Metro Reports: Overland Warehouse Company Building, Marriott City Center expansion, Grant Park Village Phase II and more

Overland Warehouse Company

The Overland Warehouse Company renovation by Emerick Architects

Every week, the Bureau of Development Services publishes lists of early assistance applications, land use reviews and building permits. We publish the highlights.

Emerick Architects have requested Early Assistance for a project at 130 NE 6th Ave:

New five story creative office bldg with retail/restaurant space on ground floor.

SERA Architects have requested Early Assistance for a project at 718 NE 12th Ave:

Multi-story urban self-service storage building with ground floor commercial space.

Urban Development Group have requested Early Assistance for a project at 4926 SE Division St:

New mixed-use building.

Tiland-Schmidt Architects have requested Early Assistance for a project at 1445 N Hayden Island Dr:

New single story retail building with 45 parking stalls on existing vacant pad.

SERA Architects have scheduled a Pre-Application Conference to discuss an expansion of the Portland Marriott City Center at 620 SW Washington St:

Expanison of Marriot Hotel. 4 story adition above the existing parking garage to connect to existing hotel. 127 additional rooms.

YBA Architects have scheduled a Pre-Application Conference to discuss a project at 1134 NW 18th Ave:

Proposal is for mixed use development with retail space on grd floor, a row of townhomes and at-grade double height car parking with stacking semi-automated parking system.

Lever Architects have scheduled a Pre-Application Conference to discuss Framework at 430 NW 10th Ave:

Proposal is for 12 story timber framed bldg which will consist of one level of grd floor retail and five levels of office, five levels of workforce housing and a rooftop amenity space.

LRS Architects have submitted Grant Park Village Phase II for Design Review:

Constructin of a new 5 story market rate housing project with one level of sub-grade parking.

Koz Development have submitted 2161 SW Yamhill St for Historic Resource Review:

See comments in file EA 15-226895 appt. New apartment building consisting of 30 dwelling units. Total of three stories above grade with one below. Requesting a design modification to required setbacks.

A building permit was issued to Emerick Architects for the conversion of the Overland Warehouse Company Building at 205 NW 4th Ave:

Partial change of occupancy from S-1 to B on 2nd and 3rd floor. Seismic upgrade. Extensive interior demolition and new walls on levels 1-3, new storefront. New stairs and elevator.

Weekly Roundup: PDX Concourse E Extension, Grant High Modernization, Redd on Salmon Street and more

Portland International Airport Concourse E Extension

Portland International Airport Concourse E Extension

The Oregonian published images of the Portland International Airport Concourse E Extension, which will be used by Horizon Air. As part of a large project, Alaska Airlines will move from the south side of the airport to the north, while United will relocate from the north to the south.

Portland Architecture made the case for the preservation of Veteran’s Memorial Coliseum, as new study has come out with multiple options for the building.

The Portland Business Journal reported that the office space in Park Avenue West is now entirely leased, with Morgan Stanley taking the final two available floors. Leasing has also begun on the apartment units.

Mahlum have been selected as the architects for the Grant High School Modernization, according to the Hollywood Star News. Construction on the project is scheduled to begin in 2017.

The latest retail tenant at the LL Hawkins and Slabtown Marketplace is the Consolidated Community Credit Union, reported the Portland Business Journal.

A four story, 30 unit mixed use building is proposed for 1515 SE 44th Ave. The Portland Chronicle looked at the existing house on the site, which may or may not be demolished as part of the project.

Thomas Robinson of Lever Architecture was interviewed on OPB’s ‘Think Out Loud’ about Framework, the planned 12 story wood building set to go up in the Pearl.

The Redd on Salmon Street has won a design award for resilience, according to the Portland Business Journal.

The Portland Chronicle covered the history of an industrial building in Sellwood at 8222 SE 6th Ave, set to be replaced by a mixed use development.

Construction on The Ella in South Waterfront is moving into its final phases, according to the Portland Business Journal. The 6 story building utilized a pre-fabricated wood framing system, which minimized construction waste on site.

Weekly Roundup: 12 story wood building, Towne Storage, Zidell Blocks 4 & 6, and more

The proposed 12 story wood building by Beneficial State Bank at 430 NW 10th

The proposed 12 story wood building by Beneficial State Bank at 430 NW 10th

The Oregonian reported that a planned 12 story tall wood building at 430 NW 10th in the Pearl has been awarded a $1.5 million grant by the U.S. Department of Agriculture. The building by Lever Architecture for Beneficial State Bank will utilize Cross Laminated Timber, a structural system that has been proven elsewhere but has been little used in the USA. The USDA grant will help in covering the cost of getting the system approved under the building codes in place in Oregon.

Eater PDX reported that Northwest Portland institution Besaw’s will reopen in time for the holidays, at the LL Hawkins apartment building on Conway Block 296.

At Portland Architecture Brian Libby looked into the fate of Centennial Mills, and asked whether it will be the next historic landmark in Portland to be demolished.

The Portland Business Journal published the first renderings of Zidell Blocks 4 and 6. The two office buildings by Lever Architecture / GBD Architects are scheduled to go before the Design Commission for Design Advice this coming Thursday.

A major renovation and seismic upgrade is planned for the Towne Storage Building. The Portland Business Journal reported that the project will create over 100,000 sq ft of creative office space. A story in the Portland Mercury noted that 52 existing business and 180 renters with mini storage units will be evicted from the building.

A redevelopment of the former Premier Press building at 1440 Hoyt will add 4 new floors to the building, reported the Portland Business Journal. When complete the project will include 75,000 sq ft of Class A office space. A Design Review hearing for the project is scheduled for October 1st.

Mayor Hales is “bullish” on plans to buy the Post Office site in the Pearl, reported KOIN. Conceptual ideas for how the site might be developed were recently released as part of the Broadway Corridor Framework Plan.

Construction is underway on the remodel of the building formerly home to The Oregonian, originally designed by noted architect Pietro Belluschi. When reopened 1320 Broadway will include areas with ceilings up to 28′ high, reported The Portland Business Journal.

The Daily Journal of Commerce published construction photos of Riverscape Lot 8.

The Portland Habilitation Center recently completed work on an apartment complex at 17199 SE Division St, reports the Portland Tribune. By keeping costs low, the buildings were built for $65,000 a unit; far below the $200,000 a unit cost typically associated with publicly funded affordable housing. In the article Rob Justus of the PHC asks why the Portland Housing Bureau hasn’t gotten behind their alternative method for delivering affordable housing.

Weekly Roundup: Oregon Zoo, PNCA, Block 136 and more

Zidell Yards

Zidell Yards

  • The Design Commission approved designs for Block 136 and the 19th & Overton.
  • The Portland Development Commission is moving working on finalizing a Development Agreement with ZRZ Realty for Zidell Yards. The Portland Business Journal reported that the main areas still to be worked concern affordable housing and a new park. The Oregonian obtained a draft memo from the Portland Housing Bureau, which asked whether the Zidell family had “no desire” to develop affordable housing.
  • Beneficial Bank is considering redeveloping property it owns at 430 NW 10th Ave in the Pearl with an 11-story wood building. The property is currently occupied by a branch of Albina Bank.
  • Construction is underway on the Burnside Bridgehead Block 75, designed by Works Partnership. The Portland Business Journal reported that a formal groundbreaking is scheduled for Thursday January 29th.
  • The Portland Chronicle published photos of the church at 5000 SE Lincoln set to be demolished, to allow the construction of new townhomes.
  • A 2,000 sq ft visitor center at the Oregon Zoo Elephant Habitat will be the first building in the state to use Cross Laminated Timber, as reported in the Portland Business Journal.
  • Brian Libby of Portland Architecture had a first glimpse of the PNCA 511 Building, set to open soon. Next Portland published an article about the building earlier this week.