Weekly Roundup: Terwilliger Plaza Parkview Building, Live Nation South Waterfront, The Canyons, and more

The Terwilliger Plaza Parkview Building will be located across the street from the existing building, and include a skybridge over SW 6th Ave.

A resident-run retirement community is planning a $100 million expansion, reports the Oregonian. The Terwilliger Plaza Parkview Building will rise to 10 stories and include 127 one- and two-bedroom apartments.

Live Nation is in talks with the Zidell family to build a 10,000-seat performance venue in South Waterfront, according to the Oregonian.

Turner Construction is rushing to complete work* on the Providence Park Expansion in time for the Portland Timbers’ home opener on June 1, reports the Daily Journal of Commerce.

Prosper Portland has selected the “Play” concept for the Broadway Corridor, writes the Oregonian. The concept would see the former post office “replaced with sports fields and basketball courts flanked by high-rises.”

A proposed bill in the Oregon legislature aims to create more lower priced condominium units. Developments that go through a more stringent envelope inspection would see the period for lawsuits reduced from 10 years to six, and require approval from a majority of homeowners to initiate a lawsuit.

The 101 affordable apartments at 72 Foster are now complete. The Daily Journal of Commerce published photos of the development, which has an “intergenerational focus.”

The Business Tribune wrote about how at The Canyons developer Ben Kaiser is creating a “community with no limits on age or accessibility.”

*This article will be unlocked for the rest of this week. After this week it will only be viewable by DJC subscribers.

Metro Reports: Lincoln High School, Terwilliger Plaza, The Canyons, and more

Lincoln High School
The new Lincoln High School, as presented to the Design Commission at a Design Advice Request meeting held on February 7th, 2019. The new school will be built at the west end of the campus, enabling the existing building to remain in use during construction.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers February 11th to February 17th, 2019. 

Early Assistance has been requested by Sinan Gumusoglu Architecture for a project at 7336 N Greenwich Ave:

A new 16 unit, 3 stories high market rate residential building is proposed. New building will replace the existing house. There will be (11) one bedroom and (5) two bedroom units. No car parking will be provided. Drywell located in Community room, will be used to treat stormwater. Community design standards will be used (33.218.110).

Early Assistance has been requested by Studio 3 Architecture for a project at  7156 N Greenwich Ave:

18 unit apartment building (11,180 GSF) with drywell. Meeting community design standards.

Early Assistance has been requested by Sinan Gumusoglu Architecture for a project at 3757 SE Clay St:

A new 16 unit, 3 stories high market rate residential building is proposed. New building will replace the existing house. There will be (11) one bedroom and (5) two bedroom units. No car parking will be provided. Drywell located in Community room, will be used to treat stormwater. Community Design Standards will be used (33.218.140)

A Pre-Application Conference has been scheduled to discuss the Terwilliger Plaza Expansion to a site at 2419 SW 5th Ave:

Expansion of existing Terwilliger Plaza campus to this location. Full block redevelopment with approximately 130 new independent living units.

A Pre-Application Conference has been scheduled by Stewart Gordon Straus Architect to discuss a project at 3203 SW 2nd Ave:

2 new apartment buildings, 4 plex each. New pedestrian corridor: Stairs connecting Barbur Blvd and SW 2nd Ave. Buildings have flow through planters with discharge to public combo sewer.

The Lincoln High School Replacement at 1600 SW Salmon St has been submitted for Type III Design Review by Bora Architects:

Lincoln High School replacement. Modifications for Building Line standards, Transit Street Main Enterance, Ecoroof & Bicycle Parking.

A project at 11864 NE Halsey St has been submitted for building permit review:

New 4 story self storage facility and associated site work to include parking lot *** w/detached trash enclosure 19-119039-CO *** w/ 19-119041-MT ***

A building permit was issued to SERA Architects for the Wells Fargo Center renovation and addition at 350 SW Jefferson St:

Renovation of existing office building; convert some of penthouse to assembly space add new floor area and remodel existing floors for office space; new entry, new roof deck; create shell spaces for future tenants

A building permit was issued to Urban Development Group for a project at 1717 SE Tenino St:

Construction of new 4-story 91 unit apartment building with 19 parking spaces and associated sitework

A building permit was issued to PATH Architecture for The Canyons at 3450 N Williams Ave:

New 6 story CLT, 70 unit multifamily apartment building with ground floor to include retail and work spaces; basement to include amenities and parking; with associated sitework *separate MT and demo permit reqd septic decommissioning required. call for inspection 842.

Building permits were issued for a project with two buildings at 3539 N Gantenbein Ave:

New 3 story 6-plex building, site work, and trash enclosure less than 120 sq. ft. ***mechanical permit separate***

New 3 story 6-plex building, site work, and trash enclosure less than 120 sq. ft. ***mechanical permit separate***

A building permit was issued to John Weil Architecture for the Providence Park Retail and Ticket Booth Addition:

Construct a new 1,200 square feet single story building for retail, with a smallstorage area, and an eco-roof covering the entire roof area

Metro Reports: Division Two, Sandy.51, Ankeny Apartments, and more

Ankeny Apartments

The Ankeny Apartments have been submitted for building permit review. In a rare action the project was denied by the Design Commission in February 2017. The denial was appealed to City Council, who ultimately approved a revised design in August 2017.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers November 26th to December 2nd, 2018. 

Early Assistance has been requested for a project at 2436 SW 6th Ave:

Proposal is to build a skybridge to adjoin two buildings: Terwilliger Plaza a retirement community and a new building located between SW 6th Ave and SW 5th Ave between SW Caruthers and SW Sheridan St. The proposed building is identified as the Parkview Building on the site plans.

The Meyer Memorial Trust Headquarters at 2045 N Vancouver Ave has been submitted for a Type II Adjustment Review by Lever Architecture:

The project consists of a three-story urban office building in Portland, OR. The site i slocated on N Vancouver Ave and bounded by Tillamook St and Interstate 5. The building will be used as the headquarters for Meyer Memorial Trust. The building includes surface parking behind the bulding and an outdoor courtyard and patio.

The Ankeny Apartments at 1122 SE Ankeny St have been submitted for building permit review by YGH Architecture:

New construction of 6 story, 16 unit building w/ one main floor tenant space, rooftop solar and all associated site work ***mechanical and electrical separate***

A building permit was issued to Allusa Architecture for a project at 6822 NE Grand Ave:

Construct new 3 story 6 unit apartment building with associated site work

A building permit was issued for the Division Two Apartments at 3249 SE Division St:

New multi-family 4-story building with 54 units and ground floor retail and parking. Includes site improvements and new retaining wall along n edge of property

A building permit was issued for the Sandy.51 Apartments at 2351 NE 51st Ave:

New 6-story, 85 unit apartment building; ground floor shell only; recycle room; with onsite parking, includes associated site work***with 17-169667-mt permit***