Weekly Roundup: PDX Concourse E Extension, Grant High Modernization, Redd on Salmon Street and more

Portland International Airport Concourse E Extension

Portland International Airport Concourse E Extension

The Oregonian published images of the Portland International Airport Concourse E Extension, which will be used by Horizon Air. As part of a large project, Alaska Airlines will move from the south side of the airport to the north, while United will relocate from the north to the south.

Portland Architecture made the case for the preservation of Veteran’s Memorial Coliseum, as new study has come out with multiple options for the building.

The Portland Business Journal reported that the office space in Park Avenue West is now entirely leased, with Morgan Stanley taking the final two available floors. Leasing has also begun on the apartment units.

Mahlum have been selected as the architects for the Grant High School Modernization, according to the Hollywood Star News. Construction on the project is scheduled to begin in 2017.

The latest retail tenant at the LL Hawkins and Slabtown Marketplace is the Consolidated Community Credit Union, reported the Portland Business Journal.

A four story, 30 unit mixed use building is proposed for 1515 SE 44th Ave. The Portland Chronicle looked at the existing house on the site, which may or may not be demolished as part of the project.

Thomas Robinson of Lever Architecture was interviewed on OPB’s ‘Think Out Loud’ about Framework, the planned 12 story wood building set to go up in the Pearl.

The Redd on Salmon Street has won a design award for resilience, according to the Portland Business Journal.

The Portland Chronicle covered the history of an industrial building in Sellwood at 8222 SE 6th Ave, set to be replaced by a mixed use development.

Construction on The Ella in South Waterfront is moving into its final phases, according to the Portland Business Journal. The 6 story building utilized a pre-fabricated wood framing system, which minimized construction waste on site.

Historic Landmarks Commission discusses Restoration Hardware (images)

The proposed Restoration Hardware store on NW 23rd has returned for a third Design Advice hearing in front of the Historic Landmarks Commission. The proposed store by Ankrom Moisan Architects will be modeled on the furniture store’s ‘Gallery’ concept, as used at the recently opened West Hollywood store. Furniture would be display in a series of linked rooms, as they might be in a house. At the top of the three story building a roof terrace will be used to display outdoor furniture.

Restoration Hardware

Read More

Oregon Square returns before Design Commission (images)

Oregon Square has returned before the Design Commission for its second Design Review hearing, with a number of changes made in response a previous hearing held in August. The massive superblock development by American Assets TrustGBD Architects and Place Studio landscape architects will include 940 residential units and 50,000 sq ft of retail, with a new public plaza at its center. Surrounding the plaza will be four buildings, varying in height from 11 to 30 floors.  908 below grade parking stalls will be provided in a below grade parking structure. Over 1,500 bike parking spaces will be provided for the use of residents, visitors and employees.

Oregon Square

Read More

Metro Reports: Tesla Showroom, Restoration Hardware, Castlegate Apartments and more

Restoration Hardware

The NW 23rd Ave Restoration Hardware, as shown at its third Design Advice Request hearing

Every week, the Bureau of Development Services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

Tesla Motors have requested Design Advice and scheduled a Pre-Application Conference for a project at 4330 SW Macadam Ave:

Take existing warehouse building and turn it into vehical sales, service and delivery center of Tesla vehicles.

Winterbrook Planning have requested Design Advice and scheduled a Pre-Application Conference for a renovation to One Pacific Square:

Renovation of existing One Pacific Square. Expanding ground floor lobby to include storefront commercial on Street frontages. New Landscaping.

Early Assistance has been requested for a project at 2645 SE 50th Ave:

New residential apartment building, with underground parking.

Early Assistance has been requested for a project at 4515 NE Fremont St:

Mixed use development to include 50 residential units over retail space and on-site parking.

Anrkom Moisan Architects have requested Early Assistance for a project at 6049 N Interstate Ave:

New 5 story apartment building. 129,772 sq feet 180 units. Tuck under parking with 60 spaces.

Early Assistance has been requested by Fosler Portland Architecture for a project at 1485 NE Alberta St:

New 4-story apartment building with commercial space, lobby on ground floor, 17 apartments abvoe.

Works Partnership have requested Early Assistance for a project at 4235 SE 17th Ave:

Project is proposal for two story residential with ltd retail on grd floor. Needed is written clarification on setback and landscape requirements to continue development.

Strata Land Use Planning have scheduled a Pre-Application Conference to discuss a project at 606 NE 20th Ave:

TYPE 3 DESIGN REVIEW- To develop this site with a 6-story, 54 unit residential building. Ground floor parking and 1 retail space.

Studio 3 Architecture have scheduled a Pre-Application Conference to discuss a project at 751 N Cook St:

New mixed use 5 story building with 50 parking spaces in rear. Commercial & residential units on ground floor, residential units above. Designed to meet Community Design Standards

Anrkom Moisan Architects have submitted the NW 23rd Ave Restoration Hardware for Design Review:

Design Review with 5 modifications to build a new 3-story retail development with rooftop terrace and basement parking garage.

A series of building permits are under review for the Castlegate Apartments at 3001 NE 148th Ave:

Construct new 3 story ( 8 unit) apartment building; building 1 of 7

Construct new 3 story ( 8 unit) apartment building; building 2 of 7

Construct new 3 story ( 8 unit) apartment building; building 3 of 7

Construct new 3 story ( 8 unit) apartment building with attached office building; building 4 of 7

Construct new 3 story ( 8 unit) apartment building; building 5 of 7

Construct new 3 story ( 8 unit) apartment building; building 6 of 7

Construct new 3 story ( 8 unit) apartment building; building 7 of 7

A building permit is under review for a project at 1640 SE Tacoma St:

New 4 story apartment building with 44 units and green roof. Ground floor contains (1) retail space and parking garage. No occupancy for retail space on this permit, interior trash area at parking garage level

A building permit is under review for a project by YBA Architects at 1208 SE Ankeny St:

Construct new 4story with basement, 27 unit apartment building; with associated site work

A building permit was issued to LRS Architects for the Cedar Sinai Park Addition at 6125 SW Boundary St:

Renovation of existing 53,000 sf nursing home with a 44,000 sf addition, new parking lot and site improvements

A series of building permits were issued to Jivanjee Circosta Architecture for a project at 14224 E Burnside St:

Building 1: new 3 story (13 unit) apartment buildilng with laundry and common room; with on site parking, site improvements and site amenities (sports court, play area, and court yard)

New 3 story (12 unit) apartment building

New 3 story (9 unit) apartment building

A building permit was issued to CIDA Architects for a project at 5624 SE 22nd Ave:

Construct new 3 story 15 unit apartment building; 5 units on each fl; with associated site work; and trash enclosure; sprinklers to be standard 13

A building permit was issued for a project at 1803 N Lombard St:

Construct new 3 story apartment building, 12 units, main floor single level units, 2nd floor units have upstairs, trash enclosure attached to east side of building, associated site work included

A building permit was issued for a project at 7007 NE Cornfoot Rd:

New 420,791 sf semi-conditioned shell building and associated site work. Tenant improvements will address conditioned spaces (comments)

The Fair-Haired Dumbbell returns in front of the Design Commission (images)

The Fair-Haired Dumbbell has returned in front of the Design Commission, with a revised strategy for its exterior skin. The 64,700 sq ft office and retail building by FFA Architecture and Interiors for Guerrilla Development was originally intended to be covered in a two different florentine wrapping paper designs. The project is now seeking approval as a blank white canvas to be covered with a hand painted mural, the design of which has not yet been chosen. A condition of approval for the building will require that the mural be approved by the Regional Arts & Culture Council through their public art murals process.

The Dumbbell

Read More

Weekly Roundup: The Woods, MAC Block 7, Post Office Redevelopment and more

The Woods by SolTerra

The Woods by SolTerra

The Design Commission has approved The Woods by developer SolTerra, reported the Portland Business Journal. The N Williams Ave project will include 50 residential units and almost 5,000 sq ft of retail space.

The James Beard Public Market has a new executive director. Fred Granum will replace Ron Paul, who has stepped down due to health reasons.

BikePortland wrote about the potential for protected bike lanes on NW Lovejoy and Broadway, which could form a part of the Post Office Redevelopment.

The Portland Chronicle wrote about a 1923 house in Sellwood at 5624 SE 22nd Ave that was recently torn down to make way for a 3 story apartment building with 15 units.

KGW covered a protest by neighbors of a planned apartment building at 2605 NE 7th Ave. The project has received a building permit, and construction will start soon.

The NW Examiner reported [PDF – page 11] that activity on MAC Block 7 is starting up again. The apartment building will require a change to the zoning on the site, because it will include commercial parking for members of the Multnomah Athletic Club.

Portland is falling behind its goals for affordable housing in North and Northeast Portland, according to a City report covered by The Oregonian.

OHSU Knight Cancer Research Building returns in front of Design Commission (images)

SRG Partnership and Mayer Reed landscape architects have returned in front of the Design Commission for a second Design Advice hearing for the Knight Cancer Research Building. The 7 story research building will include a conference center, research laboratory space, research support functions, ground level retail, and offices. Two levels of below grade parking will be provided. A roof terrace with views to the river will be located at the 6th floor.

OHSU Knight Cancer Research Building

Read More

Grand Belmont returns before Historic Landmarks Commission (images)

Vallaster Corl Architects and Urban Assets Advisors have returned in front of the Historic Landmarks Commission with revised designs for the Grand Belmont. As proposed at the second Design Advice hearing the project would be one floor shorter than in its previous iteration, and would reach a height of 146′. The project continues to consist of one floor of ground level retails, two floors of parking above, and residential apartments at the upper floors. A rooftop deck and clubroom are proposed for the top floor.

Grand Belmont

Read More

Design Advice offered for Zidell Blocks 4 and 6 (images)

The Design Commission has offered Design Advice for two new office buildings proposed for the Zidell Yards in South Waterfront. Zidell Blocks 4 and 6 are being designed by Lever Architecture, in collaboration with GBD Architects and landscape architects Place Studio. The buildings will be among the first to go ahead under a development agreement between the Zidell family and the City of Portland, which could see the public invest $23.8 million towards parks, roads and other improvements. Together with Zidell Block 1, expected to go before the Design Commission in the coming year, the buildings will by 2018 fulfill Phase I of the development agreement.

Zidell Block 4

Read More