Metro Reports: Kellogg Middle School, Benson Polytechnic High School, NW Natural Response / Service Center, and more

A building permit was issued for the new Kellogg Middle School at SE 69th & Powell.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers July 8th to July 14th 2019.

Design Advice has been requested for the Benson Polytechnic High School Modernization Project:

Benson Polytechnic High School Modernization Project

Early Assistance has been requested for a project at 1435 NE 62nd Ave:

New 2-3 story residential building for household living with multiple dwelling units (approximately 5 units). Existing SFR and accessory structure will be demolished.

Early Assistance has been requested for a project at SW 37th and Capitol Highway:

Community Design Standards being used for new 5700 sf mixed use building with 6, 2bd, 2ba units and 700 sf of retail/office space. Building to be 2 stories on one half aand 3 on the other Stormwater to be disposed of on site with stormwater planters.

Early Assistance has been requested by LRS Architects for phase II of the NW Natural Response / Service Center at 904 SE Division St:

Phase II. Scope of work is for a new NW Natural Response / Service Center facility not open to visitors. The project site is approximately 4.35 acres. Approximately 2.85 acres are currently being developed under Phase I (North portion of site). Phase 1 is currently under review for building permit. Approximately 1.5 acres are in the planning stages, Phase II (South portion of site). Phase II consists of a single story fleet garage and 1 story community relations storage building. Including on-site work and public street improvements for the NWN facilities, parking lot design and on-site sand filtration system for stormwater management.

Early Assistance has been requested by Works Progress Architecture for a project at 1642 NE Sandy Blvd:

Construction of a new 4-story hotel with lobby and commercial space on ground floor. Existing single story building to partially remain and new build will be constructed above and adjacent. Stormwater will be managed on site.

Early Assistance has been requested for a project at 1840 SW Main St:

Consolidate two parcels and construct a new multi-unit residential building preserving existing homes (less than 20 units).

A Pre Application Conference has been scheduled by Osterman Design to discuss a project West of 2247 NW Kearney St:

New construction of a 16-unit apartment building.

A project at 1336 N Watts St has been submitted for building permit review:

New 3-story 14 Unit Apartment Building ***mechanical Permit Separate***

A project at 6829 N Montana Ave has been submitted for building permit review by DEZ Development:

New two-story, 6 unit apartment building including site work, utilities, and trash enclosure (less than 120 sf). No on-site parking. ***mechanical separate***

A building permit was issued for a project at 1825 NE 108th Ave:

Addition to existing building for new tv room, crafts room, library, conference room, and chaplain room; convert unit to dining room; include associated site work. Cesspool decommissioning required.

A building permit was issued for a project at 7122 N Greenwich Ave:

New 3 story, 12 unit apartment building with attached 138 s.F. Trash enclosure, includes associated sitework *** mechanical permit to be separate ***

A building permit was issued to Deca, Inc for a project at 116 NE 16th Ave:

New 4 story plus basement, 33 unit apartment building with associated site work and covered parking

A building permit was issued to Works Progress Architecture for a project at 5510 N Denver Ave (previously 1935 N Killingsworth St):

New 4 story mixed use building with ground floor tenant spaces and 36 residential units on floors 2-4. No occupancy for ground floor tenant spaces – future TI permits required *** mechanical permit separate ***

A building permit was issued to Wynn Design for a project at 9757 SE Holgate Blvd:

New 12 unit multi-family, 3 story apartment. 6 dwelling units attached with a breezeway to 6 dwelling units, no onsite parking, includes associated sitework *** elec, plum, mech, fs, separate permits. Fa steel guardrails, steel stairs and security deferred submittals***; <120 sq ft detached trash enclosure

A building permit was issued to Oh Planning and Design for the Kellogg Middle School at 3400 SE 69th Ave:

KELLOGG MIDDLE SCHOOL – New 100,000 sf, three story to include community and partner organization spaces with covered play area, play field, parkling lot, bus drop-off and emergency vehicle access road

Metro Reports: Jupiter Hotel, 1201 NW Naito, Kellogg Middle School and more

Jupiter Hotel

A building permit was issued for the Jupiter Hotel expansion

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights.

Early Assistance has been requested by Fosler Portland Architecture for a project at SW 36th Ave & Troy St:

New Mixed Use Building on vacant sloping lot. First 2 stories office and retail top 2 stories will have 4-8 apartments.

Early Assistance has been requested by Michael Green Architecture for a project at 1053-1201 NW Naito Parkway:

New 7-18 story Apartment Building – Timber (CLT) Construction – 2 levels for parking. 3 Development plans, some affordable housing proposed.

Early Assistance has been requested for a project at 1945 NW Raleigh St:

New 4 story 18 unit apartment building.

Early Assistance has been requested by Encore Architects for a project at 1337 E Burnside St:

The project consists of a six-story approximately 200 unit apartment building with below-grade parking for approx. 118 vehicles.

Early Assistance has been requested by TVA Architects for a project at 2880 SE Division St:

4-story mixed-use multi-family apartment project with ground floor leasable space, lobby, MEP/Utility/Service space, and three elevated apartment floor levels (combo of studio and one-bedroom units for a total of 67 units). Onsite surface parking will be provided. They may need an adjustment to parking stall width.

Early Assistance has been requested by Oh Planning + Design for a project at Kellogg Middle School

Redevelopment of middle school (Kellogg Middle School), either by new addition and renovations – or replacement of 100,000+ sq ft school.

A Pre-Application Conference has been scheduled by Köz Development for a project at 1111 NW 16th Ave:

New 95 studio unit apartment building, no parking proposed. A eco roof for stormwater management with flow through planters in the courtyard to manage impervious areas outside of the roof.

A Pre-Application Conference has been scheduled for a project at 1500 NE Irving St: 

Proposal is new construction of a four story apartment building with 60 units with tuck under grade level parkiing. Existing parking lot to be re-striped to provide parking lots for both existing office and new apartment building.

A Pre-Application Conference has been scheduled by Work Progress Architecture for a project at 330 SW 10th Ave:

New 23 Story Mixed Use Building – Existing Historic Federal Exchange Building to remain on site.

A Pre-Application Conference has been scheduled by TVA Architects for a project at 820 SE Alder St:

New multi-family residential development with ground floor retail and underground parking garage. 6 stories (67′ tall) with a combo of studio, 1 and 2 bedroom living units.

A project at 1650 NW Naito Parkway has been submitted for Type III Design Review by TVA Architects:

new 17 story apartment building. 258 residential units are proposed. The first floor will have both residential and parking. There are 192 underground parking spaces. The access for the parking would be from NW Naito. Two loading spaces are proposed. The property will be divided to create a 79,700 square foot site for this development.

A project at 306 SE 8th Ave has been submitted for Type III Design Review by SERA Architects:

Demo existing building, new development of 7 story 120 unit residential apartment building with ground floor retail and underground parking. 2 modifications , bike parking width &size of parking stalls.

A foundation permit was issued for 1133 SW Market St:

STR – to include Structure, Shoring, Ground Improvements and MEP underground

A building permit was issued to Studio3 Architecture for a project at 4030 N Vancouver Ave:

New mixed use building, 5 stories with ground floor commercial use and 49 apartment units above

A building permit was issued to Works Progress Architecture for the Jupiter Hotel Expansion:

Construct new 6 story mixed use building, includes event space and restaurant, floors 3-6 are hotel rooms, no parking. Site work and stormwater management included.

Metro Reports: Mason Ehrman Building Annex, St Francis Park Apartments, 97th Ave Gymnasium and more

St Francis Park Apartments

The St Francis Park Apartments by MWA Architects, which will include 106 units of affordable housing.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Brett Schulz Architecture have requested Early Assistance for a project at 10561 SE Division St:

Remove existing one story building and build new two story building adding 150 ft drive thru which will enter on SE 106th ave and exit on to SE division.

Early Assistance has been requested for a project at 1332 N Skidmore St:

Proposed 5-story apartment building with underground parking.

Oh Planning+Design architecture have requested Early Assistance for a project at 10234 NE Prescott St:

Early Assistance – Planner only – to discuss the construction of a three story building with associated site improvements at MHCC Maywood.  

FFA Architecture + Interiors have requested Early Assistance for a project at 1320 NW 17th Ave:

Proposing a mixed-use building with ground floor retail and 6 multi-family units at the first floor plus 8 floors of multi-family apartments and underground parking.

Deacon Development Group have scheduled a Pre-Application Conference to discuss a project at 4224 NE Halsey St:

100 unit apartment building proposed on the NE corner of the site.

VWR Development have submitted a project at 3910 NE Garfield Ave for Design Review:

4-story multi-family apartment building. Please note there is a concurrent review happening for a Amendment to LU 13-102007 LDS, with an adjustment to minimum lot dimensions and a lot consolidation. That concurrent case is LU 16-132893 AS, LC, AD.

Holst Architecture have submitted the Asian Health and Services Center at 9005 SE Foster Rd for Design Review:

Design review for new 29,000 sq ft 3-story building which will include offices, community gathering spaces, and ground floor office lease space. Modification request to loading standards. Modification request to on-site locations of vehicle areas.

Building permits are under review for projects at the Muslim Community Center, located at 5325 N Vancouver Ave:

New construction of modular building

New construction of pavilion

A building permit is under review for a project at 432 NE Jessup St:

Construct new 3 store (12) unit apartment building with associated site utilities

A building permit was issued to SERA Architects for the renovation of the Mason Ehrman Building Annex at 222 NW 5th Ave:

Core and shell renovation of historic building for future (B) tenants, change of occupancy from (S1) to (B), remodel all 3 stories of annex portion of building; includes seismic upgrade to annex. Includes seismic upgrades to adjacent Kalberer tower per stipulation of temporary certificate of occupancy of permit 00-159263CO; ; site work includes work in ROW and street trees/landscaping

A building permit was issued to MWA Architects for the St Francis Park Apartments at 1177 SE Stark St:

new 4-story, 72,055 sf, Type VA, 106 unit apartment building including improvements in vacated SE Oak St to meet superblock requirements.

Building permits were issued to Mentrum Architecture for a project at 1340 NE Killingsworth St:

New 3 story apartment building with 6 units, 50 sq ft detached trash enclosure, associated site work. North building, 1 of 2, **w/ 14-255316-CO**.

New 3 story apartment building with 6 units. South building, 2 of 2, **w/ 14-255312-CO**

A building permit was issued to LRS Architects for a project at 2330 NW Raleigh St:

New fourstory, 40unit apartment complex with lobby; on site bike parking and interior trash enclosure;including site work

A building permit was issued to Allusa Architecture for the 97th Ave Gymnasium:

Construct new gymnasium, new parking area with accessible stall, repave existing parking area at 4 plex, 98 sq ft trash enclosure

A building permit was issued to Architects Van Lom Group for a project at 13031 SE Foster Rd:

Construction of new 68-unit assisted care facility