; basement for bike parking

A building permit was issued to Deca, Inc for a project at 1714 NE 45th Ave:

New 3 story apartment building with basement (8 units) and associated site work; includes retaining wall; trash room inside