Metro Reports: Pop Blocks, SW Park Apartments, 9330 SE Harold, and more

A permit is under review for an 11-story affordable housing development at 2059 SW Park Ave. The building, designed by Tahran Architecture & Planning, will use modular construction.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers October 18th, 2021 to October 24th, 2021.

Early Assistance has been requested by YBA Architects for a project South of 9330 SE Harold St:

The project consists of two buildings. Building A is a the 129,095SF 5-story, Type IIIB with 162 units of varying in size. The building fronts SE 92nd Avenue and creating an ¿L¿ shape around a residential green. Building B consists of seven 2-story town homes totaling 7,452SF. The main building will house a commercial gym at the SE corner, commercial co-working space in the center on 92nd, and a commercial office at the NW corner. Stormwater will be disposed through drywells , located either in the parking lot, or the landscape area in middle of the site.

Early Assistance has been requested for a project at 6698 NE MT St Helens Ave:

Applicant wishes to develop a car dealership, which may include (a) sales and leasing office (b) interior vehicle display (c) vehicle storage (d) vehicle repair facility and (e) other accessory uses such
as car wash on one or more of the development sites.

A Pre-Application Conference has been scheduled to discuss a project at East of 12395 SW Clara Ln:

52-bed residential care facility on a vacant property in the R10 zone – Conditional Use Review

A project at 1460 NE Prescott St has been submitted for building permit review by Koble Creative Architecture:

PDOX PS – new 3 story mixed-use building with basement. Basement storage, first and second story retail spaces, and 3rd story dwelling unit. Includes associated site work.

A project at 4961 SE 73rd Ave has been submitted for building permit review by McGuirl Designs & Architecture:

PDOX PS – Building A – new 3-story, 16-unit apartment building with associated site with/ w/ 21-092509-CO

PDOX PS – Building B – new 3-story, 14-unit apartment building with associated site with/ w/ 21-092506-CO

The SW Park Apartments at 2059 SW Park Ave have been submitted for building permit review:

SW PARK APTS – New 11-story, 89-unit prefabricated modular building utilizing mass plywood panels and light gauge steel; no parking; includes associated site work *** w/21-069768-MT ***

A building permit was issued to Mithun for Building A, a part of the Pop Blocks Phase 1A:

PEPSI BLOCKS – BUILDING A – New 8-story mixed-use building with 219 apartment units, residential amenities, retail spaces, and underground parking; includes new Woonerf, plaza, and associated site work. Project does NOT use Type III Code Guide. *** w/20-129212-MT ***

Metro Reports: Dekum Court, Hayu Tilixam, Mann House, and more

The new Dekum Court will include 187 units, affordable to those earning at or below 60% of the median family income.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers March 29th, 2021 to April 4th, 2021.

Early Assistance has been requested by McGuirl Designs & Architecture for a project at 4961 SE 73rd Ave:

2 New buildings on existing lot. Both buildings 3 Stories above grade with basement. 1- 14 unit building. 1 – 16 unit building. On site stormwater treatment.

The redevelopment of Dekum Court at 7003 NE 27th Ave has been submitted for building permit review by Lever Architecture:

DEKUM COURT – BUILDING A – New 3 story, 24 unit apartment building; includes associated site work *** w/21-023903/04/08/12/15/33-CO and 21-023931/38/46/49/50/52-MT

DEKUM COURT – BUILDING B – New 3 story, 24 unit apartment building; includes associated site work *** w/21-023903/04/08/12/15/33-CO and 21-023931/38/46/49/50/52-MT ***

DEKUM COURT – BUILDING C – New 4 story, 44 unit apartment building; includes associated site work *** w/21-023903/04/08/12/15/33-CO and 21-023931/38/46/49/50/52-MT ***

DEKUM COURT – BUILDING D – New 4 story, 52 unit apartment building; includes associated site work *** w/21-023903/04/08/12/15/33-CO and 21-023931/38/46/49/50/52-MT ***

DEKUM COURT – BUILDING E – New 4 story, 43 unit apartment building; includes associated site work *** w/21-023903/04/08/12/15/33-CO and 21-023931/38/46/49/50/52-MT ***

DEKUM COURT – COMMUNITY CENTER – New 1 story office/amenity building; includes associated site work *** w/21-023903/04/08/12/15/33-CO and 21-023931/38/46/49/50/52-MT ***

The adaptive reuse and additions to the Mann House at 1021 NE 33rd Ave have been submitted for building permit review:

MANN HOUSE – EXISTING BLDG – Convert existing historic building into multi-family apartments with 39 affordable units; add new floor and convert two-story auditorium to apartments; includes associated site work and parking area *** w/21-015284-CO/21-015286-CO/21-015288-CO/21-015967-MT/21-015971-MT/21-015973-MT *** 

MANN HOUSE – SOUTH BLDG – New 4-story multi-family apartment building with 40 affordable units; includes associated site work and tuck-under parking *** w/21-015284-CO/21-015286-CO/21-015288-CO/21-015967-MT/21-015971-MT/21-015973-MT *** 

MANN HOUSE – EAST BLDG – New 3-story multi-family apartment building with 50 affordable units; includes associated site work and parking area *** w/21-015284-CO/21-015286-CO/21-015288-CO/21-015967-MT/21-015971-MT/21-015973-MT *** 

Ankeny South at 2580 SE Ankeny St has been submitted for building permit review:

ANKNEY SOUTH – New 15 unit apartment building. **No Mechanical with this permit.

A building permit was issued to SERA Architects for the Modera Morrison at 1120 SE Morrison St:

MODERA MORRISON – Foundation, excavation, shoring, and all concrete work including columns, walls, mild-reinforced and post-tensioned slabs up to Level 3 for new 7-story apartment building with 1.5 levels below grade parking

A building permit was issued to Carleton Hart Architects for Hayu Tilixam at 5825 NE Prescott St:

New 4-story, 50 unit PHB residential building with community spaces and associated site work. w/20-198018-MT

Metro Reports: Society RCP, Morningstar at Laurelhurst, 4961 SE 73rd, and more

Society RCP will be a co-living community located across the street from food cart pod The Barley Pod, which was also developed by Ethos Development.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers February 22nd, 2021 to February 28th, 2021.

Early Assistance has been requested for a project at 4961 SE 73rd Ave:

2 New buildings on existing lot. Both buildings 3 Stories above grade with basement. 1- 14 unit building. 1 – 16 unit building. On site stormwater treatment.

Early Assistance has been requested by Evident Architecture Office for a project at 2892 NW Upshur St:

New 4-Unit Multi-Family Structure With On Site Parking

Early Assistance has been requested for a project at SW Barbur Blvd and Hamilton Terrace:

Proposed 12-Unit Apartment Complex with Associated Parking Lot Improvements in the RM1 and RM1c Zones. Approximately 28,228 sq. ft. of site area is located within the Environmental Conservation Overlay Zone area.

A Pre-Application Conference has been scheduled by Barry Smith Architect to discuss a project at 3333 SW US Veterans Hospital Rd:

(Refer to Zoning Map dated 2/24/21 for accurate portrayal of lots involved.) PROPOSAL The proposal is develop housing on Marquam Hill to eliminate commuting for residents and support personnel of the Hospitals and Level 1 Trauma Center. Housing and services are provided for the employment providers adjacent to the site. Household Living will be classified as Residential Group R1 and R2 for temporary and permanent residences by the Oregon State Structural Specialty Code. Household Living is mixed within structures in a combination of SRO and apartment configurations. Business, Retail Sales and Service and Assembly Occupancies are developed to provide support services for residents, guests and neighbors. Parking is provided and shared throughout the site. Also proposing Comprehensive Plan Map/Zoning Map Amendment for southerly lots from RM3 to CM2. Summarized (by Barry Smith): Change CM2 and RM3d map designations to EXd, concurrently with Planned development, concurrently with Design Review. 904 SW Gibbs can be considered a part of the site so long as we can continue the current path to start construction 3Q 2021.

A project at 4325 N Mississippi Ave has been submitted for building permit review:

Single PDF – new 3 story 12 unit apartment building.

A building permit was issued for the Society RCP at 1455 NE 62nd Ave:

New 3-story, 3-unit apartment building, including interior trash, associated sitework and on-site stormwater management.

A building permit was issued for the Morningstar at Laurelhurst at 3140 NE Sandy Blvd:

New five-story building of assisted living and memory care units with related amenities in a single building. A total of 115 units is proposed. 1 level of structured parking below grade. (w/ 20-144708-MT)