Metro Reports: 15 story tower proposed at 514 SE Belmont, permit issued for Hawthorne 31, and more

11th_ankeny_preapp_img_01

11th & Ankeny apartments

Every week, the Bureau of Development Services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

Urban Development Group have requested Design Advice for their project at 11th & Ankeny:

Design Advice Request for a new mixed-use building – 2191 sq ft retail; 84 residential units; 6081 sq ft of below ground parking (23 parking spaces total).

Early Assistance has been requested for a project at 7246 N Mohawk Ave:

17-18 unit multi family building with on-site storm handling. Transfer of density from neighboring site at 7922 N Ivanhoe. One house to remain on 7922 N Ivanhoe.

A Pre-Application Conference has been scheduled by Vallaster Corl Architects to discuss a project at 514 SE Belmont St:

Pre-App. Conference to discuss a Type III Historic Resource Review for a new 15-story mixed-use building with ground level retail, parking (approx. 90 spaces) on the 2nd and 3rd floors and 193 residential units on the upper floors.

A Pre-Permit Zoning Plan Check has been requested for a building at 3423 SE Hawthorne Blvd:

New four story 24 unit apartment building

Holst Architecture have submitted 510 NW 15th Ave for Design Review:

Renovation of 2 existing buildings to include seismic upgrades, 4 levels on the west building for creative office space

A demolition permit was issued to Works Partnership, which will enable a townhome development at 5711 E Burnside St to move ahead:

Demolish existing one story commercial building, 896 sf, requirement of final plat permit 15-108229FP, remove all debris

A pair of building permits were issued to FFA Architecture for the Tess O’ Brien apartments:

6 story 5/1, 74 apts

6 story 5/1, 52 apts

A building permit was issued for an apartment building at 4937 SE Division St by SERA Architects:

New 134 unit apartment building with retail at ground level and tuck under parking.

A building permit was issued to TVA Architects for the Hawthorne 31 Apartments at 1515 SE 31st Ave:

New 4-story mixed use building with ground floor retail and 30 apartment units in floors 2-4.

A building permit was issued for a new building at 6030 SE 52nd Ave:

New 2 story commercial building; shell only; with associated site work. No occupancy under this permit, separate ti permits required for occupancy. Sprinkler/alarm required.

Weekly Roundup: Lents Town Center, Loyal Legion, Langano Apartments and more

Lents Town Center Property #2

Lents Town Center Property #2, including the New Copper Penny site

The Portland Development Commission will vote next week on whether to offer financial support to the three development projects in Lents. The developments include: a development by Palindrome Communities on Lents Town Center Property #2, which will also include the New Copper Penny site; a development by Williams & Dame on  Lents Town Center Property #3 (South); and a third by Asian Health & Services Center Lents Town Center Property #4.

The Loyal Legion, the new bar by ChefStable in the I. O. O. F. Orient Lodge / PPAA Building will open to the public on July 8th. A pre-opening event hosted by Restore Oregon will take place on July 3rd, where guests will receive guided tours of the newly renovated building.

The City Council discussed the zoning map amendment that will allow the Multnomah County Health Department HQ to be up to 150′ tall. A vote will be held next week.

A 6 week old restaurant was named by The Oregonian as its restaurant of the year. Renata recently opened in the former warehouse at 626 SE Main.

The growth scenarios in the 2035 Comprehensive Plan show that Portland is expected to gain 94,000 new apartments between 2010 and 2035, but only 17,000 new single family homes.

The new headquarters for SolTerra Systems at 2422 SE 9th Ave will be the tallest building on the west coast built with insulated concrete forms. Other sustainable features will include a green roof and low flow plumbing fixtures.

The Portland Business Journal published a photo gallery of Park Avenue Westthe downtown skyscraper scheduled for completion in December.

Tenants are now moving into the Langano Apartments, according to the Portland Chronicle. The building is owned by Petros Jarra and Ainalem Sultessa, immigrants who formerly operated Jarra’s Ethiopian Restaurant on the same site.

The Oregonian reported on the new building proposed at 4th & Harrison, which will include 425 apartments targeted to students at PSU. The developer hopes to open the building in 2018.

The East Building at One North is nearly finished. The Daily Journal of Commerce wrote about how the building will serve as a model for sustainability.

Restoration Hardware returns to Historic Landmarks Commission (images)

The proposed Restoration Hardware store on NW 23rd has returned for a second Design Advice hearing in front of the Historic Landmarks Commission. The proposed store by  Ankrom Moisan Architects would be modeled on the furniture store’s ‘Gallery’ concept, as used at the recently opened West Hollywood store. Furniture would be display in a series of linked rooms, as they might be in a house. A roof terrace will be used to display outdoor furniture.

NW 23rd Restoration Hardware

Read More

9th & Belmont Apartments (images)

A Design Review hearing has been held for the 9th & Belmont Apartments, a 6 story building by Ankrom Moisan Architects and Foresight Development & Real Estate. The proposed building would have 105 units, split between 35 studios, 60 one bedroom units and 10 two bedroom units. Up to 5 retail spaces are proposed at the ground level. Parking for 17 cars and 163 bicycles will be provided.

9th & Belmont

Read More

4th & Harrison returning for Design Advice (images)

Core Spaces are set to appear in front of the Design Commission with revised designs for 4th & Harrison, a 15 story apartment building. The proposed building will include 425 rental units, with a mix of studio, one, two and three bedroom apartments. According to the developer the intent is that the project will “have wide appeal including recent graduates and young professionals, families [and] empty-nesters.” Plans show a 30,000 sq ft grocery store at the ground level, along with a 5,000 sq ft ‘fast casual’ restaurant. The building will include 158 below grade car parking spaces, accessed from SW Harrison. 66 spaces will be reserved for the use of shoppers at the grocery store, with the remaining 92 spaces dedicated to residents of the building. The design architects for the building are Hartshorne Plunkard Architecture of Chicago, with Portland based Myhre Group Architects acting as consulting architects.

4th & Harrison

Read More

Metro Reports: Carbon12, Grove Hotel, 21st and Irving Apartments and more

Carbon12

Carbon12, as shown during Design Advice

Every week, the Bureau of Development Services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

Design Advice has been requested for a project at 3207 SW 1st Ave:

Warehouse to office conversion.

Early Assistance has been requested by Mentrum Architecture for a new building at 6205 N Minnesota Ave:

Proposal is for a 3-story 18 unit apartment building

A building at 3514 NE Sandy Blvd has been submitted for Design Review:

Design Review for a new one story- (8,115 s.f.) building

Carbon12 by PATH Architecture has been submitted for Historic Resource Review:

Eight story mixed use building with 22-24 parking spaces with two ground floor retail units and 14 residential condominiums. The roof will also have a roof deck for the top two units.

Surround Architecture have submitted their designs for renovation and expansion of the Grove Hotel for Historic Resource Review:

This project consists of a renovation of an existing three-story building with basement and construction of a new nine story , 44,200 sf concrete building

Emerick Architects have submitted their 21st and Irving Apartments for Historic Resource Review:

Demo of exising structure for development of 4 story mixed use development including 57 living units and 55-62 parking spaces. Historic resource review with 6 modifications.

 

 

Weekly Roundup: progress on Zidell Yards, 419 E Burnside, 1510 NE Multnomah and more

Zidell Yards

Conceptual image of the Ross Island Bridge Park at the Zidell Yards

The Portland Development Commission and ZRZ Realty came to an agreement over development at the Zidell Yards. The Development Agreement, backed by $23.7 million of public money, will lead to 1.5 million sq ft of commercial and residential development.

The Willamette Week published rebuttals to the 5 Myths About Portland Apartments.

The Oregonian published the first images of what the massive development at 1510 NE Multnomah might look like. The three building development could include as many as 1,125 units.

Multnomah County voted to allow Central City Concern to sell a quarter block parcel to developer Trinsic Residential Group. The land deal will 419 E Burnside to move ahead.

A grand opening was held for the Hotel Eastlund, the newly renovated hotel in the Lloyd District. The Daily Journal of Commerce published a photo gallery, with shots of both the exterior and interiors.

Construction is about to begin on the first building of the Dharma Rain Zen Center. The center will be built on a site on NE Siskiyou St, which was used for years as a dump for construction debris, leaving the site too contaminated to develop. The Buddhist nonprofit bought the site in 2012, and has worked since then on the site remediation.

A warehouse at 2330 NW Raleigh St is set to replaced by a 40 new apartments. The Portland Chronicle looked into the history of the property about to be redeveloped.

Eater Portland  reports that the Pine Street Market has named its latest tenant: Peruvian restaurant Andina. The market is set to open in November.

A gallery in the Daily Journal of Commerce showed the progress on The Abigail, the latest affordable housing project in the Pearl.

 

Renovation of Mont Blanc Building planned (images)

A major renovation is planned for the Mont Blanc Building in the Irvington neighborhood. The existing warehouse will be converted by North Rim Development for use as commercial catering kitchens and creative office space. At the ground floor the building will include 4 catering/commercial/production kitchens, along with 8,500 sq ft of office/retail space. The second floor will become 9,900 sq ft of office space.  The design for the project is by Richard Brown Architect.

Mont Blanc Building

Read More

Modera Belmont continuing through Design Review

The Modera Belmont, an apartment complex by SERA Architects and Mill Creek Residential Trust, is continuing its way through the Design Review process. The full block development would contain 202 dwelling units above ground floor retail and live/work units.  105 car parking spaces would be located in a below grade garage, with bike storage located in a common room accessed directly from the SE 7th Ave.

Modera_Belmont_dz2_img_02

Read More