Weekly Roundup: Ankeny Blocks, relocation of Jimmy Mak’s, closure of Sewick’s and more

Ankeny Blocks

Concept image for the Ankeny Blocks in Downtown

Goodman family controlled Downtown Development Group released a concept for the Ankeny Blocks, an ambitious $1.5 billion redevelopment of 11 surface parking lots between the Morrison and Burnside Bridges. According to the story in The Oregonian the intent is to “enter into long-term land lease agreements with developers and investors once an agreement for a project is reached.”

Jazz club Jimmy Mak’s will be relocating to make way for an 11-14 story residential development at 205 NW 11th Ave, reported the Willamette Week. A Design Advice Request hearing for the SERA-designed project is currently scheduled for March 17th.

Also in the Willamette Week was the news that Sewick’s bar on SE Hawthorne will close on Sunday January 31st. The building at 4917 SE Hawthorne Blvd will be torn down by Urban Development Group to make way for a 46 unit apartment building.

The Portland Chronicle wrote about the pending demolition of a commercial building at 1015 NW 16th Ave, set to be replaced by a 153 unit by WDC Properties. The currently vacant property was home to live music venue Slabtown until it closed in 2014.

The Portland Business Journal interviewed Robert Barton, CFO of American Assets Trust. The company recently completed the GBD Architects designed Hassalo on Eighth development, and is currently working on Oregon Square follow up project.

The Oregonian wrote that Royale Brewing will open a new bar named the Garrison in the Two/Thirds development. The St Johns retail, office, and residential project by Guerrilla Development will also include a second location of The Sudra vegetarian restaurant.

Tech company GuideSpark will lease the entire two floors of office space above the Pine Street Marketaccording to The Portland Business Journal.

Oregon Square, part IV: Block 90 (images)

This post is the second in a series on Oregon Square, focusing on Block 91. See also Part I about the urban design and landscaping, Part II about Block 91, Part III about Block 102 and Part V about Block 103.

Rising to a height of 244′-8″, Block 90 will be the second tallest of the four buildings planned for American Assets Trust’s Oregon Square development. The 21 story tower will include 274 residential units and over 14,000 sq ft of ground floor retail. A rooftop terrace will be located on top of the podium form at the 6th floor. The entire 21st floor will be dedicated to amenity functions, including a community room, spa, fitness center, yoga room, private dining room and an exterior terrace. The architects for the project are GBD Architects, who are working with PLACE for the landscape design.

Oregon Square Block 90

Read More

Works Partnership present 19 story Burnside Bridgehead tower to Design Commission (images)

Works Partnership have gone before the Design Commission with a design for a 19 story tower on Block 75 of the Burnside Bridgehead. The proposed building would include 85 to 90 to residential units above commercial space. Parking is planned at 1:1 ratio in a mechanical parking system with storage at levels 3 and 4.

Block 75 Phase II

Read More

Metro Reports: 3rd & Salmon, Pearl Block 20, Seven Corners Community Collaborative and more

3rd & Taylor

The proposed hotel at SW 3rd & Taylor

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Boora Architects have requested Design Advice for Pearl Block 20:

Block 20 is a proposed hi-rise condominium building. One-hundred forty-two units are included in a five floor podium and 20 floor tower.No retail is proposed for this project. All parking is above grade and surrounded by units.

Allusa Architecture have requested Early Assistance for a project at 6805 SE 52nd Ave:

Build two new 3-story apartment buildings with no basement. One structure will be 18 units. The other structure will be 12 units.

Urban Development Group have requested Early Assistance for a project at 4917 SE Hawthorne Blvd:

New 46-unit mixed use apartment building with 2700 sq ft of commercial.

Early Assistance has been requested for a project at 700 SE Belmont St:

New self-storage facility. Existing structure(s) to be demo’d/removed.

Works Partnership have requested Early Assistance for a project at 224 SE 2nd Ave:

Proposed change of existing warehouse to office use with retail on ground floor. Also a proposed addition to the building of one story penthouse for residential occupancy. See EA 15-216040.

Studio 3 Architecture have submitted a project at 7924 SE Milwaukie Ave for Design Review:

See EA 15-242170 appt and CO 16-100215. New two story four unit apartment structure behind existing single family residence which will remain.

Ankrom Moisan Architects have submitted the hotel portion of the 3rd and Salmon development for Design Review:

Proposal for joint development of boutique hotel with 245 guest rooms and on site fitness center and conference center. Project will include ground floor and rooftop retail space. One modification needed for ground floor window and 1 adjustment needed for number of loading spaces.

Waterleaf Architecture have submitted the Seven Corners Community Collaborative for Historic Resource Review:

Proposed project is a four story commercial building consisting of one story of ground floor retail space and secured parking below three stories of office space.

Mentrum Architecture have submitted a project at 6205 N Minnesota Ave for building permit review:

Construct new 3 story (18 unit) apartment building with partial basement; attached trash enclosure and associated site work

A building permit was issued to Fosler Portland Architecture for a project at 7247 N Leavitt Ave:

New three story, 20 unit apartment complex; on site bike parking and trash enclosure; no onsite parking

A building permit was issued to HC Architecture for The Porter Hotel:

new 16-story, 299 guestroom hotel includes first floor full service restaurant, market cafe; second floor 5,000 sf meeting room with outdoor terrace; rooftop restaurant and covered terrace. One level below grade with shoring includes gym facilities, locker rooms, pool and back of house activities.

 

Weekly Roundup: Albina Yard, Slate, Doernbecher Children’s Hospital and more

4703 N Albina

Construction is underway on the Albina Yard office building, which is using Cross-laminated Timber

Venerable restaurant Besaw’s reopened last week at the LL Hawkins apartment building in Slabtown. Eater PDX published photos of the new interior.

History Treasured & Sometimes Endangered wrote about the demolition of a number of houses in order to make way for a mixed use development at 2301 NW Savier. The new building by GBD Architects will wrap around the building that was formerly home to Besaw’s restaurant.

BikePortland reported that a “gear sphere” sculpture was set to be installed outside the under construction Cook Street Apartments by LRS Architects.

OHSU is in the early stages of planning for a major expansion of the Doernbecher Children’s Hospital, according to a story in the Portland Business Journal.

The Portland Chronicle wrote about the potential demolition of a building at 3336 SE Belmont St, slated to be replaced by a three-story mixed use building by BKL/A Architecture.

Construction is about to begin on the Works Partnership designed PDX Commons senior co-housing at SE 43rd and Belmont. The site was formerly the location of the Good Food Here food cart pod. As The Oregonian reports more than half of the carts have now relocated across the street to form the Bite on Belmont pod.

As the Pine Street Market gets ready to open The Oregonian published their ultimate guide to the vendors planned for the Old Town food hall.

Portland Architecture published their notes from the Centennial Mills public forum, which explored how the historic building complex might still be saved.

The developers behind 3rd and Taylor have laid out their plans for the block, wrote the Portland Business Journal. The design review package for the hotel portion of the project has been submitted by Ankrom Moisan Architects. The office building is planned to move forward separately in the coming months.

In [mis]representation Places over Time wrote about the tools architects use to visualize their designs, how these can shape the design itself, and how it is easy to present a false sense of reality.

Coworking firm CENTRL Office will expand into the Slate building at the Burnside Bridgehead Block 75, according to a story in the Portland Business Journal. The 10 story building by Works Partnership is scheduled to open later this year.

Construction is underway at the Lever Architecture designed Albina YardThe 4 story office building is the first commercial building in the United States to make use of domestically fabricated Cross Laminated Timber as a structural element. A video posted last week shows the progress made so far:

Landmarks Commission approves NW 23rd Ave Restoration Hardware (images)

After three Design Advice hearings and two Design Review hearings, the Historic Landmarks Commission has approved designs for a new Restoration Hardware building on NW 23rd Ave. The building by Ankrom Moisan Architects will be modeled on the store’s ‘Gallery’ concept, where furniture is display in a series of linked rooms as they might be in a house. A grand staircase will rise through the three story building, up to an open air pavilion and roof terrace where outdoor furniture will be displayed. Below-grade parking for 18 vehicles will be provided.

NW 23rd & Glisan Restoration Hardware

Read More

Design Approved for First Tall Cross-laminated Timber Building in America (images)

Designs have been approved for Carbon12, an 8 story building planned for N Williams Avenue. The designers of the project, PATH Architecture, expect that the 85′ tall structure will be the first tall building in the USA built using Cross-laminated Timber (CLT) as its structural system. The building will include 14 residential condominium units, as well as two ground floor retail units. With floorplates much skinnier than is typical in multifamily buildings Carbon12 will include only two residential units per floor. 22 parking spaces will be provided in a below grade mechanized parking system.

Carbon12

Read More

Metro Reports: 1685 SE Umatilla, NW 13th and Glisan, 710 E Burnside and more

17th & Umatilla

1685 SE Umatilla by Myhre Group Architects

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits. We publish the highlights.

Mackenzie have requested Design Advice for a project at NW 13th and Glisan:

Design Advice Request for a new 6-story mixed use building.

Polyphon Architecture and Design have requested Design Advice for a project at 710 E Burnside:

Proposed 11-story mixed use building.

Baysinger Partners have requested Early Assistance to discuss the conversion of a building at 8000 NE Tillamook:

Project will remodel the existing building with 33,100 sf grocery user, 51,000 sf office use and 50 residential units. Two new retail pad buildings will be constructed totaling 23,000 sf.

WDC Properties have requested Early Assistance to discuss a project at 233 NW 16th Ave:

Remove existing building. Construct a new multi-story mixed-use building with on site parking. Onsite storm water disposal. Intending to meet the community design standards.

Brett Schulz Architect has requested Early Assistance to discuss a project at 8307 N Ivanhoe St:

Proposed 3 story apartment building with 14 units and retail space. Wants to meet community design standards.

Robert Freeman Architecture have requested Early Assistance to discuss a project at 8150 N Lombard St:

Proposed two story apartment complex with 16 units, no onsite parking. Would like to meet community design standards.

A building permit was issued to Urban Development Group for a project at 1685 SE Umatilla:

New 4 story wood frame apartment building with underground parking ; basement parking to include new bike storage, trash enclosure, dog wash room, and 3 apartment units;

 

Building at NW 19th & Quimby goes before Design Commission (images)

SERA Architects have gone before the Design Commission with plans for a new mixed use building at NW 19th & Quimby. The project by Urban Asset Advisors would include 90 residential units, 2 live/work units at the ground floor and a 1,200 sq ft retail space. Parking for 50 cars would be provided, 34 of them in a mechanized system. Parking for 120 bicycles will be provided, primarily via racks located in the units. A common room and exterior roof terrace for the use of the residents will be provided at the 6th floor.

19th & Quimby

Read More