Metro Reports: Holman 42, Lloyd West Anchor, Collective Oregon Eateries, and more

Holman 42

A building permit was been issued for Holman 42, which will include 59 units of affordable housing.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers November 12th to November 18th, 2018. 

Early Assistance has been requested by Baysinger Partners for a project at 1401 N Hayden Island Dr:

Construction of 3,000 sf convenience store and 6 station (12 pump) vehicle fueling area.

A Pre-Application Conference has been scheduled by Ankrom Moisan Architects to discuss a project at 701 NE 7th Ave:

Proposal is for a new 7 story mixed use project. 5 over 2 construction. 2 levels of Type 1 parking surrounded by mixed use-programming over 5 stories of Type III construction residential dwelling units with a mix of studio, 1bd, 2bd and 3bd units. Ground floor includes parking entry, retail and residential amenities such as residential lounge, fitness area, leasing offices, bike storage; pet area and wash. Proposed stormwater disposal will connect to public sewer. Approximately 200 units per block

The Lloyd West Anchor Remodel has been submitted for building permit review by Waterleaf Architecture:

Proposed selective demolition of portions of the 3-story West Anchor building (Former Nordstrom’s). Work includes removal of the existing 3rd story, clerestory lantern structure & roof structure. Interior structural demo & removal of existing brick veneer, storefornts &canopies. Exterior work includes removal of existing plaza structure, walls and paving for building renovation.

Renovation of existing 3-story, 150,000 square foot tenant space at the Lloyd Center Mall (Former Nordstrom’s). Changes to the exterior façade and plaza are proposed.

The Alder.9 Apartments at 820 SE Alder St have been submitted for building permit review:

9 story mixed use buidling with 176 residential untis over ground floor retail and mechanical parking

A project at 4946 N Vancouver Ave has been submitted for building permit review by Allusa Architecture:

New 3 story, 5 unit hotel with office space on first floor, attached trash enclosure and ecoroof

A building permit was issued to Carleton Hart Architecture for Holman 42 at 6370 NE 42nd Ave:

New 3-story, 59-unit apartment building with lobby, management office, resident services, community spaces and bike storage.

A building permit was issued for a project at 5080 NE 33rd Ave:

New 3 story 12 plex apartment bldg w/18-174200-mt – 56sq ft trash enclosure

A building permit was issued for a project at 4730 SE Belmont St:

Construct new 3 story, 12 unit apartment building with 56 s.F. Detached trash enclosure, includes associated sitework

A building permit was issued for a project at 6940 SE Long St:

New 3-story 15 unit apartment building includes associated site work; cesspool decommissioning reqd septic decommissioning required. Call for inspection 842

A building permit was issued for the Collective Oregon Eateries at 3612 SE 82nd Ave:

New construction of 8500sf single story building with mezzanine. New core and shell building for up to 9 restaurant tenants on property. Site work to include new infrastructure and parking lot repairs to accommodate 16 food carts seating areas, and required parking separate electrical, mechanical, and plumbing permits required.

Metro Reports: SW 1st & Ash, 815 W Burnside St, Hoyt Street Yards Block 23, and more

815 W Burnside St

A building permit is under review for 815 W Burnside St, the first proposal in the Central City to approved that is subject to the city’s Inclusionary Zoning ordinance

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers October 29th to November 4th, 2018. 

Design Advice has been requested by Ankrom Moisan Architects and Alliance Realty Partners for Hoyt Street Yards Block 23 (bound by NW 13th, Raleigh, 12th and Quimby):

Proposed project is a senior living community with 110 units of R-2 occupancy independent senior living, 131 parking stalls in below-grade parking with total GSF of 296,500 with 42,000 of that amount being below-grade parking. Active uses will be provided along 13th Avenue (per 33.510.225). Those may be lobby, bistro, admin offices, salon or other similar uses complimentary to the community and to development objectives stated for NW 13th Ave.

Early Assistance has been requested for a project at 6715 SW Multnomah Blvd:

New 2 story 6 dwelling unit apartment building on existing .68 acre site with existing house and commercial building to remain

A Pre-Application Conference has been scheduled by ZGF Architects to discuss a project at SW 1st & Ash:

Construction of a new 5-story building (57,000 gsf). Multi-use tenants will include retail and building support spaces on level 1. Office space levels 2-5.

A Pre-Application Conference has been scheduled by Morningstar Senior Living to discuss a project at 3150 NE Sandy Blvd:

The proposed five-story development is composed of assisted living and memory care units in a single building each caring for the specific needs of its residents. The building interior design provides for an abundance of amenities, which include the following: common dining spaces and serving areas, activity areas, art studio, theater, chapel, cafes, lounges, a fitness and activity center, beauty salon/barber shop, private dining for family events and central kitchen for chef-inspired meals. Assisted living and memory care each have their own individually landscaped courtyard.

A project at 6936 N Greenwich Ave has been submitted for building permit review:

New 3 story – 12 unit apartment building and associated site work*****demo permit 18-242483-RS****

815 W Burnside St has been submitted for building permit review by Ankrom Moisan Architects:

Multi-use building with 138 residential apartments on levels 2 thru 6 (90,775 sf), residential amenities on ground floor and roof deck (4,305 sf), retail spaces on ground floor (8,785 sf), and 49 spaces of below grade parking. Type 1A construction from bottom of garage to top of slab of level 3. Type 3A construction from top of slab of level 3 to roof.

A project at 121 N Beech St has been submitted for building permit review by Fieldwork Design & Architecture:

New 4 story mixed use building; shell only with ground floor retail; associated site work

A project at 16119 SE Stark St has been submitted for building permit review:

Construct new 11,993 sf single story retail building. Phase 1- construct north portion and one tenant space occupied as pawn shop and 3 tenant spaces not occupied this phase. Phase 2- demolish existing adacent structure in permit 18-260694-CO. Phase 3- construct south portion of building with one occupied pawn shop tenant, parking lot and site work. One phase 1 tenant space to be occupied as dispensary in phase 3. See comments.

A building permit was issued for a project at 420 NE Simpson St (previously 432 NE Simpson St):

Construct new 3 story (12) unit apartment building with associated site work

A building permit was issued for a project at 14775 NE Couch St:

New 30 unit multi-family housing complex of 3 story buildings with lower level private garages, bike parking: this building contains 24 units. Trash enclosure under 120 sq ft. Included associated site work.

A building permit was issued to Ankrom Moisan Architecture for a project at 2350 SE 60th Ave (previously 6125 SE Division St):

Construct new care facility with underground parking and living care facility on main floor; associated site work

Metro Reports: N Williams Center, Canvas at the Press Blocks, Riverplace Redevelopment, and more

Press Blocks

A building permit has been issued for the first phase of the Press Blocks, the 8-story Canvas office building.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers October 15th to October 21st, 2018. 

Early Assistance has been requested by GBD Architects for the Riverplace Redevelopment at 0150 SW Montgomery St:

Proposal is for a master plan development and possible land division of approx. 8 acres.

Early Assistance has been requested by Salazar Architect for a project at 6723 NE Killingsworth St:

4-Story, 140 Unit affordable housing project with 3 floors of residential over on-grade parking, community space and additional residences. The project will also feature a mid-block pedestrian crossing and public plaza facing Killingsworth. On-site storm water disposal will be accomplished through dry wells.

A project at 9720 SE Holgate Blvd has been submitted for building permit review by Mentrum Architecture:

New 2 story 3 unit apartments. each unit with attached garage and driveway and associated with site works.

A project at 1627 N Willis Blvd has been submitted for building permit review by Fosler Portland Architecture:

Construct new 3 story (31) unit apartment building with associated site work and bike storage area in basement

A project at with two buildings at 2242 SE 158th Ave has been submitted for building permit review by Partin & Hill Architecture:

Construct new 3 story (16) unit apartment building

Construct new 3 story (16) unit apartment building with associated site work

The N Williams Center at 2156 N Williams Ave has been submitted for building permit review by Ankrom Moisan Architecture:

New 5 story Type III B affordable family apartment building

A building permit was issued to Partin & Hill Architecture for a project at 14755 NE Couch St:

Building 3 of new 30 unit multi-familly housing unit complex; this building contains 3 units; 3 story buildings with lower level private garages. Included associated site work.

A building permit was issued to Studio 3 Architecture for a project at 5120 N Lombard St:

New 3 story 18 unit apartment building with enclosed trash/recycling area and associated site work

A building permit was issued for a project at 1801 N Rosa Parks Way:

New 3 story 18 unit apartment building, includes associated sitework *** no revisions to original plans allowed, see comments 10/18/18 and IQ folder 18-254905-iq ***

A building permit was issued to GBD Architecture for Canvas at the Press Blocks:

New 8 story office building with 1.5 levels of below grade parking

815 W Burnside St Approved by Design Commission (images)

The Design Commisson has approved a mixed use building at 815 W Burnside St. The 7 story building is being designed by Ankrom Moisan Architecture for LMC Development, and will include 138 residential units, ground-floor commercial space, 50 below-grade parking spaces, and a rooftop outdoor deck. 214 bicycle parking stalls will be provided, split between 84 racks in ground floor bicycle rooms and 130 in-unit racks.

815 W Burnside St

Read More

Grand Avenue Mixed Use Apartments go in front of Design Commission (images)

A proposed development in the Central Eastside has gone in front of the Design Commission for three Design Advice Request (DAR) meetings. The 8-story Grand Avenue Mixed Use Apartments are being designed by Ankrom Moisan Architecture for developer Fairfield Residential. As presented at its most recent DAR, the project would include 170 residential units, over approximately 5,000 sq ft of retail space. 51 vehicular parking spaces would be provided in a garage, located partially below grade. The building will be subject to the city’s inclusionary housing rules, which require the provision of affordable housing or the payment of a fee-in-lieu.

203 NE Grand

Read More

Metro Reports: 13th & Johnson, 11505 NE Yacht Harbor, 4509 N Montana, and more

A building permit is under review for the NW 13th & Johnson apartments

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers September 24th to September 30th, 2018. 

Early Assistance has been requested by McGuirl Designs & Architecture for a project at 4509 N Montana Ave:

Construction of three 3-story buildings. 113 units total. No parking proposed. On-site UID for stormwater management. Utilizing community design standards specified within 33.218.140.

Early Assistance has been requested by Ankrom Moisan Architects for a project at 11505 NE Yacht Harbor Dr:

Proposal is for a 221 unit age restricted retirement housing as 5-stories Type II wood over Type 1pt deck/parking garage. Small retail space along with supporting common areas for residents placed throughout the building. The building is proposed with surface and garage parking. Total gross square foot of building is approximately 296,000 gsf. Stormwater will be flow to proposed catch basin/Peak flow storm filter to storm drain lines.

Early Assistance has been requested for a project at 904 SE Division St:

Scope of work is for a new NW Natural Response / Service Center facility not open to visitors. The project site is approximately 4.35 acres. A large portion of the site will remain undeveloped, we have assumed 1.5 acres. The project scope consists of a 3 story industrial response / service center facility, 1 story warehouse storage building, trash enclosure and canopy, fuel tank and canopy, pipe storage 3-sided shed with (3) storage garages and a spoils bins 3-sided shed. Including on-site work and public street improvements for the NWN facilities, parking lot design and bio-swale for stormwater management.

Early Assistance has been requested by Edge Development for a project at 7433 N Chicago Ave:

Construction of two, 3-story multi family residential buildings (12 units in one building, 9 units in the other – for a total of 21 residential units). Will meet community design standards.

A Pre-Application Conference has been scheduled by Leeb Architects to discuss a project at 1500 SW Taylor St:

The proposed project design consists of 100 Residential Apartments on seven floors. Proposal to create a sister building to the 930 SW 15th project across the street. The ground floor includes the lobby, housing units, commercial spaces, a mechanical trash area and parking for 30 cars. The second through the seventh floors includes apartments and a roof top patio and green roof. Site Area = 15,168 SF (.35 acres) The total gross square footage is 74,780. The Development will connect to existing water & storm water pipes in SW Taylor Street.

The NW 13th & Johnson Apartments have been submitted for building permit review by TVA Architects:

7 story, 38,198 sq. Ft. Multi-family mixed use, first floor retail shell, 2-7 floors 59 unit apartments and associated site work. With permit # 18-244052-MT

The Dean River at 3318 SE 16th Ave has been submitted for building permit review:

New 4 story 72 unit multi-family apartment building to include associated site work

A project East of 15935 SE Division St has been submitted for building permit review by AAI Engineering:

New 3 story self storage building with office and accessible bathroom on the main floor with associated site work

A building permit was issued to Hacker Architects for the The Intersection on the Adidas campus at 5055 N Greeley Ave;

new addition between buildings B and C on the West side fo the Adidas village campus

A building permit was issued for the Raleigh 22 apartments at 2222 NW Raleigh St:

New, 6-story housing project with 173 dwelling units, below grade parking garage with 140 parking spaces and 7 EV ready parking spaces, retail space and residential amenity spaces.

A building permit was issued to Frixione Design for a project at 2730 SE Gladstone St (previously 4107 SE 28th Ave):

New 1 story restaurant on existing parking lot including seating area, kitchen, storage, toilet, trash room, bike parking, ramps and upper and lower deck patio. Infill existing driveway ***no occupancy in this permit***

Metro Reports: Nomad, 1921 SE 3rd, 1710 NE Multnomah, and more

Nomad 1431 N Church St

The Nomad development, as presented to the Design Commission at a Design Request Advice meeting on September 20th. The 130-unit development is being designed by Works Progress Architecture.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers September 10th to September 16th, 2018. 

Early Assistance has been requested by Scott Edwards Architecture to for a garage at 1988 SE 3rd Ave, intended to serve the office development at 1921 SE 3rd Ave: 

Proposed 4-story parking garage with approximately 120 parking spaces that will serve the proposed industrial office building across the street at 1921 SE 3rd Ave. This parking structure will be open with natural ventilation of most likely concrete construction. A new driveway is proposed near the northwest corner of the lot onto SE 3rd Ave for access. There should be enough landscape area remaining to take care of stormwater plus any additional drywells under the parking are if required. See EA 17-165761 for information on the office building development.

Early Assistance has been requested by Concord Hospitality Enterprises for a project at 1710 NE Multnomah St:

Demo aging existing 180+ room extended stay hotel and replace with approximately three hotel brands equaling 450 rooms.

Early Assistance has been requested by Ankrom Moisan Architects for a project at 2148 NE Martin Luther King Jr Blvd:

Construction of a new 3-story office building (approximately 30,000 SF). Two retail locations within the building along MLK on north and south corners. Public parking proposed on R101769. Private parking below level 2. All parking is surface parking. Proposed disposal of stormwater to be infiltration on site.

Early Assistance has been requested by Edge Development to discuss a project at 5665 NE Glisan St:

Demolish two existing single story garages and construct three, 3-story multi-family residential (30 units total).

Early Assistance has been requested by Fosler Portland Architecture for a project at 9501 N Ivanhoe St:

This is a zoning inquiry prior to proposing a project. Option 1 is to renovate the existing non-confirming use (grocery store to remain) plus a new 2nd floor ddition for one apartment. Option 2 is to replace the building with a new building to contain ground floor commercial and 2nd floor residential. No development is being proposed at this time.

A project at 5321 NE 13th Ave has been submitted for Type II Conditional Use Review:

Demolish existing structure and construct a new 5-unit multi-family building. Property was originally part of a Conditional Use Review (07-108596).

Nomad at 1431 N Church St has been submitted for Type II Design Review by Works Progress Architecture:

Proposed development is for a seven story building occupying a half city block at N Interstate Ave btwn N Church and N Maryland Ave. The site currently has four structures that will be removed. The proposed building use includes at-grade surface parking, with retail lobby, residential amenities and a residential unit at grade. The next floors with consist of six levels of residential units above.There will be a large shared kitchen,gathering room and covered outdoor space on the 6th floor. Parking and loading access to the site will be from N Maryland Ave along the east edge.

A building permit was issued for a project at 1213 N Alberta St:

Construct new (3) story 14 unit apartment building with bike storage and trash area on level 1; associated site work

Design Advice Offered for 815 W Burnside St (images)

A proposed development at 815 W Burnside St has gone in front of the Design Commission three times to receive Design Advice. The 7 story building is being designed by Ankrom Moisan Architecture for LMC Development, and would include 144 residential units, ground-floor commercial space, 50 below-grade parking spaces, and a rooftop outdoor deck.

The project could be the first Central City development to be approved that is subject to the city’s Inclusionary Housing requirements, which were introduced in February 2017. Buildings in the Central City are required to provide either 10% of the units at prices affordable to people earning 60% of area median income or 20% of the units at prices affordable to people earning 80% of area median income.

815 W Burnside - Ankrom Moisan

Read More

Metro Reports: ART Tower, Rothko Pavilion, Adidas Intersection, and more

ART Tower

The 304 unit ART Tower is proposed for the north half of the Artist Repertory Theatre block in Goose Hollow.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers July 2nd to July 8th, 2018. 

Early Assistance has been requested by Guerrilla Development for a project at 3839 NE Killingsworth St:

Convert a warehouse/storefront building with existing church use into a six (6) one-bedroom loft style residential units with shared and private courtyards. Courtyards will be created by removing portions of existing roofing. 20% unit density increase to be achieved through amenity bonuses.

A Pre-Application Conference has been scheduled to discuss a project at 144 NE 97th Ave:

Proposal is for a multifamily project designed to maximize site efficiency and provide high-quality, family size housing. Project contains two, 4-story buildings totaling 64 units on 3 x RX lots. Project includes 24 x 3 bedroom units (bu), 6 x 2bu, 32 x 1 bu, and 2 studios. Parking is .4 to 1 (26 stalls). A leasing office and bike storage are onsite. Stormwater management to be achieved onsite using category 1 and 2 methods, including roof drainage to a drywell and parking lot to biofiltration devices, including but not limited to infiltration swales and/or basins

The Portland Art Museum Rothko Pavilion at 1219 SW Park Ave has been submitted for a Type III Historic Resource Review and a Type II Conditional Use Review by Hennebery Eddy Architects:

New 3-story pavillion connecting the existing North and South Portland Art Museum Buildings. There will also be a new loading area along SW Jefferson St, which requires a separate driveway design exception (per PBOT).

The Oregon Harbor of Hope at 1201 Northwest Naito Parkway has been submitted for Type II Design Review:

Construction of the Navigation Center, a short-term shelter and resource center for Oregon Harbor of Hope.

The ART Tower at 1515 SW Morrison St has been submitted for Type III Design Review by Ankrom Moisan Architects:

Proposal to demolish portion of existing building on nw quarter of the block and surface parking lot at NE quarter of the block. New construction of 21 story mixed use residential building on the north half of the block. Retail, lobby and amenities at the ground floor. Parking below grade.

A new Type III Design Review Application for the Lloyd West Anchor Remodel has been submitted by Waterleaf Architecture:

Renovation of existing retail mall anchor to accommodate multiple tenants, increasing the existing height by one story. The renovation includes the SW corner of the existing mall known as Block A and the exterior facade remodel and plaza/yard improvements on the south, west, and north sides of existing building. One modification requested to the bicycle parking standards.

The Intersection on the Adidas campus at 5055 N Greeley Ave has been submitted for building permit review by Hacker Architects:

new addition between buildings B and C on the West side of the Adidas village campus

Metro Reports: Adidas Campus Expansion, Tree Farm, 555 SE MLK, and more

Image of one of the three new buildings by Lever Architecture’s proposed at the Adidas Campus, as seen from the corner of N Sumner and Delaware.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers June 18th to June 24th, 2018. 

Design Advice has been requested by Holst Architecture for a project at 2310 N Hunt St:

DESIGN HEARING – Design Advice Request for 42 dwelling units in four building with surface parking and associated site landscape elements. Stormwater will be managed on site.

Early Assistance has been requested for a project at 2628 SE Belmont St:

Demolish existing building and construct a new 4-story, 44-unit, apartment building with retail on the first floor.

A Pre-Application Conference has been scheduled by BBL Architects to a discuss a project at 725 NE 100th Ave:

Pre-application conference for a proposed elementary school in David Douglas school district.

A Pre-Application Conference has been scheduled by Works Progress Architecture to a discuss a project at 1431 N Church St:

Proposed new mixed use apartment complex approx 90,000 GSF with six levels of apartments above one level of retail and building amenity space.

The Adidas Campus Expansion was submitted for Type II Design Review by Lever Architecture:

Proposal is for three new buildings, site work, right of way work, renovation to existing plaza, new landscaping and relocation of the Adidas Village arrival drive to create a cohesive intersection at N. Greeley Ave.

A project at 203 NE Grand Ave was submitted for Type III Design Review by Ankrom Moisan Architects:

New construction of an eight story mixed use building with one level of underground parking. Approximately 170 apartments on levels 2-8, 5,500 SF of retail on ground floor. Amenities include a lounge, fitness, leasing, bike storage, pet area and wash.

A project at 6123 N Lombard St was submitted for building permit review by FFA Architecture & Interiors:

New 4 story mixed use apartment building with 46 living units and retail space and garage parking

A building permit was issued for a project at 1415 SE Pardee St (formerly 4540 SE Milwaukie Ave):

Construction of new 4 story apartment building (44 units); garage on first floor;

Building permits were issued for a project at 3445 SE Gladstone St:

Bldg A – 1 of 3 new buildings w/ (E) building to remain, all on same lot – 2 story- with basement – 7 unit apartment building w/ onsite parking, includes associated sitework *** w/ detached trash enclosure 17-248414-CO & 17-248408-MT***

Bldg B – 2 of 3 new buildings w/ (E) building to remain, all on same lot – 2 story with basement , 8 unit apartment building *** w/ 17-248411-MT ***

A building permit was issued to Hacker Architects for a project at 555 SE Martin Luther King Jr Blvd:

New construction of six(story (above ground) building consisting of 90,400 SF with one level of underground parking consisting of 15,490 SF; five levels of office over ground floor retail , CLT floor system.

A building permit was issued for Tree Farm at 826 SE 3rd Ave:

New 6-story commercial building; 1st floor future retail tenant, lobby and trash room; floors 2-6 F2 occupancy; and associated site work, no occupancy this permit *** mechanical permit 17-196436 MT***