OMSI Masterplan Receives Design Advice (images)

A masterplan for the redevelopment of the land surrounding the Oregon Museum of Science and Industry has gone in front of the Design Commission to receive Design Advice. Up to two million square feet of development could be accommodated on the site, with a mix of uses that are complementary to OMSI’s operations, including residential and commercial uses. The masterplan is being designed by ZGF Architects, building on earlier work by Snøhetta. Gerding Edlen is acting as development advisor.

OMSI Masterplan
Read More

Metro Reports: Cathedral Village, Division 28 Homes, 2508 SE 32nd, and more

Cathedral Village is one of the developments that was recently awarded funding through the City of Portland’s Housing Bond. The development by Catholic Charities will include 110 affordable homes, with a mix of studio, one-, two- and three-bedroom apartments.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers October 14th to October 20th 2019.

Early Assistance has been requested for a project at 5106 N Lombard St:

Keep the existing 1902 structure, and build a 20-unit, 5-story apartment behind the existing structure.

Early Assistance has been requested by EPR Design for a project at 2425 NE Alberta St:

Demo house and construct a 4-story building with the 1st level use as commercial. The top 3 stories will be 30 apartment units. No parking on-site. 10′ landscape buffer at the north property line with a 30×20 shared outdoor space. Most units will also have private outdoor space.

Early Assistance has been requested by MWA Architects for Cathedral Village at 8614 N Crawford St:

4 story apartment building with 110 affordable family apartments. The unit mix will be (11) 3 bedroom, (45) 2 bedroom, (39) 1 bedroom and (15) studios. There will be resident services in the ground floor and 48 parking spaces. There is a partial basement level at the SW corner of the building that will house bike parking and storage.

Early Assistance has been requested by Brett Schulz Architect for a project at 6950 N Maryland Ave:

New construction of a multi-family residential development on two adjacent lots. Each development will be comprised of two separate buildings at 3 stories tall with approx 30 unit max of studio & 1-bedroom apartments. Stormwater disposal for both lots will be drywells.

The Division 28 Homes at 2865 SE Division St have been submitted for a Type III Design Review by Hacker architects:

10-unit (approximately 37,000 sf) multi-family project with ground floor retail and 15 parking spaces. Below-grade parking is accessed from SE 28th Place. Outdoor space is provided in individual terraces and a common rooftop deck. Modifications requested to the setback (33.130.215) and pedestrian standards (33.130.240).

A project at 2510 NE Sandy Blvd has been submitted for building permit review by Brett Schulz Architect:

Demo north portion of existing building. Change of occupancy S-1/B to F-1/B, tenant improvements in remainder of building for all tenant spaces, new mezzanines and detached trash enclosure less than 120 sf; seismic attachement of roof to walls, interior shear walls.

A project at 11025 NE Sandy Blvd has been submitted for building permit review by EMA Architecture:

Construct new one story building to include; multi purpose room, mechanical room, three new restrooms; and kitchen; exterior new patio on north side of building new play field and associated site work to include; reconfigure existing parking; new walkway; widen existing driveway on north side; close driveway on SE corner and reconfigure landscaping ***mural under separate permit***

A building permit was issued to Quilici Architecture & Design for a project at 2508 SE 32nd Ave (previously 3212 SE Division St):

New 4-story w/basement, 32 unit apartment building, includes associated site work. ***separate mechanical & fire alarm / fire sprinklers***

A building permit was issued to Fosler Portland Architecture for a project at 1675 N Willis Blvd:

Construct new 3 story (31) unit apartment building with associated site work and bike storage area in basement

A building permit was issued for a project at 1424 N Simpson St (previously 5833 N Maryland Ave):

New 3 story, 12 unit apartment building with detached trash enclosure under 120sq ft, includes associated sitework, roof trusses and floor joists ***DFS stair rail system ****mechanical to be obtained separately***

Weekly Roundup: District Office, J.K. Gill Building, Live Nation at Zidell Yards, and more

Renovation work will soon start at the J.K. Gill Building, which was acquired by Seattle-based developer Urban Renaissance Group after the Multnomah County Health Department left.

The Daily Journal of Commerce looked at how construction crews are navigating challenges* in building the Central Eastside’s District Office.

Renovation work is starting at the J.K. Gill Building at 408 SW 5th Ave, reports the Portland Business Journal. The 1923 building was formerly home to the Multnomah County Health Department, who are now located at the Gladys McCoy Building.

The Design Commission believes that the proposed Live Nation at Zidell Yards has room for improvement, writes the Portland Business Journal.

*This article will be unlocked for the rest of this week. After this week it will only be viewable by DJC subscribers.

Pepsi Blocks Phase 1A Approved by Design Commission (images)

The Design Commission has approved the first phase of the Pepsi Blocks, part of a nearly five acre masterplan which was approved in 2018. Phase 1A will include an eight-story, 85’ tall building with 219 residential units (including 80 bedrooms of affordable housing); nearly 13,000 sq ft of retail space; the restoration of the existing mid-century bow truss Pepsi pavilion building; a publicly accessible plaza; and portions of a woonerf along NE Pacific St. The project is being designed by Mithun for Security Properties. 164 vehicular parking spaces and will be provided in two levels of below grade parking. 247 long term bicycle parking spaces will be provided in a secure bike room, including 17 spaces for recumbent or cargo bikes.

Pepsi Blocks Phase 1A
Read More

Metro Reports: ART Tower, Troy Laundry, Portland Proper Hotel, and more

ART Tower Artists Repertory Theatre
A building permit was issued for the ART Tower, which will be built on the northern half of the Artists Repertory Theatre block, where a portion of theatre has now been demolished. A separate design review application was submitted for renovations to the remaining portion of the theatre on the southern half of the block.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers October 7th to October 13th 2019.

Early Assistance has been requested by Ankrom Moisan Architects for a project at 3719 SE Cesar E Chavez Blvd:

(4) Story multi-family affordable housing with 84 efficiency living units with shared community kitchens and amenity spaces.

Early Assistance has been requested for a project at 6815 N Richmond Ave:

Mixed Use Development. Add two structurally independent buildings to form level outdoor courtyard (for entrance accessibility) on sloped site. No change to existing office/warehouse structure. Project incorporates 2 commercial units. 3 residential units and 1 garage.

Early Assistance has been requested by Barghausen Consulting Engineers for a project at 1525 SE Grand Ave:

The proposal is for a building alteration and expansion of the existing Burger King fast food restaurant and drive-through to accommodate a 12,710 sf CVS/pharmacy with drive-through service with adjacent surface parking for 31 vehicles.

Early Assistance has been requested by Studio 3 Architecture for a project at 8004 SW Capitol Hill Rd:

Remove existing single family home and construct one new, 4-story, apartment building (with 60 units). Site work includes parking and amenities.

A Pre-Application Conference has been scheduled to discuss a project at 1025 SE Pine St:

Removal of existing building area on the northern half of the property (including a loading area and a garage) and to construct a 6-story addition to the property. The property is within the boundaries of the Troy Laundry Building, a historic landmark listed on the National Register of Historic Places.

The renovation of the Artists Repertory Theater at 1515 SW Morrison St has been submitted for a Type II Design Review by Lever Architecture:

Renovation of the existing 18,000sf Artist Repertory Theater (ART) building, which sits above two levels of below-grade parking on a 100’x200′ lot. The existing exterior walls and portions of the existing roof structure will remmain. The center bay of the roof will be restructured to accommodate a larger theater and second floor. The existing covered drive along SW Morrison St will be in-filled with new entry and lobby space. After the renovation, the total area will be approximately 28,000 sq ft plus below-grade parking.

The Portland Proper Hotel at 1202 NW Irving St has been submitted for a Type III Design Review by ZGF Architects:

Nine-story approximate 170,000 gsf full-service hotel including a ground floor lobby and one floor of below-grade parking. The project will utilize a tray-tyle eco-roof system at all available roof levels to the maximum extent reasonable. Adjustment for loading space.

A building permit was issued to Ankrom Moisan Architects for the ART Tower at 1510 SW Alder St:

New 21 story mixed-use residential and commercial development to include 314 apartments, ground floor amenities, top level amenity rooms and terrace and one ground level commercial space, and 3 levels of below grade parking

A building permit was issued to BAMA Architecture and Design for a project at 15225 SE Powell Blvd:

New two story 25 bed, 9987sf wood framed adult care home. 50 sq ft trash enclosure, landscaping

Weekly Roundup: Riverplace Redevelopment, Sideyard, Hyatt Centric, and more

The centerpiece of the Riverplace Redevelopment would be the “Portland Steps” at the corner of SW Montgomery Street and River Drive. The steps would lead people up to an elevated open space—and potentially to a bridge spanning over Harbor Drive to Naito Parkway.

Towers and terraces are imagined as part of the Riverplace Redevelopment, reports the Oregonian. At full build out the masterplan could include 2,500 apartments, 500 hotel rooms and 250,000 sq ft of office space.

Construction has finished* up at Sideyard, one of the “final pieces in the rapid redevelopment near the Burnside Bridge’s east end”, writes the Daily Journal of Commerce.

Masia by chef Jose Chesa will open as the anchor restaurant for the Hyatt Centric hotel, reports Portland Monthly.

The Business Tribune reported on how the $70 million renovation of Neuberger Hall, now known as Fariborz Maseeh Hall, has breathed new life and light into the Portland State University building.

Some businesses still bristling at having to pay Portland’s clean energy tax, reports the Oregonian. Included in the tax on “large retailers” are general contractors working on large projects, for clients including OHSU.

Portland Architecture looked at whether Sustainable Building Week can revive “Portland’s lost momentum”.

Portland Public Schools is eyeing a summer deadline to finalize details of a 2020 construction bond. The measure could include upgrades to Cleveland, Jefferson and Wilson high schools.

*This article will be unlocked for the rest of this week. After this week it will only be viewable by DJC subscribers.

Metro Reports: Hyatt Unbound, Conway Block 291E, New Industrial Revolution Center, and more

3rd & Salmon
A building permit was issued for the Hyatt Unbound hotel at SW 3rd and Salmon.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers September 30th to October 6th 2019.

Early Assistance has been requested by Hennebery Eddy Architects for the New Industrial Revolution Center at 920 SE Stark St:

Proposal is for a ten story tall building with a total area of 312,000 sf, including 220,000 sf of lab space, 28,000 sf of accessory meeting space, 15,000 sf of industrial office, and up to 5,000 sf of retail on the ground floor. Approximately 100 parking stalls will be provided below the ground floor, accessed near the SW corner of 9th and Washington.

Early Assistance has been requested by Carleton Hart Architecture for a project at the northeast corner of NE 42nd & Going:

New construction multi-family affordable housing project on the corner of NE 42nd & Going St

A Pre-Application Conference has been scheduled by SERA Architects to discuss a project at Conway Block 291E at the southwest corner of NW Raleigh & 20th:

6-story market-rate apartment building with 200 residential units and basement parking. Stormwater disposal will occur through drywells in the pedestrian way.

A Pre-Application Conference has been scheduled by Works Progress Architecture to discuss a project at 1835 N Flint Ave:

7-story multi-family building with tuck-under parking, open courtyard, active lobby/amenity and three townhouses at grade and 6 levels of residential above (117 units total). On site stormwater will be dealt with via dry wells.

The Adventist Medical Center at 1500 SE 96th Ave has been submitted for a Type III Design Review by Clark/Kjos Architects:

New four story medical office building.

The skybridge proposed as part of the Terwilliger Plaza Parkview Building at 2436 Southwest 6th Avenue has been submitted for a Type III Review:

Terwilliger Plaza submits this application for one encroachment in the public right-of-way over SW 6th Avenue. The skybridge is an integral element of Terwilliger Plaza’s expanding continuing care facility located on one contiguous site on both sides of SW 6th Avenue. The skybridge will span SW 6th, connecting the existing continuing care facilities on the west of SW 6th Avenue to the expanded facilities and units on the east side of SW 6th Avenue. The skybridge is a critical element of Terwilliger Plaza’s continuing care program.

A project at 5308 SE 18th Ave has been submitted for building permit review by Fosler Portland Architecture:

Construct new 3 story – 16 unit apartment building with attached trash enclosure on south side of building and associated site work to include storm water management

A building permit was issued to SERA Architects for Saltwood South at 2050 NW Raleigh St:

Saltwood South – new construction of 6 story, 177 residential unit apartment building (5 stories of Type IIIA over 1 story of Type 1 construction). There is one level of below grade parking. Ground floor consists of residential lobby, retail space, residential amenities, and dwelling units. The building occupies the full block and is configured around a south-facing private courtyard. Mechanical under 18-278466-MT

A building permit was issued for a project at 6580 N Greenwich Ave:

New 3 story, 12 unit apartment building with attached 138 S.F. Trash enclosure, includes associated sitework *** mechanical permit to be separate ***

A building permit was issued to Ankrom Moisan Architecture for the Hyatt Unbound at 245 SW Salmon St:

New 21 story hotel, 180,000 gross sq ftl with 250 guest rooms, ground floor retail, conference center, gym, groundfloor restaurant, bar/market, support spaces and rooftop restaurant and bar. Total project consists of 21 stories of Type 1 construction with one basement level. For reference set R2 6th floor 

Division 28 Homes Receive Design Advice (images)

Design Advice has been offered to Hacker architects for the Division 28 Homes, a 10-unit co-housing development proposed in the Richmond neighborhood. Urban Development Partners is acting as the owner’s representative. The project is being developed for one extended family, with members of varying ages, with the intention that family members are able to age in place. At the ground level the building would also include retail space and a restaurant with outdoor seating. 16 vehicular parking spaces are proposed in a below-grade garage.

Division 28 Homes
Read More

Weekly Roundup: Álmr Apartments, Live Nation at Zidell Yards, Glass Lab, and more

The proposed Live Nation at Zidell Yards music venue went in front of the Design Commission for an initial meeting last week.

Plans for the 10,000 seat Live Nation at Zidell Yards music venue are moving forward, according to the Oregonian.

Work to convert the former Vivian Apartments into the KEX Portland Hostel nearing completion*, writes the Daily Journal of Commerce.

The Oregonian wrote about developer C.E. John’s plans to construct a five story apartment building at 1137 NW 23rd Ave—a change in plans from an earlier proposal to renovate and expand the existing buildings on the site.

The Business Tribune wrote about how Glass Lab is offering a hip hub for start-ups. The building is named for the glass foundry formerly located into the recently renovated structure.

The Portland Business Journal wrote about the winners of this year’s DeMuro Awards, given by Restore Oregon for excellence in preservation, reuse, and community revitalization. Projects honored in Portland included the Álmr Apartments at NW 21st and Irving; the AltSource Headquarters at 1120 SE Madison St; the Redd on Salmon St; and the Woodlark Hotel.

*This article will be unlocked for the rest of this week. After this week it will only be viewable by DJC subscribers.

Metro Reports: Gooseberry Apartments, 3224 SW 12th, 1014 NE Alberta, and more

The Gooseberry Apartments at NE 148th and Glisan will include 44 units in five buildings, with all units reserved for those earning no more than 60% Area Median Income.

Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. This post covers September 23rd to September 29th 2019.

Early Assistance has been requested by Scotia Western States Housing for a project at 3224 SW 12th Ave:

15 unit multifamily project proposed to become part of a larger project to the north. Access would come off the existing project’s access on the parcel just north of the proposed project.

Early Assistance has been requested for a project at 11468 NE Holman St:

Development of a 4-story, 127 room hotel.

A project at 1014 NE Alberta St has been submitted for building permit review:

New 3-story 4 unit apartment building with associated site work

Buildings permits were issued to Doug Circosta for the Gooseberry Apartments at 450 NE 147th Ave (previously 14708 NE Glisan St):

1 of 5 new buildings, 3 story, 8 unit 100% affordable housing apartment building and associated site work. Tree removals. ***Mechanical permit to be separate***

2 of 5 new buildings, 3 story, 12 unit 100% affordable housing apartment building and associated site work. Tree removals. ***Mechanical permit to be separate***

3 of 5 new buildings, 3 story, 12 unit 100% affordable housing apartment building and associated site work. Tree removals. ***Mechanical permit to be separate***

4 of 5 new buildings, 3 story, 12 unit 100% affordable housing apartment building and associated site work.Tree removals. ***Mechanical permit to be separate***

5 of 5 new 100% affordable housing buildings community building with laundry and bathroom and associated sitework. Tree removals. ***Mechanical permit to be separate***