Modera Davis receives Design Advice (images)

SERA Architects have gone before the Design Commission to receive Design Advice on the Modera Davis, a 12 story mixed use building in the Pearl. The 130′-4″ tall building for developer Mill Creek Residential Trust would include 150 residential units and approximately 4,000 sq ft of retail. Parking for 94 vehicles is proposed in two levels of below grade parking.

Modera Davis

Read More

Weekly Roundup: Pine Street Market, Fair Haired Dumbbell and 4335 SE Belmont

The Fair Haired Dumbbell

The Fair Haired Dumbbell

The first vendors at the Pine Street Market opened yesterday, including Pollo Bravo and Trifecta Annex. Early in the week The Oregonian published photos of the nearly completed food hall.

The Portland Business Journal reported that Guerrilla Development has received authorization from the Securities and Exchange Commission to raise $1.5 million in funding for the Fair Haired Dumbbell through a crowd sourced offering. Construction of the building is expected to begin in May.

The Portland Chronicle wrote about a 63 unit apartment development at 4335 SE Belmont, which will involve the demolition of three existing houses.

Tower at 7th & Burnside goes before Design Commission (images)

Polyphon Architecture & Design have gone before the Design Commission to receive advice on a proposed 11-story mixed use building at SE 7th & E Burnside. The 121’-10” tall building would include a 10,628 sq ft of office space and 49 residential units. Two retail units would front onto E Burnside. Parking for 55 vehicles and 78 bicycles is proposed.

7th & Burnside

Read More

Pearl East goes before Landmarks Commission (images)

Mackenzie have gone before the Historic Landmarks Commission with designs for a new 7 story quarter block office building, with the working name Pearl East. The 94′-4″ building would have approximately 60,000 sq ft of commercial office space and ground floor retail. The project includes three level of below grade parking, some of which is provided to replace existing parking.

Pearl East

Read More

Metro Reports: 2815 SW Barbur, Yard, Iron Fireman and more

2815 SW Barbur

The Under Armour building at 2815 SW Barbur, as approved last year.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Bora Architects have requested Design Advice for an addition to 2815 SW Barbur BlvdUnder Armour’s new Portland base:

Proposed addition to building that is currently undergoing a change in use.

Otak Architects have requested Early Assistance for a project at 5416 NE 14th Pl:

Proposal is to build a four story wood framed multi-family apartment building with 15 dwelling units and five parking spaces.

Early Assistance has been requested for a project at 11144 NE Sandy Blvd:

Proposed 4-story Motel 6 with surface parking.

Holst Architecture have requested Early Assistance for a project at 3403 N Mississippi Ave:

Proposed mixed-use housing project with approximately 175 units. Will meet community design standards.

Early Assistance has been requested by Brett Schulz Architect for a project at 121 N Beech St:

Development of a new mixed use building 20+ apartments & retail space – no parking proposed

Early Assistance has been requested by Works Partnership for a project at 110 SE Washington St:

Proposed 8-story mixed-use office and retail building.

Early Assistance has been requested by Ankrom Moisan Architects for a project at SW Broadway and 9th:

Multi-family dwelling building with parking below.

A Conditional Use Review has been submitted for a project at 1120 SE Madison St:

Convert existing building from Warehouse and Industrial Service Use to an Office Use in the IG1 zone.

A Design Review has been submitted by Skylab Architecture for alterations to Yard:

alterations to previously approved design review for Block 67 (the Yard)

Mackenzie have submitted alterations to the Iron Fireman building at 4784 SE 17th Ave for building permit review:

Core and shell build out of 78,246 sf of 108,066 sf building, for future tenants; add new interior walls to create 10 tenant spaces, lobby area, restrooms, bike storage area; and new stairs that lead to mezzaninne; voluntary seismic upgrade. No occupancy this permit. Separate tenant improvement permits required.

A building permit is under review for 606 NE 20th Ave:

New construction of a 6-story 59unit apartment building including parking and retail on level 1. Levels 3-6 contain a mix of apartment including studios, 1 bedroom, and 2 bedrooms. Level 6 also has an amenity deck along the west property line. Retail space on level 1 is to be built out under a separate permit with no occupancy this permit. Demo of existing building to be under separate permit. Demo plans included for reference only.

Studio 3 Architecture have submitted at a project at 7220 N Burlington Ave for building permit review:

Construct new 2 story (24 unit) apartment building with associated site work

A building permit is under review for a project at 6404 N Montana Ave:

New 6 unit, 3 story apartment with associated site work and landscaping

A building permit was issued for a project at 3423 SE Hawthorne Blvd:

New five-story, 28-unit multi-family apartment complex; on site bike parking; no on-site parking; drywell, landscaping and utilities, trash enclosure on adjacent lot

 

Design Commission approves PSU Viking Pavilion (images)

The Design Commission has approved designs for a remodel of the Portland State University Peter Stott center, which will include the creation of the new Viking Pavilion. The project by Woofter ArchitectureSink Combs Dethlefs Architects and Lango Hansen Landscape Architects will create a new multi-purpose arena with seating for 3,400 people in the heart of the PSU Campus. As reported in March of last year, the building will also be used by OHSU, who are contributing part of the funding. Other functions to be located in the building include new classroom space, offices, a cafe and a student lounge. 62 short-term bike parking spaces will be provided. No vehicular parking is proposed.

PSU Viking Pavilion

Read More

Weekly Roundup: Broadway Tower, Oliver Station, Touché Restaurant and more

Broadway Tower

The Broadway Tower, which will include a Radisson RED hotel

A 12 story residential development at 505 NW 14th Ave could involve the demolition of three buildings in the Pearl, including Fire Station #3, reported The Portland Chronicle. The building is currently home to Touché Restaurant & Bar.

The Oregonian reported that Radisson RED will be the hotel tenant for the 19 story Broadway TowerThe new brand doesn’t include front desks, and instead uses technology “to simplify the experience and provide efficiencies including keyless guest room entry.”

The Willamette Week reported that Palindrome Communities have closed on the purchase of the New Copper Penny nightclub in Lents. The purchase will allow Oliver Station to move ahead. The project will include approximately 126 affordable apartment units and 19 market rate units.

BikePortland wrote that average apartment building costs fell sharply during the period in which a large number of apartments without parking were being built. After the City Council added minimum parking requirements in 2013 construction costs rose again.

Following up on a previous article, Portland Architecture wrote about the selection process for the Multnomah County Courthouse and SRG Partnership’s design for the new building.

The Portland Business Journal wrote about how developers are betting more on bikes — and seeing big benefits.

Renovation of Towne Storage building approved (images)

The Historic Landmarks Commission has approved designs for the renovation and expansion of the Blake McFall Company building, commonly known as the Towne Storage building. The project by LRS Architects for Sentinel Development and Westport Capital Partners will adapt the existing building for creative office space, with a restaurant space at the ground floor. As part of the project the unreinforced masonry building will receive a seismic upgrade.

Towne Storage / Blake McFall Company Building

Read More

Metro Reports: OHSU CHH South, 3730 SE Powell, 505 NW 14th and more

OHSU Center for Health and Healing South

The OHSU Center for Health and Healing South

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Early Assistance has been requested for a project at 8106 N Interstate Ave:

Proposal is for a new five story building with 120 apartment units including 64 group living units with shared kitchens. Proposed 33% parking ratio minus a 25% bike parking reduction will be provided in an undergrd garage.

SERA Architects have scheduled a Pre-Application Conference to discuss a project at 505 NW 14th Ave: 

Pre-Application Conference to discuss a Type III Design Review for a new 150-unit, 12-story, market-rate apartment building with ground floor retail and basement parking. Existing building on site is listed on the Historic Resource Inventory.

Woofter Architecture have applied for the first building permit required for the PSU Viking Pavilion:

partial – demolition of eastern half and selective demolition on western half of the existing building, relocation of existing gas meters, sewer line and hydrants, interior improvements including finishes, plumbing, electical and mechanical duct work to unoccupied weight room

Studio3 Architecture have submitted a project at 3730 SE Powell Blvd for building permit review:

Construct new 3 story (30 unit) apartment building with associated site work and detached. Brooker property.

A building permit is under review for a project at N Holman and Interstate:

Construct new 3 story (6) unit apartment building; with associated site work; detached trash enlosure

A building permit was issued to Mentrum Architecture for a project at 5350 SE 18th Ave:

Construct 3 story apartment building, 18 units, 6 per floor, attached covered trash enclosure, flow through planter and other associated site work

The first building permits were issued to ZGF Architects for the OHSU Center for Health and Healing South:

Site demolition, excavation, and tower crane foundation and disconnect site irrigation system.

FND 1 : Piles, partial 2 level basement in NW corner (exterior walls only, matt slab @ level B2), tunnel @ level B2 connecting to subgrade parking at block 29 and shoring for all four corners (there is no utility work under this permit.)