Metro Reports: PAE Living Building, Pepsi Blocks Phase 1A, LISAH, and more

PAE Living Building
The PAE Living Building at SW 1st and Pine was recently approved by the Historic Landmarks Commission, and has now been submitted for building permit review.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers June 24th to June 30th, 2019.

Design Advice has been requested by Hacker for a project at 2865 SE Division St:

10-unit (approx 37,000 sf) multi-family project with a ground floor restaurant tenant space and 20 parking spaces (with access from SE 28th). Outdoor space is provided in individual terraces and a common roofdeck.

Early Assistance has been requested for a project at 1726 NE 82nd Ave:

Proposal is for a 77 unit apartment with retail on the ground floor.

Early Assistance has been requested for a project at 5625 NE Glisan St:

Demo existing residential building. Consolidate adjacent lots through the County. Construct 2 new apartment structures on a single lot, 2 building permits. Stormwater to be treated in underground detention in the common courtyard or rear setback.

The Pepsi Blocks Phase 1A at 2505 NE Pacific St has been submitted for a Type III Design Review by Mithun:

Phase 1A of the Planned Development for redeveloping the Pepsi Bottling Plant on NE Sandy Blvd. Includes the renovation of the existing mid-century Pepsi warehouse, one new mixed-income apartment building (218 units proposed), below-grade parking, a new publicly-accessible Plaza, and design of a multi-modal east-west connector (NE Pacific Street Woonerf). Modifications are requested to 33.130242.C: Transit Street Main Entrance and 33.266.200.C: Long Term Bicycle Parking Space Dimensions. Adjustment requested to 33.266.310: Loading Standards

The 1500 SW Taylor Apartments have been submitted for building permit review by Leeb Architects:

Review w/ 19-178918-MT New construction 7-story apartment building. 5-story Type IIIA residential building over a 2-story Type 1A podium. The building contains 105 residential units and amenity spaces. The Podium level structure has parking for 19 cars, 2 loading spaces 71 bicycle parking spaces, a leasing office, a small retail tenant shell space and apartments.

A project at 3240 N Williams Ave has been submitted for building permit review:

New wood frame 4 story mixed use building with associted siteworks. 12 residential units over ground floor. Retail, trash, parking, electrical room and lobby on ground floor. Separate demo 18-177160-co.

A project at 904 SE Division St has been submitted for building permit review by LRS Architects:

New Response/Service Center Facility for NW Natural consisting of a fire-sprinklered 3-story office building and an attached 2-story storage building. Includes reconfiguration of parking and associated site work *** DFS for pre-fabricated metal building *** w/19-186013-MT ***

The PAE Living Building at SW 1st and Pine has been submitted for building permit review by ZGF Architects:

Review w/ 19-158248-MT New construction of 53,646 GSF, 5-story office building in historic district. Project is utilizing elements such as cross laminated timber (CLT), composting toilets, and water filtration/reuse to achieve the Living Building Challenge (LBC) certification. Will house PAE’s Porltand office and other tenants. Includes retal spaces at the ground floor.

Building permits were issued to Holst Architecture for LISAH (Low Income Single Adult Housing) at 8550-8580 N Argyle Way:

Pre fab congregate living facility consisting of 2 floors with 6 type B sleeping units, 1 kitchen and 2 bathrooms per floor.

Pre fab congregate living facility consisting of 2 floors with 6 type B sleeping units, 1 kitchen and 2 bathrooms per floor.

Pre fab congregate living facility consisting of 2 floors with 6 type B sleeping units, 1 kitchen and 2 bathrooms per floor.

New three story, (bld #1) multi-family, prefab building consisting of 35 studio units, 1 one bedroom unit, 2 offices, kitchen/community room, pantry, laundry room, 2 utility rooms, and elevator.

Building permits were issued to CIDA Architects for a project at 7676 and 7686 N Lombard St:

New 3 story (12) unit apartment building

New 3 story (12) unit apartment building with detached 54 sf trash enclosure and associated site work

Metro Reports: 1440 SW Taylor, 1905 NW 23rd, 25 N Fargo, and more

1825 NW 23rd Ave

A building permit has been issued for a development at 1905 NW 23rd Ave

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers May 14th to May 20th, 2018. 

Early Assistance has been requested by DMS Architects for a project at 10215 SE Foster Rd:

Proposal is for a new 1,500 sf commercial building accessed by lot to south. Structure raised above flood plain.

A project at 25 N Fargo St has been submitted for Type II Design Review by Jackson Main Architecture:

New construction of seven story mixed use building with 101 dwelling units. Incentive zone with affordable units and parking provided though none is required.

A project at 3240 N Williams Ave has been submitted for Type II Design Review by Evident Architecture Office:

New mixed-use, 4 story building. 12 residential units over ground floor retail and parking.

A project at 9648 NE Couch St has been submitted for Type III Design Review by Works Progress Architecture:

Work includes construction of one new residential mixed-use building including 54 residential rental units, ground floor retail, and at grade parking. Building to be 5-stories of wood frame construction over a 1-story concrete podium. Residential units are a mix of studios, one-bedrooms, and two-bedrooms.

A project at 206 NE Sacramento St has been submitted for Type II Historic Resource Review:

Proposal is for a 10-unit multi-family development in the R2 zone. Existing historic dwelling to be removed. Amenity bonuses are proposed to increase density from 7 units to 10 units.

A project at 626 SE Spokane St has been submitted for building permit review:

New 2 story, 12 unit apartment building, includes associated sitework

A project at 4064 N Mississippi Ave has been submitted for building permit review by Allied Works Architecture:

New construction of 4 story mixed use building with 15 market value units; two retail spaces ground level; associated site work (tenant improvement separate)

A project at 8928 SE Woodstock Blvd has been submitted for building permit review:

Contruct new 3 story (12) unit apartment building with associated site work

The Magnolia 2 Apartments on land South of 3250 NE Martin Luther King Jr Blvd has been submitted for building permit review by LRS Architects:

New 4 story affordable housing project building which includes 50 new living units and 9 new surface parking stalls at ground floor with common, outdoor play and patio areas totaling 44,584 sq.ft., Connecting to Phase I building.

The 1440 SW Taylor Apartments have been submitted for building permit review by Leeb Architecs:

New 5 story, 107 unit apartment building with onsite parking, includes associated sitework *** w/18-169035-MT permit ***

A project at 2940 SE Division St has been submitted for building permit review by Quilici Architecture & Design:

New 4 story, 32 unit apartment building with no onsite parking, includes associated sitework

A project with two buildings at 1340 N Dekum St has been submitted for building permit review by Brett Schulz Architect:

New 3 story 15 unit apartment building to include 5 dwelling units per floor

Construct 3 story (18) unit apartment building with associated site work

A project at 9211 SE Division St has been submitted for building permit review by Allusa Architecture:

New 3 story apartment building with 15 units, detached trash enclosure less than 120 sq ft.

A project at 2106 SE Division St has been submitted for building permit review by Allusa Architecture:

New 3 story mixed use building with ground floor restaurant, 9 apartment units.

A project at 5410 SE 122nd Ave has been submitted for building permit review:

Construct new 1 story building with new driveway and parking

A building permit was issued to Works Progress Architecture for a project at 1905 NW 23rd Ave (previously 1825 NW 23rd Ave):

New 5 story, 64 unit mixed use building with retail in first floor concrete podium. Landscaping, first floor parking and site utilities

A building permit was issued for a project at 6105 SE Cora St:

New 3-story 15-unit apartment complex, with attached trash enclosure, and associated site work

A building permit was issued to Valeant Architecture for a project at 2720 SE Steele St:

Construct new 3 story (7 unit) apartment building over carport; with attached bike storage and trash enclosure; new parking lot

Metro Reports: 6125 SE Division, Lloyd East Anchor, 6112 SE Foster, and more

The new Regal Cinema proposed at the east end of the Lloyd Center has been submitted for building permit review.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers March 12th to March 18th, 2018. 

Early Assistance has been requested by Evident Architecture Office for a project at 3240 N Williams Ave:

Current code: Proposal is for a new four story commercial building with ground floor retail and parking and three floor residential or commercial work/live units. On site stormwater management will be planters and drywells. Applicants will explore a minor height adjustment of approx. 6ft over the allowed 45 ft.

Early Assistance has been requested by MFA Architecture & Planning for a project at 8308 SE 13th Ave:

Proposed project includes removing an existing two-story building and developing a new 28,000 SF four-story 19 unit apartment building with retail and office space on ground floor. The building will provide setbacks from the south and east
property lines with a required buffer on the east property line.

The Lloyd East Anchor Remodel has been submitted for building permit review by LDA Design Group:

Renovate former Sears building. The lower levels will be for retail and office use while the upper level is being expanded by 76,000 sf for a 14 screen movie theater. A new mall entry will be added to the Eastern side of the mall to provide a connection to the exterior and a new theater lobby entry will be located at the corner of the existing parking structure to provide vertical circulation to the mall and theater.

A project at 9833 N Portsmouth Ave has been submitted for building permit review:

Construct new two story office building to include main level; rec room, restroom, with covered concrete porch on NE area of building, second floor to include two offices and restroom with covered porch on NE area of building

A project at 6125 SE Division St has been submitted for building permit review by Ankrom Moisan Architects:

Construct new care facility with underground parking and living care facility on main floor; associated site work

A building permit was issued to Steelhead Architecture for a project at 6112 SE Foster Rd:

TI for new brewery; change of occupancy from ‘M’ to ‘A-2’ for restaurant and ‘B’ to ‘F-2’ for brewery; new partition walls for kitchen, restrooms, office, brewery and storage room; new counter for bar, relocate entry. With 108 sf trash enclosure and parking lot improvements. Walk-in cooler under separate permit.